Logo
Chat on WhatsApp

CDSCO License for Medical gas flowmeter

Medical Device Information

Important Notice for Class A Devices

Class A Non-sterile Non Measuring devices are exempt from MD5 and MD15 licenses. Only CDSCO registration is required as per GSR 777(E).

Device Class
Class A

Intended Use

A device intended to measure and regulate the flow of a  medical gas during various procedures.

Manufacturing License
MD5
Import License
MD15
CDSCO License for Medical gas flowmeter

Introduction to Medical Gas Flowmeter and Its Regulatory Importance

Medical gas flowmeters are critical devices in anesthesiology, designed to measure and regulate the flow of medical gases during various clinical procedures. Given their direct impact on patient safety and clinical outcomes, these devices are strictly regulated by the Central Drugs Standard Control Organization (CDSCO) in India. Compliance with CDSCO regulations ensures that manufacturers and importers meet stringent safety, quality, and performance standards before marketing these devices in the Indian healthcare ecosystem.

At our consultancy, with over 25 years of experience and having supported 500+ companies, we understand the nuances involved in navigating the CDSCO licensing process specifically for Class A devices like medical gas flowmeters. Our insights will help you streamline your application, avoid common pitfalls, and achieve timely approval.

CDSCO Regulatory Framework for Medical Gas Flowmeters

Medical gas flowmeters fall under the anesthesiology category and are classified as Class A devices, which are considered low-risk by CDSCO. The regulatory framework stipulates that Class A devices require a manufacturing license known as the MD5 license, issued by the respective State Licensing Authority. This is governed by the Medical Device Rules, 2017, with notifications such as 29/Misc/03/2020-DC(177) dated 12.07.2021 specifically covering devices like medical gas flowmeters.

Compliance with these regulations ensures not only legal clearance but also reinforces trust with healthcare providers and end-users by affirming the device’s safety and efficacy.

Risk Classification and License Requirements for Medical Gas Flowmeters

As a Class A medical device, the medical gas flowmeter requires an MD5 manufacturing license. This classification simplifies the regulatory pathway compared to higher-risk classes (C or D) but mandates strict adherence to quality management systems and device-specific documentation.

Key license requirements include:

  • Obtaining a Test License (Form MD13) before full manufacturing licensing
  • Product testing by CDSCO-approved laboratories
  • Documentation of quality systems and technical files
  • Audit by a notified body listed on the CDSCO Notified Bodies List

Manufacturing License Process (MD5) for Medical Gas Flowmeters

The MD5 license process for manufacturing medical gas flowmeters is a multi-step journey that typically takes 3 to 4 months. Here’s a stepwise breakdown:

  1. Test License (Form MD13) Application: Submit an application for a test license to legally manufacture and test the device prototype. This phase usually takes 1.5 to 2 months.

  2. Product Testing: Conduct product testing at a CDSCO-approved laboratory. For your convenience, refer to the Testing Laboratories list to choose an accredited lab.

  3. Documentation Preparation: Assemble the required documentation including Device Master File, Plant Master File, Risk Management File, Essential Principles Checklist, and Quality Management System documents.

  4. MD5 License Application (Form MD3): Submit the manufacturing license application along with all supporting documents through the CDSCO MD Online Portal.

  5. Audit by Notified Body: A notified body will conduct an on-site audit of your manufacturing facility and quality systems.

  6. Query Resolution: Address any queries raised by the licensing authority or notified body promptly.

  7. Grant of MD5 License (Form MD5): Upon successful review and audit, the license is granted.

For an in-depth walkthrough, our MD5 License Guide provides practical tips and templates.

