CDSCO License for Cardiopulmonary bypass pulsatile flow generator
Medical Device Information
Intended Use
A cardiopulmonary bypass pulsatile flow generator is an electrically and pneumatically operated device used to create pulsatile blood flow. The device is placed in a cardiopulmonary bypass circuit downstream from the oxygenator.

Introduction: Cardiopulmonary Bypass Pulsatile Flow Generator and Regulatory Importance
A Cardiopulmonary Bypass Pulsatile Flow Generator is a sophisticated medical device used in cardiovascular surgeries to generate pulsatile blood flow during cardiopulmonary bypass. Operating electrically and pneumatically, it integrates downstream of the oxygenator to ensure effective circulation mimicking natural heart rhythms. Given its critical role and high-risk classification (Class D), stringent regulatory oversight by the Central Drugs Standard Control Organization (CDSCO) is mandatory before market entry in India.
Navigating the CDSCO licensing process for this device can be complex, but with over 25 years of experience supporting 500+ companies, we provide you with clear, actionable steps to obtain your MD9 Manufacturing License efficiently.
CDSCO Regulatory Framework for Cardiopulmonary Bypass Pulsatile Flow Generators
The CDSCO governs the approval and licensing of medical devices in India under the Medical Device Rules, 2017. Cardiopulmonary bypass pulsatile flow generators fall under the Cardiovascular device category and are classified as Class D devices — the highest risk category due to their life-supporting function.
As per the CDSCO's notification (29/Misc./03/2020-DC (159), dated 26.7.2021), manufacturers must comply with the central regulatory requirements and obtain the MD9 license before manufacturing or marketing this device in India.
Risk Classification and License Requirements
- Device Risk Class: D (High Risk)
- Regulatory Authority: Central Licensing Authority (CDSCO HQ)
- Required License: MD9 Manufacturing License (Application Form MD7)
Class D devices require detailed technical documentation, product testing, and a rigorous audit by CDSCO inspectors due to their criticality.
Manufacturing License Process (MD9) for Class D Devices
The MD9 license process typically spans 4 to 5 months and involves the following key stages:
- Test License (MD13): Obtain a test license which takes approximately 1.5–2 months. This permits product testing in government-approved laboratories.
- Product Testing: Conduct mandatory testing of the device as per applicable Indian standards in CDSCO-recognized labs.
- Document Preparation: Compile comprehensive technical documentation including Device Master File, Plant Master File, Risk Management File, and Quality Management System (QMS) documents.
- MD9 Application Submission (Form MD7): Submit the manufacturing license application through the CDSCO MD Online Portal.
- CDSCO Audit: Facilitation of an on-site audit by CDSCO inspectors to verify manufacturing facilities and compliance.
- Query Resolution: Promptly address any queries or deficiencies raised by CDSCO.
- License Grant (Form MD9): Upon satisfactory review and compliance, the MD9 license is granted.
For detailed guidance, refer to our in-depth MD9 License Guide.
Manufacturing License Documents Required for Cardiopulmonary Bypass Pulsatile Flow Generator
Preparing your documentation meticulously is critical to avoid delays. Essential documents include:
- Company Constitution (Memorandum and Articles of Association)
- Proof of ownership or lease agreement of manufacturing premises
- Details and qualifications of technical and managerial staff
- Fire NOC and Pollution Control Board NOC
- Device Master File (DMF): Detailed device description, specifications, manufacturing process, and design controls. Our Device Master File Guide offers comprehensive insights.
- Plant Master File (PMF): Information about manufacturing facilities, infrastructure, and equipment. See our Plant Master File Guide for best practices.
- Essential Principles Checklist confirming compliance with Indian standards
- Risk Management File documenting hazard analysis and mitigation strategies. Implementing robust risk management is crucial for Class D devices.
- Product test reports from CDSCO-approved testing laboratories (refer to the Testing Laboratories list)
- Labeling and Instructions for Use (IFU) compliant with CDSCO requirements
- Quality Management System (QMS) documentation, typically ISO 13485:2016 certified
Import License Process (MD15) for Cardiopulmonary Bypass Pulsatile Flow Generator
Importers of Class D cardiovascular devices must obtain an MD15 Import License from CDSCO. This process generally takes 5 to 6 months and includes:
- Document preparation including manufacturing license, Free Sale Certificate, ISO 13485:2016 certification, CE Certificate, Device & Plant Master Files, and wholesale license.
- Application submission on CDSCO MD Online Portal
- Review and resolution of queries by CDSCO
- License grant upon compliance
Fees for Class D imports are approximately INR 3,000 per site and INR 1,500 per product.
For detailed steps, consult our Import License Guide.
Timeline and Processing Duration
Process Step | Duration |
---|---|
Test License (MD13) | 1.5–2 months |
Product Testing | 2–3 weeks |
Document Preparation | 3–4 weeks |
MD9 Application Processing | 2–3 months |
CDSCO Audit & Query Resolution | 1 month |
Total Estimated Time | 4–5 months |
Proactive preparation and early engagement with notified bodies and testing labs can significantly reduce delays.
Government Fees and Costs
- MD9 License Application Fee: INR 50,000 per application
- Product Fee: INR 1,000 per product
- Test License Fee (MD13): nominal fees applicable
- Additional costs: Testing lab fees, notified body audit charges, and consultant fees if engaged
Budgeting accurately for these fees helps avoid surprises during the licensing cycle.
Common Challenges and Solutions
Challenge 1: Delayed test license approval
- Solution: Submit complete and error-free MD13 applications with all required documents to expedite approval.
Challenge 2: Incomplete technical documentation
- Solution: Utilize standardized templates for DMF, PMF, and Risk Management Files. We provide tailored document packages to simplify compliance.
Challenge 3: Non-compliance during audit
- Solution: Conduct pre-audit internal reviews and engage a notified body early. Refer to the Notified Bodies List to select an experienced auditor.
Challenge 4: Prolonged query resolution
- Solution: Assign dedicated regulatory personnel to respond promptly and thoroughly to CDSCO queries.
Expert Consultation and Support
With over 25 years assisting 500+ clients, our consultancy offers end-to-end support—from documentation drafting to audit preparation and submission via the CDSCO MD Online Portal. Our expertise in Class D cardiovascular devices ensures smooth approvals and market entry.
We also offer customized training on risk management, QMS implementation, and regulatory updates to keep your team compliant and ready.
Getting Started with Your CDSCO License Application
- Assess your device classification: Confirm Class D status using the CDSCO classification guidelines.
- Prepare your test license application (Form MD13): Gather all required documentation for submission.
- Identify a CDSCO-approved testing laboratory: Early engagement can expedite testing schedules.
- Compile your Device and Plant Master Files: Use expert templates to ensure completeness.
- Register and apply on the CDSCO MD Online Portal: Create your account and familiarize yourself with the submission process.
- Schedule pre-audit checks: Conduct mock audits internally or with consultants.
- Plan for timely query responses: Allocate resources to handle CDSCO communications promptly.
Embarking on the licensing journey for your Cardiopulmonary Bypass Pulsatile Flow Generator with the right strategy and support can fast-track your Indian market entry. Contact our experts today to get your customized roadmap and compliance toolkit.
For comprehensive regulatory assistance and to learn more about the MD9 licensing process, visit our detailed MD9 License Guide.
Ensure your cardiovascular device meets all Indian regulatory mandates and serves patients safely with confidence.