CDSCO License for Cardiopulmonary bypass heart-lung machine console
Medical Device Information
Intended Use
A cardiopulmonary bypass heart- lung machine console is a device that consists of a control panel and the electrical power and control circuitry for a heart-lung machine. The console is designed to interface with the basic units used in a gas exchange system, including the pumps, oxygenator, and heat exchanger.

Introduction to Cardiopulmonary Bypass Heart-Lung Machine Console and Regulatory Importance
The Cardiopulmonary bypass heart-lung machine console is a critical cardiovascular device that serves as the control panel and power source for heart-lung machines. Specifically designed to interface with gas exchange system components such as pumps, oxygenators, and heat exchangers, this console ensures precise management of life-support systems during cardiac surgeries. Given its essential role and complexity, the device is classified as a Class B medical device under the CDSCO framework, reflecting moderate risk.
Navigating the regulatory landscape in India for such advanced cardiovascular equipment is paramount for manufacturers and importers aiming to enter or expand within the Indian market. Compliance with CDSCO regulations guarantees product safety, efficacy, and market authorization, which ultimately builds trust among healthcare providers and patients.
CDSCO Regulatory Framework for Cardiopulmonary Bypass Heart-Lung Machine Consoles
The Central Drugs Standard Control Organization (CDSCO) governs the regulation of medical devices in India under the Medical Device Rules, 2017. Devices are categorized into four risk classes (A, B, C, D) based on potential patient risk, with Class B representing moderate risk devices such as the cardiopulmonary bypass heart-lung machine console.
Manufacturers must secure a manufacturing license (MD5) for Class B devices, while importers require an import license (MD15). The licensing process involves product testing, documentation, audits, and adherence to Quality Management System (QMS) requirements.
Risk Classification and License Requirements for Class B Devices
As a Class B device, the cardiopulmonary bypass heart-lung machine console requires:
- Manufacturing License (MD5) issued by the State Licensing Authority.
- A mandatory test license (MD13) before full manufacturing license application.
- Product testing in government-approved laboratories.
- Audit by a notified body listed by CDSCO.
The detailed classification can be cross-verified on the Medical Device Classification guide.
Manufacturing License Process (MD5) for Cardiopulmonary Bypass Consoles
Test License Application (Form MD13): Initially, manufacturers must apply for a test license on the CDSCO MD Online Portal, which typically takes 1.5 to 2 months to process.
Product Testing: After receiving the test license, the device must be tested in CDSCO-approved laboratories. You can find the list of testing laboratories here.
Documentation Preparation: Prepare comprehensive documents including the Device Master File and Plant Master File, adhering to essential principles and risk management standards.
Application for Manufacturing License (Form MD3): Post testing and documentation, apply for the manufacturing license.
Audit by Notified Body: An audit is conducted by a notified body approved by CDSCO. Refer to the list of notified bodies to select an appropriate auditor.
Query Resolution: Respond promptly to any queries raised by the licensing authority or notified body.
Grant of Manufacturing License (Form MD5): Upon successful audit and document verification, the license is granted.
For detailed guidance, review our MD5 License Guide.
Manufacturing License Documents Required for Cardiopulmonary Bypass Consoles
Manufacturers should prepare the following mandatory documents:
- Company Constitution and Incorporation Certificates
- Proof of Premises Ownership or Lease Agreement
- Technical Staff Qualification and Experience Documents
- Fire Safety NOC
- Pollution Control Board NOC
- Device Master File detailing design, specifications, and manufacturing process (Device Master File Guide)
- Plant Master File outlining manufacturing facilities and quality control (Plant Master File Guide)
- Essential Principles Checklist confirming compliance
- Risk Management File specific to the device (Risk Management Guide)
- Test Reports from government-approved labs
- Product Labels and Instructions for Use (IFU)
- Quality Management System documents (ISO 13485:2016 preferred)
Import License Process (MD15) for Cardiopulmonary Bypass Consoles
Importers of the cardiopulmonary bypass heart-lung machine console must secure an MD15 import license from the CDSCO Central Licensing Authority. The process includes:
Document Preparation: Collate all required documents such as existing manufacturing license, Free Sale Certificate, ISO 13485:2016 certification, CE certificate (if applicable), Device and Plant Master Files, and Wholesale License.
License Application (Form MD14): Submit the application via the CDSCO MD Online Portal.
Queries and Clarifications: Address any departmental queries promptly.
Grant of Import License (Form MD15): Upon satisfying regulatory requirements, the license is issued.
Refer to our comprehensive Import License Guide for detailed steps.
Import License Documents Required
- Valid Manufacturing License from the country of origin
- Free Sale Certificate
- ISO 13485:2016 Certification
- CE Certificate (if applicable)
- Device Master File and Plant Master File
- Wholesale License
- Company Constitution Documents
- Proof of product compliance with Indian regulatory standards
Timeline and Processing Duration
- Test License (MD13): Approximately 1.5 to 2 months
- Product Testing: 3 to 4 weeks depending on testing laboratory workload
- Manufacturing License (MD5): 3 to 4 months from application submission, including audit and query resolution
- Import License (MD15): 5 to 6 months from application submission
These timelines are averages; early and thorough document preparation can accelerate processing.
Government Fees and Costs
For the cardiopulmonary bypass heart-lung machine console (Class B device), the fee structure is:
- MD5 Manufacturing License: Rs 5,000 per application plus Rs 500 per product
- Test License (MD13): Included within the manufacturing license process fees
- Import License (MD15): USD 2,000 per site plus USD 1,000 per product
Budgeting appropriately for these fees, along with costs for testing, notified body audits, and documentation preparation, is critical for smooth regulatory compliance.
Common Challenges and Solutions
- Delayed Test Reports: Partner with CDSCO-approved labs known for timely delivery to avoid bottlenecks.
- Incomplete Documentation: Utilize checklists and expert reviews to ensure all documents, such as Device Master Files and Risk Management Files, meet CDSCO standards.
- Audit Non-Conformities: Conduct internal pre-audit assessments to identify gaps and train technical staff accordingly.
- Query Resolution Delays: Establish a dedicated regulatory liaison team to respond promptly to CDSCO queries.
Our experience with 500+ successful licenses has shown that proactive planning, early engagement of notified bodies, and comprehensive documentation are keys to overcoming these challenges.
Expert Consultation and Support
With over 25 years of regulatory consultancy experience, we provide end-to-end support for medical device licensing, including:
- Gap analysis and documentation preparation
- Coordination with notified bodies and testing labs
- Regulatory strategy tailored to Class B cardiovascular devices
- Training and compliance audits
Our customized approach ensures manufacturers and importers achieve timely approvals and maintain compliance.
Getting Started with Your CDSCO License Application
- Assess Your Device Classification: Confirm your device is Class B according to the CDSCO Medical Device Rules.
- Prepare Preliminary Documentation: Gather company, technical, and quality documents.
- Apply for Test License (MD13): Submit your application on the CDSCO MD Online Portal promptly.
- Plan for Product Testing: Identify and coordinate with authorized testing laboratories.
- Engage a Notified Body Early: Schedule audits in advance to accommodate timelines.
- Develop Device and Plant Master Files: Utilize expert guides to ensure compliance.
- Budget for Fees and Testing Costs: Allocate funds to prevent delays.
Starting with these actionable steps will position your organization for a successful CDSCO license acquisition for your cardiopulmonary bypass heart-lung machine console. For personalized assistance, our expert team is ready to guide you through each phase with proven strategies and regulatory insight.