CDSCO License for Medical gas pipeline system
Medical Device Information
Important Notice for Class A Devices
Class A Non-sterile Non Measuring devices are exempt from MD5 and MD15 licenses. Only CDSCO registration is required as per GSR 777(E).
Intended Use
An assembly of devices designed to supply compressed medical gases from a central source to endpoints throughout a medical facility.

Introduction: Medical Gas Pipeline Systems and Their Regulatory Importance
Medical gas pipeline systems are critical infrastructure components in healthcare facilities, designed to safely and reliably deliver compressed medical gases from a central source to various endpoints such as operating rooms and ICUs. Given their vital role in patient safety and treatment efficacy, these systems are categorized under anesthesiology devices and fall within Class A (low risk) under the Indian medical device regulatory framework.
At our consultancy, with over 25 years of experience and having supported 500+ manufacturers, we understand the nuances involved in obtaining the CDSCO license for such specialized devices. Navigating the regulatory landscape efficiently ensures timely market access and compliance with India's Medical Device Rules notified as per Notification 29/Misc/03/2020-DC(177) dated 12.07.2021.
CDSCO Regulatory Framework for Medical Gas Pipeline Systems
The Central Drugs Standard Control Organization (CDSCO) regulates medical devices in India under the Medical Device Rules (MDR) 2017. Medical gas pipeline systems fall under Class A devices due to their low risk classification but require strict adherence to quality and safety standards given their clinical importance.
Under these rules, manufacturers must obtain a manufacturing license (MD5) via the State Licensing Authority before production. Importers require an import license (MD15) from the Central Licensing Authority. Both processes are conducted through the CDSCO MD Online Portal.
Risk Classification and License Requirements for Medical Gas Pipeline Systems
Class A devices, including medical gas pipeline systems, are categorized as low risk but still require a thorough regulatory process. For manufacturing, an MD5 license is mandatory, which involves compliance with quality management systems, testing, and an audit by a notified body.
The MD5 license process involves:
- Application Form MD3
- Test license on Form MD13
- Product testing from government-approved labs
- Audit by notified bodies listed here
For importers, the MD15 license is required, which is granted by the Central Licensing Authority.
Manufacturing License Process (MD5) for Medical Gas Pipeline Systems
The manufacturing license for Class A devices like medical gas pipeline systems is granted by the State Licensing Authority. The process generally takes 3-4 months and includes several key steps:
- Test License Application (Form MD13): This initial step takes approximately 1.5 to 2 months. It allows manufacturers to test their products.
- Product Testing: Testing must be conducted at CDSCO-recognized testing laboratories. You can review the list of approved labs here.
- Document Preparation: Compile all required dossiers, including Device Master File, Plant Master File, and Risk Management documents.
- Application Submission (Form MD3): Submit the manufacturing license application via the CDSCO MD Online Portal.
- Audit by Notified Body: A notified body audit is mandatory to verify compliance. Choose your auditor from the notified bodies list.
- Resolution of Queries: Address any queries raised by the authorities or auditors promptly.
- License Grant (Form MD5): Upon satisfactory review, the license is granted.
Manufacturing License Documents Required
For medical gas pipeline systems, the document requirements are stringent to ensure safety and quality:
- Company Constitution and Incorporation Certificate
- Proof of Ownership or Lease of Manufacturing Premises
- Technical Staff Qualification and Experience Details
- No Objection Certificates (NOC) for Fire and Pollution Control
- Detailed Device Master File (we recommend our comprehensive Device Master File guide)
- Plant Master File outlining manufacturing processes and facilities (Plant Master File Guide)
- Essential Principles Checklist demonstrating compliance with safety and performance criteria
- Risk Management File, reflecting hazard analysis and mitigation strategies (Risk Management Guide)
- Product Test Reports from CDSCO-approved labs
- Labels and Instructions for Use (IFU)
- Quality Management System (QMS) documentation, ideally ISO 13485 certified
Import License Process (MD15) for Medical Gas Pipeline Systems
For manufacturers or distributors intending to import medical gas pipeline systems into India, the MD15 import license is mandatory. This process is administered by the Central Licensing Authority and usually takes 5-6 months.
The key steps include:
- Document Compilation: Gather all required documents including manufacturing license from the country of origin, free sale certificate, ISO 13485 certification, CE certificate (if applicable), and master files.
- Application Submission: File the application on the CDSCO MD Online Portal using Form MD14.
- Clarifications and Query Resolution: Respond promptly to any departmental queries.
- License Issuance (Form MD15): Upon approval, import license is granted.
Import License Documents Required
- Valid Manufacturing License from the country of origin
- Free Sale Certificate confirming legal marketing in the country of origin
- ISO 13485:2016 Certification
- CE Certificate (if marketed in the EU)
- Device Master File
- Plant Master File
- Wholesale License
- Company Constitution
Timeline and Processing Duration
License Type | Process Steps | Approximate Duration |
---|---|---|
MD5 Manufacturing | Test license, testing, application, audit, license grant | 3-4 months total |
MD15 Import | Document prep, application, queries, license grant | 5-6 months total |
Manufacturers should plan accordingly, as initial testing and audits often require the longest lead times.
Government Fees and Costs
MD5 License (Manufacturing Class A):
- Rs 5000 per application
- Rs 500 per product
MD15 License (Import Class A):
- USD 1000 per site
- USD 50 per product
Additional costs include testing fees at government-approved labs and audit fees charged by notified bodies.
Common Challenges and Solutions
Challenge: Delays in Testing and Audit Scheduling Solution: Engage with notified bodies and testing labs early. Secure audit slots in advance and ensure that all documents are complete and accurate to avoid back-and-forth.
Challenge: Incomplete Documentation Leading to Queries Solution: Utilize checklists and expert review services to ensure all master files, technical documents, and QMS records meet CDSCO standards.
Challenge: Understanding Regulatory Updates and Notifications Solution: Stay updated with official notifications, such as Notification 29/Misc/03/2020-DC(177) dated 12.07.2021, and consult with regulatory experts to interpret their impact.
Expert Consultation and Support
With our extensive experience assisting over 500 companies, we provide end-to-end support from initial regulatory strategy to final license grant. Our services include document preparation, audit readiness, liaison with CDSCO and notified bodies, and post-license compliance.
We recommend leveraging professional consultation to avoid common pitfalls and accelerate your market entry.
Getting Started with Your CDSCO License Application
- Determine your device classification: Confirm your device is Class A as per the Medical Device Classification guide.
- Prepare your Device and Plant Master Files: Use detailed templates and guidelines to compile these essential documents.
- Apply for Test License (Form MD13): Initiate product testing at CDSCO-approved labs.
- Schedule your notified body audit: Choose from the official notified bodies list early to secure your audit date.
- Submit your manufacturing license application (Form MD3) through the CDSCO MD Online Portal.
- Monitor application status and respond quickly to queries: Proactive communication expedites approvals.
By following these steps and leveraging expert guidance, manufacturers of medical gas pipeline systems can successfully obtain their CDSCO licenses and confidently enter the Indian healthcare market.
For detailed assistance, reach out to our team to tailor your regulatory pathway and ensure compliance every step of the way.