Logo
Chat on WhatsApp

CDSCO License for Epidural anaesthesia kit

Medical Device Information

Device Class
Class C

Intended Use

A collection of devices intended to be used to deliver an  analgesic or anaesthetic agent to the epidural space for pain management.

Manufacturing License
MD9
Import License
MD15
CDSCO License for Epidural anaesthesia kit

Comprehensive Guide to CDSCO Licensing for Epidural Anaesthesia Kits (Class C)

Epidural anaesthesia kits are critical medical devices in anesthesiology, designed to deliver analgesic or anaesthetic agents to the epidural space for effective pain management. Given their invasive nature and direct impact on patient safety, these devices fall under Class C risk classification as per CDSCO regulations. Navigating the licensing process for such devices in India requires expert knowledge of regulatory frameworks, timelines, and documentation.

With over 25 years of experience and having assisted 500+ companies in securing CDSCO licenses, we provide you with a practical roadmap to obtain your manufacturing (MD9) and import (MD15) licenses efficiently.


CDSCO Regulatory Framework for Epidural Anaesthesia Kits

The Central Drugs Standard Control Organization (CDSCO) governs the approval and licensing of medical devices in India. The regulatory notification specific to Epidural Anaesthesia Kits is 29/Misc/03/2020-DC(177), dated 12.07.2021, which classifies this device as Class C.

Class C devices are considered moderate to high risk and require stringent compliance with quality, safety, and performance standards before they can be manufactured or imported into India.

Risk Classification and License Requirements for Epidural Anaesthesia Kits

As a Class C device, your Epidural Anaesthesia Kit requires a manufacturing license under MD9 and an import license under MD15.

  • Manufacturing License (MD9): Issued by the Central Licensing Authority, this license is mandatory for domestic manufacturing of Class C devices.
  • Import License (MD15): Also granted by the Central Licensing Authority, this license is required for importing Class C devices into India.

Refer to the detailed Medical Device Classification guide to understand classification nuances.

Manufacturing License Process for Epidural Anaesthesia Kits (MD9)

Obtaining an MD9 license is a multi-step process that generally takes around 4-5 months. The key stages include:

  1. Test License (Form MD13): Initially, apply for a test license which takes approximately 1.5-2 months. This allows you to manufacture the device for testing purposes.

  2. Product Testing: Conduct mandatory product tests at CDSCO-approved laboratories. For Epidural Anaesthesia Kits, tests include biocompatibility, sterility, performance, and safety. You can find approved labs on the Testing Laboratories list.

  3. Documentation Preparation: Compile the required documents including Device Master File, Plant Master File, Risk Management File, and Essential Principles Checklist.

  4. Application Submission: Submit the MD9 application (Form MD7) via the CDSCO MD Online Portal.

  5. Audit by CDSCO Inspectors: After document scrutiny, expect a detailed audit of your manufacturing facility and quality systems.

  6. Query Resolution: Address any queries raised by CDSCO or auditors promptly.

  7. Grant of License: Upon satisfactory compliance, the MD9 manufacturing license will be granted.

For a step-by-step breakdown, see our MD9 License Guide.

Manufacturing License Documents Required

To streamline your application, ensure you have the following documents ready:

  • Company Constitution (e.g., MOA, AOA)
  • Proof of ownership or lease of manufacturing premises
  • Technical staff qualifications and experience
  • Fire NOC and Pollution Control Board NOC
  • Device Master File (DMF) detailing device design and specifications (Device Master File Guide)
  • Plant Master File (PMF) describing manufacturing processes (Plant Master File Guide)
  • Essential Principles Checklist confirming compliance with Indian Medical Device Rules
  • Risk Management File detailing hazard analysis and mitigation strategies (Risk Management)
  • Product Test Reports from government-approved labs
  • Labels and Instructions for Use (IFU)
  • Quality Management System (QMS) documentation, preferably ISO 13485:2016 certified

Import License Process for Epidural Anaesthesia Kits (MD15)

For companies intending to import Epidural Anaesthesia Kits, the MD15 import license process takes approximately 5-6 months and involves:

  1. Document Preparation: Collect all necessary documents including manufacturing license from the country of origin, Free Sale Certificate, ISO certification, CE Certificate (if applicable), and detailed Device Master and Plant Master Files.

