Logo
Chat on WhatsApp

CDSCO License for Medical gas pipeline system automatic outlet  analyser

Medical Device Information

Important Notice for Class A Devices

Class A Non-sterile Non Measuring devices are exempt from MD5 and MD15 licenses. Only CDSCO registration is required as per GSR 777(E).

Device Class
Class A

Intended Use

A mains component of a medical gas pipeline supply system that monitors the composition of a gas delivered  from the supply system.

Manufacturing License
MD5
Import License
MD15
CDSCO License for Medical gas pipeline system automatic outlet  analyser

Comprehensive Guide to CDSCO Licensing for Medical Gas Pipeline System Automatic Outlet Analyser

As a crucial component in anesthesiology, the Medical Gas Pipeline System Automatic Outlet Analyser plays a vital role in monitoring the composition of medical gases delivered from the supply system. Classified as a Class A medical device under the CDSCO framework, it requires adherence to specific regulatory pathways to ensure compliance and market access in India. With over 25 years of experience assisting 500+ companies in obtaining CDSCO licenses, we provide you with detailed, practical guidance tailored for this device type.


CDSCO Regulatory Framework for Medical Gas Pipeline System Automatic Outlet Analyser

The Central Drugs Standard Control Organization (CDSCO) governs medical devices in India, ensuring safety, quality, and efficacy. The Medical Gas Pipeline System Automatic Outlet Analyser falls under the anesthesiology category and is notified by CDSCO under notification number 29/Misc/03/2020-DC(177) dated 12.07.2021. This device, being Class A (low risk), must comply with the regulatory framework applicable to low-risk devices.

India’s regulatory framework mandates obtaining a Manufacturing License (MD5) issued by the State Licensing Authority for Class A devices. This ensures your product meets essential safety and performance standards before entering the market.

For detailed device classification, you can refer to our comprehensive Medical Device Classification guide.

Risk Classification and License Requirements for Class A Devices

  • Risk Class: Class A (Low Risk)
  • License Type: MD5 Manufacturing License
  • Regulatory Authority: State Licensing Authority
  • Total Processing Time: Approximately 3-4 months

Class A devices like your medical gas analyser require a stepwise process including obtaining a test license, product testing from government-approved labs, audit by notified bodies, and final license grant.

Manufacturing License Process (MD5) for Medical Gas Pipeline System Automatic Outlet Analyser

The MD5 license process includes the following key steps:

  1. Test License (Form MD13): Apply for a test license allowing manufacturing and sample testing. This typically takes 1.5 to 2 months.

  2. Product Testing: Samples must be tested in government-approved testing laboratories to verify compliance with applicable standards. You can find a list of CDSCO-approved testing laboratories here.

  3. Document Preparation: Compile all necessary documents, including technical files and quality management system documents.

  4. Application for MD5 License (Form MD3): Submit your manufacturing license application through the CDSCO MD Online Portal.

  5. Audit by Notified Body: A notified body will conduct an audit of your manufacturing facility and documentation. Refer to the list of notified bodies for identification.

  6. Query Resolution: Address any observations or queries raised by the authorities or notified bodies promptly.

  7. Grant of MD5 License (Form MD5): Upon successful audit and compliance, the license is granted.

For an in-depth walkthrough, our MD5 License Guide offers an excellent resource.

Manufacturing License Documents Required for Medical Gas Pipeline System Automatic Outlet Analyser

Ensure you have the following documentation ready for submission:

  • Company Constitution (e.g., Memorandum & Articles of Association)
  • Proof of Ownership or Lease of Manufacturing Premises
  • Technical Staff Qualifications and Experience
  • Fire No Objection Certificate (NOC)
  • Pollution Control Board NOC
  • Device Master File (DMF) detailing design, components, and manufacturing processes. See our Device Master File guide for help.
  • Plant Master File (PMF) describing your manufacturing facility and quality systems. Learn more from our Plant Master File guide.
  • Essential Principles Checklist confirming compliance with Indian regulatory requirements
  • Risk Management File demonstrating risk assessment and mitigation strategies. We recommend following the best practices outlined in our Risk Management guide.
  • Test Reports from government-approved laboratories
  • Product Labels and Instructions for Use (IFU)
  • Quality Management System Documents (e.g., ISO 13485:2016 compliance evidence)

Import License Process (MD15) – When Importing Components or Finished Devices

If you are importing the Medical Gas Pipeline System Automatic Outlet Analyser or components, an Import License (MD15) from the Central Licensing Authority is mandatory.

