CDSCO License for Foetal/maternal multiple physiological parameter simulation kit
Medical Device Information
Intended Use
To imitate a variety of physiological parameters and conditions (both foetal and maternal) expressed during pregnancy in order to test and calibrate foetal and patient monitoring and recording equipment, check patient cable continuity, or train healthcare providers.

Introduction: Understanding Foetal/Maternal Multiple Physiological Parameter Simulation Kits and Regulatory Importance
The foetal/maternal multiple physiological parameter simulation kit is a specialized medical device designed to simulate various physiological parameters and conditions that occur during pregnancy. Its primary use is to test, calibrate, and validate foetal and patient monitoring systems, ensure patient cable continuity, and provide realistic training scenarios for healthcare providers. Given its critical role in obstetrical and gynecological care, regulatory oversight is paramount to ensure safety, effectiveness, and compliance with Indian medical device standards.
We have supported over 500 manufacturers and importers in navigating the complex CDSCO licensing process, particularly for Class B devices like this simulation kit. This guide provides practical, detailed insights into obtaining the necessary CDSCO license to market this device in India.
CDSCO Regulatory Framework for Foetal/Maternal Simulation Kits
Under the Drugs and Cosmetics Act, 1940, the Central Drugs Standard Control Organization (CDSCO) regulates medical devices, classifying them based on risk. The foetal/maternal simulation kit falls under the obstetrical and gynecological category and is classified as a Class B device due to moderate risk associated with simulation and calibration functions.
CDSCO mandates that Class A and B devices require a manufacturing license (MD5) issued by the respective State Licensing Authority. The manufacturer must comply with technical, quality, and safety requirements, including product testing, documentation, and audits.
Risk Classification and License Requirements for Class B Devices
Class B devices represent low to moderate potential risk. For the foetal/maternal multiple physiological parameter simulation kit, the MD5 license is mandatory. This license ensures that the device meets essential performance standards and that the manufacturing site complies with Good Manufacturing Practices (GMP).
Key points for Class B devices:
- License Type: MD5 (Manufacturing License)
- Licensing Authority: State Licensing Authority
- Application Form: MD3
- Total Processing Time: Approximately 3-4 months
- Testing: Mandatory product testing in CDSCO-approved laboratories
For detailed classification guidance, manufacturers may refer to the Medical Device Classification resource.
Manufacturing License Process (MD5) for Foetal/Maternal Simulation Kits
The MD5 license process is multi-step and requires strategic planning:
Test License (Form MD13): Before full manufacturing approval, a test license is obtained to produce sample products for testing. The test license takes about 1.5 to 2 months to process.
Product Testing: Samples must be tested in CDSCO-recognized laboratories to validate compliance with Indian standards. Testing labs can be found on the Testing Laboratories list.
Documentation Preparation: Compile technical files, quality management system (QMS) documents, and other mandatory documents.
License Application (Form MD3): Submit the manufacturing license application through the CDSCO MD Online Portal.
Audit by Notified Body: An audit of the manufacturing facility by a notified body is required. Refer to the list of notified bodies authorized to conduct MD5 audits.
Resolution of Queries: Address any observations or queries raised by CDSCO or the notified body promptly.
Grant of License (Form MD5): Upon satisfactory compliance, the license is granted.
For a comprehensive overview, see our dedicated MD5 License Guide.
Manufacturing License Documents Required
Manufacturers should prepare the following key documents for the MD5 application:
- Company Constitution (Incorporation Certificate, MOA/AOA)
- Proof of Ownership or Lease of Manufacturing Premises
- Details and Qualifications of Technical Staff
- Fire NOC and Pollution Control Board NOC
- Device Master File (DMF) detailing design, manufacturing process, and safety
- Plant Master File outlining manufacturing site details and GMP compliance
- Essential Principles Checklist verifying compliance with Indian regulations
- Risk Management File demonstrating hazard identification and mitigation strategies
- Test Reports from CDSCO-approved laboratories
- Product Labels and Instructions for Use (IFU) aligned with regulatory requirements
- Quality Management System documentation (e.g., ISO 13485 certification, SOPs)
Our Device Master File guide and Plant Master File guide provide in-depth assistance in preparing these documents effectively.
