CDSCO License for Haemodialysis system central monitor
Medical Device Information
Intended Use
Device intended to connect with multiple haemodialysis systems in order to aid monitoring several dialysis treatments simultaneously.

Comprehensive Guide to CDSCO Licensing for Haemodialysis System Central Monitor (Class C Medical Device)
Navigating the Indian regulatory landscape for medical devices can be complex, especially for advanced nephrology equipment like the Haemodialysis System Central Monitor. This device, classified under risk Class C, plays a critical role by connecting multiple haemodialysis systems to enable simultaneous monitoring of dialysis treatments — a vital function in renal care.
With over 25 years of experience and having assisted more than 500 companies in securing CDSCO licenses, we provide a detailed, practical roadmap tailored specifically for your device to ensure smooth market entry in India.
CDSCO Regulatory Framework for Haemodialysis System Central Monitor
The Central Drugs Standard Control Organization (CDSCO) governs medical device regulation in India under the Medical Device Rules (MDR) 2017. Your device falls under Class C due to its moderate to high risk, requiring a manufacturing license from the Central Licensing Authority via the MD9 license process.
This classification reflects the device’s significant impact on patient safety and clinical outcomes, demanding stringent compliance with quality, safety, and performance standards.
Risk Classification and License Requirements
According to the Medical Device Classification guide, Class C devices include those with moderate to high risks, typically involving monitoring and life-support functionalities. The Haemodialysis System Central Monitor fits this category due to its critical monitoring role.
For Class C devices, CDSCO mandates:
- Obtaining a Test License (Form MD13) initially for 1.5 to 2 months
- Product testing at CDSCO-approved laboratories
- Submission of a comprehensive application on Form MD7 for the MD9 Manufacturing License
- Audit and inspection by CDSCO
Manufacturing License Process (MD9) for Class C Devices
The MD9 license is granted by the Central Licensing Authority and is mandatory to legally manufacture your Haemodialysis System Central Monitor in India. The entire process generally takes 4 to 5 months, comprising the following steps:
Test License Application (Form MD13): Apply via the CDSCO MD Online Portal to obtain a test license, allowing you to manufacture prototypes or samples for testing purposes.
Product Testing: Conduct mandatory testing of your device at government-approved laboratories. You can find the list of Testing Laboratories here.
Documentation Preparation: Prepare all necessary documents, including Device Master File, Plant Master File, Risk Management File, Essential Principles Checklist, and Quality Management System (QMS) documents.
Application Submission (Form MD7): Submit your manufacturing license application online.
Audit and Inspection: CDSCO inspectors will audit your manufacturing site and review your documentation.
Resolution of Queries: Address any queries raised by CDSCO or inspectors promptly.
Grant of MD9 License: On successful compliance, CDSCO issues the manufacturing license in Form MD9.
For detailed insights, refer to our MD9 License Guide.
Manufacturing License Documents Required for Haemodialysis System Central Monitor
Accurate and complete documentation is vital. For your Class C device, prepare the following:
- Company Constitution Documents: Registration certificates, Memorandum of Association, Articles of Association.
- Proof of Ownership or Lease of Manufacturing Premises: Rent agreement or ownership proof.
- Technical Staff Credentials: CVs, qualifications, and experience of key personnel.
- Fire NOC and Pollution Control Board NOC: To comply with environmental and safety norms.
- Device Master File (DMF): Detailed device description, design, manufacturing process, and validation. Our Device Master File guide offers a step-by-step approach.
- Plant Master File (PMF): Details of manufacturing facility, equipment, and quality controls. See our Plant Master File Guide for reference.
- Essential Principles Checklist: Demonstrating compliance with Indian MDR essential principles.
- Risk Management File: Addressing hazards, risk analysis, and mitigation strategies. Learn more about implementing risk management.
- Test Reports: From CDSCO-approved labs validating device safety and performance.
- Labels and Instructions for Use (IFU): Compliant with Indian regulatory labeling requirements.
- Quality Management System (QMS) Documents: ISO 13485 certification, SOPs, CAPA, and training records.
Import License Process (MD15) for Haemodialysis System Central Monitor
If you intend to import the Haemodialysis System Central Monitor, an Import License (MD15) from the Central Licensing Authority is mandatory. This process generally takes 5 to 6 months and includes:
- Document preparation including manufacturing license from the country of origin, Free Sale Certificate, ISO 13485:2016, CE Certificate, Device and Plant Master Files, wholesale license, and company constitution.
- Submission of application on Form MD14 via the CDSCO MD Online Portal.
- Resolution of departmental queries.
- Final grant of MD15 license.
Refer to our detailed Import License Guide for stepwise assistance.
Timeline and Processing Duration
Process Step | Duration (Approx.) |
---|---|
Test License (MD13) | 1.5 to 2 months |
Product Testing | 1 to 1.5 months |
Documentation Preparation | Concurrent with testing |
MD9 License Application & Audit | 1.5 to 2 months |
Total Time | 4 to 5 months |
For import licenses, expect around 5 to 6 months.
Government Fees and Costs
License Type | Application Fee (INR) | Per Product Fee (INR) |
---|---|---|
MD9 Manufacturing | 50,000 | 1,000 |
MD15 Import | USD 3,000 per site | USD 1,500 per product |
Additional costs include testing fees, audit charges by notified bodies, and preparation of technical documentation.
Common Challenges and Practical Solutions
Delayed Testing Approvals: Testing labs often have long queues. Early engagement and booking slots can mitigate delays.
Incomplete Documentation: Ensure all files like DMF and PMF are detailed and aligned with CDSCO requirements. Use our guides to avoid common pitfalls.
Audit Non-Compliance: Conduct internal audits before CDSCO inspections to identify gaps in QMS or facility compliance.
Query Resolution Delays: Assign a dedicated regulatory liaison to promptly address CDSCO queries.
Understanding Risk Management: Properly document risk analysis tailored to multi-device monitoring functionality to satisfy compliance.
Expert Consultation and Support
Our team has successfully guided over 500 manufacturers and importers through the CDSCO licensing maze. We provide:
- Customized gap analysis for your device and facility.
- Comprehensive documentation support including DMF, PMF, and Risk Management.
- End-to-end application filing and audit readiness coaching.
- Liaison with CDSCO and notified bodies for expedited processing.
Partnering with experienced consultants reduces turnaround time, avoids costly rejections, and accelerates your product’s market access.
Getting Started with Your CDSCO License Application
Assess Your Device Classification: Confirm risk class C status using Medical Device Classification.
Register on CDSCO MD Online Portal: Create your account to initiate applications.
Prepare Test License Application (MD13): Gather prerequisite documents and submit via the portal.
Engage Accredited Testing Labs: Schedule testing early to align with your application timeline.
Develop Comprehensive Technical Documentation: Leverage our Device and Plant Master File guides to ensure compliance.
Plan for Audit: Pre-audit your manufacturing site to ensure readiness.
Submit MD9 Application (Form MD7): After successful testing and documentation, apply for manufacturing license.
Monitor and Respond: Track application status on the portal and address queries promptly.
Embarking on this journey with a clear plan and expert guidance ensures your Haemodialysis System Central Monitor reaches Indian patients efficiently and compliantly. For personalized assistance, contact us to leverage our 25+ years of CDSCO regulatory expertise.