  2. Application Submission: File the application on Form MD14 via the CDSCO MD Online Portal.

  3. Review and Queries: CDSCO evaluates your submission and may request clarifications.

  4. License Grant: Upon satisfactory review, the import license (MD15) is issued.

For detailed assistance, refer to our Import License Guide.

Import License Documents Required

Ensure the following documents are prepared:

  • Valid Manufacturing License from the country of manufacture
  • Free Sale Certificate from the exporting country
  • ISO 13485:2016 Quality Management System certificate
  • CE Certificate if exported from European countries
  • Device Master File and Plant Master File
  • Wholesale license in India (if applicable)
  • Company Constitution documents

Timeline and Processing Duration

License TypeProcess Duration
Test License (MD13)1.5 - 2 months
Manufacturing License (MD9)4 - 5 months (including test license and audit)
Import License (MD15)5 - 6 months

Timelines may vary depending on document completeness and audit scheduling. Early preparation and prompt query resolution can significantly reduce delays.

Government Fees and Costs

License TypeApplication FeePer Product Fee
MD9 Manufacturing LicenseRs 50,000Rs 1,000
MD15 Import License (Class C)Rs 3,000 USD/siteRs 1,500 USD/product

Additional costs include testing fees at government-approved labs and consultancy fees if using expert services.

Common Challenges and Solutions

  • Incomplete Documentation: Many applicants face delays due to missing critical documents like Fire NOC or Risk Management Files. Solution: Use our comprehensive document checklists and templates to ensure completeness.

  • Delayed Product Testing: Testing in government-approved labs can bottleneck timelines due to heavy demand. Solution: Schedule tests early and opt for labs with shorter lead times from the Testing Laboratories list.

  • Audit Non-compliance: Facilities often fail audits due to inadequate QMS or mismatched documentation. Solution: Conduct internal audits and gap assessments prior to CDSCO inspections.

  • Query Resolution Delays: Slow responses to CDSCO queries extend processing. Solution: Assign dedicated regulatory personnel for timely communication.

Expert Consultation and Support

Navigating CDSCO licensing for Class C devices like the Epidural Anaesthesia Kit can be intricate. Our seasoned regulatory consultants have successfully guided 500+ manufacturers and importers through this journey. We assist with:

  • Document preparation including DMF, PMF, and Risk Management Files
  • Coordination with notified bodies and government labs
  • Audit readiness and mock inspections
  • Timely submission and query management

Engage with us early to minimize risks and accelerate market entry.

Getting Started with Your CDSCO License Application

  1. Classify Your Device: Confirm your device’s risk class as Class C using the Medical Device Classification resource.

  2. Gather Documents: Begin compiling all mandatory documents focusing on quality systems, technical files, and regulatory certificates.

  3. Apply for Test License: Submit Form MD13 on the CDSCO MD Online Portal to obtain your test license.

  4. Schedule Product Testing: Book your product tests at CDSCO-approved labs promptly.

  5. Prepare for Audit: Align your manufacturing or import premises to comply with CDSCO audit standards.

  6. Submit Final Application: Once testing and documentation are ready, apply for your MD9 or MD15 license accordingly.

  7. Monitor and Respond: Stay proactive in responding to queries and audit observations.

By following this detailed, experience-backed roadmap, manufacturers and importers of Epidural Anaesthesia Kits can confidently navigate the CDSCO licensing process, ensuring timely market access and regulatory compliance.

For personalized assistance, reach out to us to leverage our 25+ years of expertise in medical device regulatory affairs.

Get Expert Help

Free consultation for your medical device license

24/7 Support Available

Why Choose Us

500+ Licenses Obtained
100% Success Rate
15+ Years Experience
24/7 Support Available

About the Author

avatar
Tails Azimuth
@Twitter