CDSCO License for Haemodialysis conductivity standard solution
Medical Device Information
Intended Use
Intended to calibrate conductivity meters used to test the conductivity of dialysate, dialysate concentrate, and water treatment systems used with haemodialysis delivery systems.

Comprehensive CDSCO Licensing for Haemodialysis Conductivity Standard Solution (Class C Device)
At our consultancy, with over 25 years of experience and having aided over 500 companies in securing CDSCO licenses, we understand the intricate regulatory landscape for medical devices in India. This is especially true for specialized products such as the Haemodialysis conductivity standard solution—a Class C medical device crucial for nephrology and renal care.
Introduction: Understanding the Haemodialysis Conductivity Standard Solution and Its Regulatory Importance
The Haemodialysis conductivity standard solution is designed to calibrate conductivity meters that test the conductivity of dialysate, dialysate concentrate, and water treatment systems used in haemodialysis delivery systems. Ensuring calibration accuracy is critical for patient safety during dialysis treatments. Given its role, this device falls under CDSCO's Class C medical device category, necessitating stringent regulatory compliance to assure quality, safety, and efficacy.
CDSCO Regulatory Framework for Haemodialysis Conductivity Standard Solution
Medical devices in India are regulated by the Central Drugs Standard Control Organization (CDSCO) under the Medical Device Rules, 2017. The device's classification influences the licensing pathway. As a Class C device, the Haemodialysis conductivity standard solution requires a Central Licensing Authority (CLA) manufacturing license known as the MD9 license.
Risk Classification and License Requirements
- Risk Class: C (Moderate to High Risk)
- Regulatory Requirement: Manufacturing license under Form MD7 (MD9 license)
- Authority: Central Licensing Authority
For detailed classification, manufacturers can refer to the Medical Device Classification guide.
Manufacturing License Process (MD9)
The MD9 license process is comprehensive, reflecting the higher risk associated with Class C devices. The steps include:
- Test License (Form MD13): Before the manufacturing license, you must obtain a test license valid for 12 months. This process takes approximately 1.5 to 2 months.
- Product Testing: Conduct mandatory product testing at CDSCO-approved laboratories. Refer to the Testing Laboratories list to identify authorized labs.
- Documentation Preparation: Assemble all required documentation including Device Master File (DMF), Plant Master File (PMF), and risk management files.
- License Application (Form MD7): Submit the manufacturing license application through the CDSCO MD Online Portal.
- Audit: CDSCO inspectors conduct an onsite audit to verify compliance.
- Queries Resolution: Address any queries raised by the CDSCO or inspectors.
- License Grant: Upon successful review, the MD9 license is granted on Form MD9.
For a step-by-step breakdown, our detailed MD9 License Guide offers invaluable insights.
Manufacturing License Documents Required
The documentation package for the MD9 license is extensive. Key documents include:
- Company Constitution/Registration Certificate
- Proof of ownership or lease agreement of manufacturing premises
- Qualification and experience details of technical staff
- Fire NOC and Pollution Control Board NOC
- Device Master File (DMF)—detailing device design, specifications, and manufacturing process (learn more)
- Plant Master File (PMF)—facility layout, equipment details, and quality control (guide here)
- Essential Principles Checklist ensuring compliance with regulatory standards
- Risk Management File outlining risk identification and mitigation strategies (risk management guidance)
- Product Test Reports from CDSCO-approved labs
- Product Labels and Instructions for Use (IFU)
- Quality Management System (QMS) documents such as ISO 13485:2016 certification
Import License Process (MD15)
For importers intending to bring the Haemodialysis conductivity standard solution into India, an MD15 import license from the Central Licensing Authority is mandatory.
The process involves:
- Document Preparation: Collect necessary documents such as manufacturing license from the country of origin, Free Sale Certificate, ISO 13485:2016, CE Certificate, DMF, PMF, and wholesale license.
- Application Submission: File the application on Form MD14 via the CDSCO MD Online Portal.
- Review and Queries: Respond to any departmental queries.
- License Grant: Upon approval, the MD15 license is issued.
For an in-depth understanding, consult our Import License Guide.
Import License Documents Required
Essential documents include:
- Valid manufacturing license from the country of origin
- Free Sale Certificate or equivalent
- ISO 13485:2016 certification
- CE Certificate or equivalent
- Device Master File
- Plant Master File
- Wholesale license
- Company Constitution
Timeline and Processing Duration
- MD9 Manufacturing License: Total of 4 to 5 months
- Test License (MD13): 1.5 to 2 months
- Product Testing: 3 to 4 weeks
- Document Preparation & Submission: 2 to 3 weeks
- Audit and Queries Resolution: 1 to 1.5 months
- MD15 Import License: Approximately 5 to 6 months
Government Fees and Costs
- MD9 Manufacturing License:
- Application fee: Rs. 50,000 per application
- Per product fee: Rs. 1,000
- MD15 Import License Fees:
- Class C & D: Rs. 3,000 per site
- Rs. 1,500 per product
Ensure payments are made as per CDSCO guidelines through the online portal.
Common Challenges and Solutions
Challenge: Delays in product testing due to limited slots in government-approved labs.
- Solution: Early booking and coordination with labs listed on the CDSCO Testing Laboratories page.
Challenge: Non-compliance found during audits, leading to repeated inspections.
- Solution: Conduct thorough internal pre-audit checks and ensure all QMS procedures are implemented.
Challenge: Incomplete documentation causing application rejections.
- Solution: Use checklists aligned with CDSCO requirements, including DMF and PMF, and consult experts to prepare documents.
Expert Consultation and Support
Our seasoned team offers tailored regulatory consulting to streamline your CDSCO licensing journey. From preparing your Device Master File to navigating audits and responding to CDSCO queries, we provide end-to-end support ensuring compliance and timely approvals.
Getting Started with Your CDSCO License Application
- Assess your device classification: Confirm your Haemodialysis conductivity standard solution is correctly classified as Class C.
- Prepare the Test License Application (MD13): Start this early via the CDSCO MD Online Portal.
- Identify testing laboratories: Schedule product testing with approved labs.
- Gather documentation: Focus on Device and Plant Master Files, risk management, and QMS documents.
- Submit manufacturing license application (Form MD7): Ensure all documents are complete to avoid delays.
- Plan for audit: Prepare your facility and staff for the CDSCO audit.
By following these steps and leveraging expert guidance, you can efficiently navigate the complex regulatory pathway for the Haemodialysis conductivity standard solution and successfully enter the Indian market.
For personalized assistance, feel free to contact our team to discuss your specific requirements and timelines.