Manufacturing License Documents Required for Medical Gas Flowmeters

The documentation package for MD5 licensing is comprehensive and must be meticulously prepared to avoid delays:

  • Company Constitution (e.g., Memorandum and Articles of Association)
  • Proof of ownership or lease of the manufacturing premises
  • Qualification and experience certificates of technical staff
  • Fire and Pollution NOCs
  • Device Master File (DMF): Detailed technical specifications, design drawings, manufacturing processes. Our Device Master File Guide covers this extensively.
  • Plant Master File (PMF): Details of your manufacturing facility and quality controls. See our Plant Master File Guide.
  • Essential Principles Checklist demonstrating compliance with safety and performance standards
  • Risk Management File aligned with ISO 14971 principles
  • Product Test Reports from CDSCO-approved labs
  • Product labels and Instructions for Use (IFU)
  • Quality Management System (QMS) documents, preferably ISO 13485 certified

Import License Process (MD15) for Medical Gas Flowmeters

If you are an importer rather than a manufacturer, the MD15 import license is mandatory. The process is centralized and involves:

  • Preparing detailed documentation including manufacturing license from the country of origin, Free Sale Certificate, ISO 13485, CE certificate, Device and Plant Master Files
  • Submitting application on Form MD14 via the CDSCO MD Online Portal
  • Addressing any queries from CDSCO
  • Awaiting license grant on Form MD15

The typical timeline is 5 to 6 months, with government fees based on device class and product count. For a tailored overview, consult our Import License Guide.

Import License Documents Required

  • Valid Manufacturing License of the foreign manufacturer
  • Free Sale Certificate from the country of origin
  • ISO 13485:2016 Certification
  • CE Certificate or equivalent
  • Device Master File
  • Plant Master File
  • Wholesale License (if applicable)
  • Company Constitution

Timeline and Processing Duration

Process StepDuration
Test License (MD13)1.5 to 2 months
Product Testing2 to 4 weeks
Document Preparation2 to 3 weeks
MD5 Application Processing1 to 1.5 months
Audit and Query Resolution3 to 4 weeks
Total Estimated Duration3 to 4 months

Proactive document preparation and prompt response to queries can significantly reduce these timelines.

Government Fees and Costs

  • Test License (Form MD13): Approximately Rs. 2000
  • MD5 Manufacturing License Application Fee: Rs. 5000 per application
  • Additional Fee: Rs. 500 per product (medical gas flowmeter in this case)

Budgeting for notified body audits and laboratory testing fees (varies by provider) is also necessary.

Common Challenges and Solutions

Challenge: Delays due to incomplete documentation or non-standardized Device Master Files.

Solution: Utilize our detailed guides and templates to prepare your DMF and PMF meticulously before submission.

Challenge: Selection of inappropriate notified bodies leading to audit rescheduling.

Solution: Refer to the official Notified Bodies List to engage a CDSCO-approved auditor.

Challenge: Prolonged product testing timelines.

Solution: Choose laboratories from the official Testing Laboratories List with proven track records and expedite sample submission.

Expert Consultation and Support

Navigating CDSCO licensing can be complex. Our extensive experience in medical device regulatory affairs means we can provide end-to-end support—from documentation and testing coordination to audit readiness and application submission. With over 500 successful client licenses, we ensure a smooth, compliant, and timely approval process.

Getting Started with Your CDSCO License Application for Medical Gas Flowmeters

  1. Assess your device classification: Confirm the Class A status and applicable notifications.
  2. Initiate Test License (MD13) application: Prepare your initial documents and submit via the CDSCO MD Online Portal.
  3. Plan for product testing: Select an accredited lab early to avoid bottlenecks.
  4. Compile comprehensive documentation: Use our Device and Plant Master File guides as references.
  5. Engage with a notified body: Schedule your audit in advance to align with your application timeline.
  6. Prepare for query responses: Assign a dedicated regulatory contact to handle departmental communications promptly.

By following these actionable steps and leveraging our expertise, you can confidently navigate the CDSCO licensing process for your medical gas flowmeter and bring your device to the Indian market efficiently and compliantly.

Get Expert Help

Free consultation for your medical device license

24/7 Support Available

Why Choose Us

500+ Licenses Obtained
100% Success Rate
15+ Years Experience
24/7 Support Available

About the Author

avatar
Tails Azimuth
@Twitter