CDSCO License for Gastrointestinal catheter/endoscope tracking system
Medical Device Information
Intended Use
A multicomponent assembly of mains electricity (AC-powered) devices designed for real-time visualization/navigation of a catheter and/or endoscope during insertion in the gastrointestinal tract, by detecting its position/movement within an electromagnetic (EM) field and displaying three- dimensional (3-D) virtual images on a monitoring screen.

Comprehensive Guide to CDSCO Licensing for Gastrointestinal Catheter/Endoscope Tracking Systems
As a seasoned regulatory consultancy with over 25 years of experience and having assisted more than 500 companies in navigating the CDSCO licensing landscape, we understand the challenges manufacturers and importers face when bringing sophisticated medical devices like Gastrointestinal catheter/endoscope tracking systems to the Indian market. This device, classified as Class B under the CDSCO framework, demands stringent compliance to ensure patient safety and regulatory adherence.
Understanding the Gastrointestinal Catheter/Endoscope Tracking System
This device is a complex, multicomponent assembly powered by mains electricity (AC-powered), designed to provide real-time visualization and navigation of catheters and endoscopes within the gastrointestinal tract. It operates by detecting position and movement within an electromagnetic field, rendering three-dimensional virtual images on a monitor. Given its critical role in gastroenterology diagnostics and interventions, it falls under risk Class B, necessitating a thorough regulatory approach.
CDSCO Regulatory Framework for Gastrointestinal Catheter/Endoscope Tracking Systems
The Central Drugs Standard Control Organization (CDSCO) governs the regulation of medical devices in India. For Class B devices like this tracking system, the regulatory pathway involves obtaining the MD5 manufacturing license from the State Licensing Authority. The process ensures the device meets safety, quality, and performance standards as stipulated under the Medical Device Rules, 2017.
Risk Classification and License Requirements
Our device is designated as Class B, which corresponds to low to moderate risk. According to CDSCO guidelines, manufacturing Class B devices requires an MD5 license (application via Form MD3). The process is overseen by State Authorities and typically spans 3 to 4 months, encompassing test licensing, product testing, document submission, and audits.
For detailed classification insights, manufacturers can refer to Medical Device Classification.
Manufacturing License Process (MD5)
The MD5 license process for your gastrointestinal catheter/endoscope tracking system involves several key stages:
- Test License Application (Form MD13): Initially, you must apply for a test license, valid for 12 months, enabling product testing in government-approved laboratories.
- Product Testing: Conduct comprehensive testing of the device at CDSCO-approved labs to ensure compliance with safety and performance standards. Refer to the Testing Laboratories list for authorized facilities.
- Document Preparation: Compile mandatory documents including Device Master File, Plant Master File, Essential Principles Checklist, Risk Management File, and others.
- License Application (Form MD3): Submit the manufacturing license application via the CDSCO MD Online Portal along with requisite fees.
- Audit by Notified Body: An audit conducted by a CDSCO-recognized notified body validates your manufacturing processes and quality systems. You can check the list of notified bodies authorized for MD5 audits.
- Query Resolution: Address any departmental or audit queries promptly to avoid delays.
- Grant of License (Form MD5): Upon successful completion of all steps, the license is granted.
For a comprehensive overview, consult our MD5 License Guide.
Manufacturing License Documents Required
To facilitate a smooth approval process, ensure you have the following documents ready:
- Company Constitution (e.g., MOA, AOA)
- Proof of ownership or lease of manufacturing premises
- Qualification and experience documents of technical staff
- Fire NOC and Pollution Control Board NOC
- Device Master File (DMF) detailing design, specifications, and manufacturing processes (Device Master File guide)
- Plant Master File (PMF) outlining manufacturing facility details (Plant Master File guide)
- Essential Principles Checklist demonstrating compliance with safety and performance standards
- Risk Management File documenting hazard analysis and mitigation (Risk Management)
- Product Test Reports from approved laboratories
- Labels and Instructions for Use (IFU)
- Quality Management System (QMS) documents, typically ISO 13485:2016 certification
Import License Process (MD15) for Gastrointestinal Catheter/Endoscope Tracking Systems
If you plan to import this device instead of manufacturing locally, you must obtain the MD15 import license from the Central Licensing Authority. The process generally takes 5 to 6 months and does not require a test license.
Steps include:
- Preparing documentation such as manufacturing license from the country of origin, Free Sale Certificate, ISO 13485:2016, CE Certificate, Device and Plant Master Files, Wholesale License, and Company Constitution.
- Applying via Form MD14 on the CDSCO MD Online Portal.
- Resolving any queries from CDSCO.
- License issuance in Form MD15.
For detailed guidance, see our Import License Guide.
Import License Documents Required
- Valid manufacturing license from the country of origin
- Free Sale Certificate
- ISO 13485:2016 certificate
- CE Certificate or equivalent
- Device Master File and Plant Master File
- Wholesale Drug License
- Company Constitution documents
Timeline and Processing Duration
Process Step | Estimated Duration |
---|---|
Test License (MD13) | 1.5 to 2 months |
Product Testing | 2 to 3 weeks |
Document Preparation | Variable (typically 2-3 weeks) |
License Application & Audit | 1.5 to 2 months |
Query Resolution | 2 to 4 weeks |
Total for MD5 License | Approximately 3 to 4 months |
For imports (MD15 license), the total timeline is approximately 5 to 6 months.
Government Fees and Costs
For MD5 Manufacturing License:
- Application fee: ₹5,000 per application
- Product fee: ₹500 per product
Additional costs include:
- Testing fees at government-approved laboratories (varies by test complexity)
- Audit fees payable to notified bodies
- Documentation and consultancy charges (if outsourced)
Common Challenges and Solutions
Challenge: Delays in test report acquisition due to backlog at testing labs.
Solution: Early engagement with authorized labs and pre-scheduling tests can mitigate delays.
Challenge: Incomplete documentation leading to query back-and-forth.
Solution: Utilize comprehensive checklists and expert reviews before submission to ensure completeness.
Challenge: Audit non-conformities related to QMS and facility compliance.
Solution: Conduct internal audits and pre-assessment by third parties to identify gaps.
Challenge: Misclassification of device risk leading to incorrect license applications.
Solution: Refer to official classification resources and expert consultation to confirm device class.
Expert Consultation and Support
Navigating the CDSCO regulatory environment for a complex device like the gastrointestinal catheter/endoscope tracking system can be daunting. Our consultancy leverages decades of expertise to provide end-to-end support—from risk classification and document preparation to audit readiness and license application.
We recommend early consultation to:
- Clarify classification and regulatory pathway
- Prepare and review Device and Plant Master Files
- Coordinate with notified bodies and testing labs
- Resolve queries swiftly
Getting Started with Your CDSCO License Application
- Confirm Device Classification: Verify your device is Class B using official guidelines.
- Prepare Documentation: Begin compiling essential files including Device Master File, Plant Master File, and test protocols.
- Apply for Test License (Form MD13): Submit your test license application via the CDSCO MD Online Portal to initiate product testing.
- Engage with Testing Labs: Schedule product testing with government-approved labs.
- Arrange Audit Preparation: Identify and coordinate with a notified body for your MD5 audit.
- Submit Manufacturing License Application (Form MD3): Once testing and documentation are complete, apply for the manufacturing license.
- Address Queries Promptly: Respond comprehensively and quickly to any CDSCO or audit-related queries.
Starting early and maintaining meticulous records is critical to success. We invite you to leverage our expertise to streamline your licensing journey and confidently enter the Indian medical device market with your gastrointestinal catheter/endoscope tracking system.