Import License Process (MD15) for Foetal/Maternal Simulation Kits
Importers of this device must secure an MD15 license from the Central Licensing Authority. While the MD15 license process for Class B devices is more streamlined than manufacturing, it involves the following steps:
- Document preparation including Manufacturing License of the overseas manufacturer, Free Sale Certificate, ISO 13485:2016 and CE Certificates, Device Master File, Plant Master File, and Wholesale License.
- Application submission on the CDSCO MD Online Portal.
- Review and resolution of queries by CDSCO.
- Grant of MD15 license within approximately 5-6 months.
For detailed guidance, refer to our Import License Guide.
Import License Documents Required
Key documents for MD15 license include:
- Manufacturing License of the foreign manufacturer
- Free Sale Certificate from the country of origin
- ISO 13485:2016 and CE Certification
- Device Master File
- Plant Master File
- Wholesale License/Distribution License in India
- Company Constitution documents
Timely preparation of these documents ensures smoother application processing.
Timeline and Processing Duration
License Type | Process Steps | Duration |
---|---|---|
Test License (MD13) | Sample manufacturing & testing | 1.5 - 2 months |
MD5 Manufacturing License | Documentation, audit, queries | 3 - 4 months |
MD15 Import License | Document review & approval | 5 - 6 months |
Manufacturers should factor in testing and audit timeframes and prepare for potential queries to avoid delays.
Government Fees and Costs
For the foetal/maternal multiple physiological parameter simulation kit (Class B), the CDSCO fees are:
- MD5 License:
- Application Fee: Rs 5,000
- Per Product Fee: Rs 500
- Test License (MD13): Usually nominal, included in process
Practical Tip: Budget for additional costs such as notified body audit fees, testing laboratory charges, and consultancy support to ensure compliance.
Common Challenges and Solutions
Challenge 1: Delays in Sample Testing
- Solution: Engage with CDSCO-approved labs early, confirm testing scope, and submit samples promptly.
Challenge 2: Document Completeness and Accuracy
- Solution: Use standardized templates and cross-verify with regulatory checklists. Our master file guides can streamline this.
Challenge 3: Audit Non-Compliance
- Solution: Conduct internal audits and gap assessments prior to notified body visits.
Challenge 4: Query Resolution Delays
- Solution: Assign experienced regulatory professionals to respond quickly and comprehensively.
Expert Consultation and Support
With over 25 years of expertise and having supported 500+ companies, we offer end-to-end assistance from initial classification to license grant. Our services include:
- Gap analysis and regulatory strategy
- Documentation preparation and review
- Coordination with CDSCO, notified bodies, and testing labs
- Audit readiness and post-audit support
- Training for regulatory affairs teams
Partnering with seasoned consultants can significantly reduce turnaround times and enhance approval success rates.
Getting Started with Your CDSCO License Application
If you are planning to manufacture or import the foetal/maternal multiple physiological parameter simulation kit in India, start with these practical steps:
- Classify Your Device: Confirm your device’s Class B status via the CDSCO framework.
- Apply for Test License (MD13): Prepare preliminary technical documentation and submit your application via the CDSCO MD Online Portal.
- Coordinate Sample Testing: Engage with notified testing laboratories early to avoid bottlenecks.
- Prepare Master Files: Develop comprehensive Device and Plant Master Files following best practices.
- Schedule Notified Body Audit: Identify a notified body from the official list and book your audit.
- Compile Final Application: Assemble all required documents and submit Form MD3 for the MD5 license.
- Monitor Application Progress: Regularly check status and respond promptly to any CDSCO queries.
By following these steps and leveraging expert support, you can navigate the licensing pathway efficiently and bring your foetal/maternal physiological simulation kit to the Indian market with confidence.
For further personalized guidance, please contact our regulatory consulting team specializing in CDSCO medical device approvals.