Key steps include:

  • Document preparation including manufacturing license from the country of origin, Free Sale Certificate, ISO 13485:2016 certification, CE Certificate (if applicable), Device and Plant Master Files, wholesale license, and company constitution.

  • Submit application via the CDSCO MD Online Portal.

  • Respond to any authority queries.

  • Grant of MD15 License.

The process typically takes 5-6 months. For detailed guidance, see our Import License Guide.

Import License Documents Required

  • Valid Manufacturing License from the country of origin
  • Free Sale Certificate
  • ISO 13485:2016 Certificate
  • CE Certificate or equivalent
  • Device Master File and Plant Master File
  • Wholesale License (if applicable)
  • Company Constitution documents

Timeline and Processing Duration

StepDuration
Test License (MD13)1.5 – 2 months
Product Testing3 – 4 weeks
Document Preparation2 – 3 weeks
Application Submission (MD3)Immediate via online portal
Notified Body Audit3 – 4 weeks
Query Resolution2 – 3 weeks
Grant of MD5 LicenseTotal 3 – 4 months overall

Proactive preparation and prompt response to audits and queries help avoid delays.

Government Fees and Costs

For Class A devices like the medical gas analyser, fees are:

  • Application Fee: Rs. 5,000 per application
  • Fee per Product: Rs. 500

These fees are payable during application submission via the CDSCO MD Online Portal.

Common Challenges and Solutions

Challenge 1: Delays in Product Testing

  • Solution: Engage early with government-approved testing laboratories and submit samples promptly.

Challenge 2: Incomplete Documentation

  • Solution: Use detailed checklists and consult expert regulatory professionals to ensure all documentation meets CDSCO requirements.

Challenge 3: Audit Non-compliance

  • Solution: Prepare your facility and quality systems per notified body guidelines. Conduct internal audits before the official inspection.

Challenge 4: Query Resolution Delays

  • Solution: Assign a dedicated regulatory liaison to respond to CDSCO or notified body queries quickly and precisely.

Expert Consultation and Support

With our extensive experience guiding over 500 companies through CDSCO licensing, we offer:

  • Customized regulatory strategy for your specific device
  • Assistance with document preparation including Device and Plant Master Files
  • Support in test license application and product testing coordination
  • Audit readiness consulting and mock inspections
  • Efficient query management to expedite approvals

Our proactive approach minimizes risks and accelerates market entry.

Getting Started with Your CDSCO License Application

  1. Assess Device Classification: Confirm Class A status and regulatory pathway.

  2. Prepare Technical and Quality Documentation: Compile Device Master File, Plant Master File, Risk Management File, and QMS documentation.

  3. Apply for Test License (MD13): Submit application through the CDSCO MD Online Portal to start manufacturing for sample testing.

  4. Coordinate Product Testing: Send samples to an approved laboratory promptly.

  5. Plan for Audit: Engage a notified body early and schedule audits.

  6. Submit Manufacturing License Application (MD3): Once testing and documentation are ready.

  7. Respond to Queries and Obtain MD5 License: Follow up diligently until license grant.

By following these actionable steps and leveraging our expert guidance, manufacturers and importers can ensure a smooth and timely CDSCO licensing process for the Medical Gas Pipeline System Automatic Outlet Analyser. This not only ensures compliance but also fosters trust and safety in the Indian healthcare ecosystem.

For further assistance and bespoke consulting, feel free to reach out to our regulatory experts.

Get Expert Help

Free consultation for your medical device license

24/7 Support Available

Why Choose Us

500+ Licenses Obtained
100% Success Rate
15+ Years Experience
24/7 Support Available

About the Author

avatar
Tails Azimuth
@Twitter