CDSCO License for Brachytherapy system remote after loading source transfer tube
Medical Device Information
Intended Use
The transfer tube, when attached to the applicator and the after loading system, provides a continuous closed passage that allows for moving either a radioactive source(s) and/or positioning markers from the shielded source storage compartment of the remote after loading brachytherapy system into appropriate positions within a brachytherapy applicator that has been positioned at a location either on the surface of, or within, the patient.

Comprehensive Guide to CDSCO Licensing for Brachytherapy System Remote After Loading Source Transfer Tube
At our consultancy, with over 25 years of experience and having supported more than 500 medical device companies, we understand the critical importance of timely and compliant regulatory approvals. The Brachytherapy System Remote After Loading Source Transfer Tube, classified as a Class C medical device under India's CDSCO framework, is a sophisticated radiotherapy apparatus essential for precise cancer treatment. Ensuring regulatory compliance for such devices is paramount to safeguard patient safety and meet Indian market requirements.
CDSCO Regulatory Framework for Brachytherapy System Transfer Tubes
The Central Drugs Standard Control Organisation (CDSCO) governs all medical device approvals in India. This device falls under the radiotherapy category and is classified as Class C due to its potential moderate to high risk, as per the government notification File No. 29/Misc./03/2020-DC (180) dated 6.8.2021. Consequently, manufacturers must obtain an MD9 manufacturing license from the Central Licensing Authority before production or import.
Risk Classification and License Requirements for Class C Devices
Class C devices like the brachytherapy transfer tube pose significant risks due to their direct involvement with radioactive sources. CDSCO mandates a stringent approval process involving:
- A Test License (Form MD13) to evaluate the product in government-approved labs
- Submission of detailed technical documentation including Device Master Files and Risk Management Files
- An on-site audit by CDSCO inspectors
- Final license grant via Form MD9
Manufacturers and importers must adhere strictly to these steps to avoid delays or rejections.
Manufacturing License Process (MD9) for Brachytherapy Transfer Tubes
The MD9 manufacturing license process typically spans 4 to 5 months. Here’s a practical timeline breakdown:
- Test License Application (Form MD13): Submit through the CDSCO MD Online Portal to obtain permission for sample testing. This step takes about 1.5 to 2 months.
- Product Testing: Conduct product testing at one of the government-approved testing laboratories. Testing ensures compliance with safety and performance standards.
- Document Preparation: Assemble all required documentation including Device Master File, Plant Master File, Risk Management File, and Essential Principles Checklist.
- Application Submission (Form MD7): Apply for the manufacturing license via the CDSCO portal.
- CDSCO Audit: Expect an on-site audit by CDSCO inspectors focusing on quality management systems and compliance.
- Queries and Clarifications: Address any queries raised promptly to avoid process delays.
- License Grant (Form MD9): Upon successful inspection and document review, the license is granted.
Manufacturing License Documents Required
To secure your MD9 license, prepare the following comprehensive documentation:
- Company constitution and registration certificates
- Proof of ownership or lease agreement for manufacturing premises
- Qualification and experience documents of technical staff
- Fire NOC and Pollution Control Board NOC
- Device Master File (DMF) detailing design, manufacturing, and specifications (detailed guide here)
- Plant Master File, outlining manufacturing facilities and processes (how to create a Plant Master File)
- Essential Principles Checklist confirming alignment with Indian regulatory requirements
- Risk Management File demonstrating hazard identification and mitigation strategies (risk management insights)
- Test reports from government-approved laboratories
- Product labels and Instructions for Use (IFU)
- Quality Management System (QMS) documentation, typically ISO 13485:2016 certified
Import License Process (MD15) for Brachytherapy Transfer Tubes
If you plan to import this Class C device to India, you must obtain an MD15 Import License granted by the CDSCO Central Licensing Authority. The process generally takes 5 to 6 months and involves:
- Preparing all mandatory documents including existing manufacturing license, Free Sale Certificate from the country of origin, ISO certificates, CE certificates, and technical files
- Applying via Form MD14 on the CDSCO MD Online Portal
- Addressing any departmental queries promptly
- Receiving final license grant in Form MD15
Key documents to submit include:
- Valid manufacturing license from the country of origin
- Free Sale Certificate
- ISO 13485:2016 certification
- CE Certificate
- Device Master File and Plant Master File
- Wholesale drug license for distribution
- Company constitution and address proof
Government fees vary by device class and number of products. For Class C devices, expect approximately Rs. 2,25,000 per site (converted from 1500 USD) as per current exchange rates.
Timeline and Processing Duration
Stage | Duration |
---|---|
Test License (MD13) | 1.5 - 2 months |
Product Testing | 1 - 1.5 months |
Document Preparation | 2 - 3 weeks |
License Application (MD9) | Submission to grant: 2 months |
CDSCO Audit | 1 - 2 weeks |
Query Resolution | 2 - 4 weeks |
Total estimated time: 4 - 5 months for manufacturing license.
Government Fees and Costs
- MD9 License Application Fee: Rs. 50,000 per application
- Per Product Fee: Rs. 1,000
- Test License (MD13): Included within the process; fees may vary
- Testing Costs: Dependent on laboratory and device complexity; expect Rs. 50,000 - Rs. 1,00,000 approximately per test
- Consultancy Fees: Variable, but investing in expert support can reduce delays and improve approval chances
Common Challenges and Solutions
Challenge 1: Delays in product testing
- Solution: Engage early with notified testing labs and ensure samples meet testing criteria to avoid retesting.
Challenge 2: Incomplete documentation leading to queries
- Solution: Use comprehensive checklists and templates for Device Master Files and Risk Management Files. Our detailed Device Master File guide can help ensure completeness.
Challenge 3: Audit non-compliance
- Solution: Prepare your manufacturing site and QMS per ISO 13485:2016 standards before audit. Conduct mock audits to identify gaps.
Challenge 4: Regulatory updates causing confusion
- Solution: Stay updated with CDSCO notifications and advisories. We provide ongoing regulatory monitoring as part of our services.
Expert Consultation and Support
Navigating CDSCO licensing for Class C devices requires precision and experience. Our firm has successfully guided over 500 companies through the MD9 licensing process for complex devices including radiotherapy components. We offer:
- End-to-end application preparation and submission
- Document drafting and review
- Coordination with notified bodies and government laboratories
- Pre-audit readiness assessments
- Post-approval compliance support
Getting Started with Your CDSCO License Application
- Assess your device classification and confirm it is Class C using resources such as our Medical Device Classification tool.
- Register on the CDSCO MD Online Portal to initiate your application.
- Prepare your Test License (MD13) application and submit it to begin the testing phase.
- Engage with accredited laboratories early to schedule testing and avoid bottlenecks.
- Compile all required documents—refer to our guides on Device and Plant Master Files.
- Plan for audit readiness by strengthening your QMS and manufacturing processes.
- Partner with experienced regulatory consultants to streamline your journey.
Embarking on the CDSCO licensing path for your Brachytherapy System Remote After Loading Source Transfer Tube is a complex but manageable process with the right expertise. Reach out to us to leverage our 25+ years of regulatory success and gain a competitive edge in the Indian medical device market.