Logo
Chat on WhatsApp

CDSCO License for Patient physiologic monitoring system

Medical Device Information

Device Class
Class C

Intended Use

An assembly of devices designed for continuous  assessment of several vital physiologic parameters of patient(s).

Manufacturing License
MD9
Import License
MD15
CDSCO License for Patient physiologic monitoring system

Comprehensive Guide to CDSCO Licensing for Patient Physiologic Monitoring Systems (Class C)

Patient physiologic monitoring systems are critical medical devices used extensively in anesthesiology for continuous assessment of vital parameters such as ECG, blood pressure, oxygen saturation, and respiratory rate. Given their significance in clinical decision-making, the Central Drugs Standard Control Organization (CDSCO) regulates these devices meticulously under India's medical device regulatory framework. With over 25 years of experience assisting 500+ companies in securing CDSCO licenses, we provide you with a step-by-step, practical guide tailored for Patient Physiologic Monitoring Systems, classified as Class C devices under Notification 29/Misc/03/2020-DC(177), dated 12.07.2021.


CDSCO Regulatory Framework for Patient Physiologic Monitoring Systems

The CDSCO governs medical devices through a risk-based classification system aligned with the Medical Device Rules (MDR) 2017, amended periodically. Patient physiologic monitoring systems fall under Class C, requiring stringent regulatory compliance due to their medium-high risk nature. Compliance includes obtaining manufacturing (MD9) and/or import (MD15) licenses from the CDSCO central licensing authority.

Manufacturers and importers must adhere to these frameworks to legally market and distribute these devices in India. The process ensures product safety, effectiveness, and quality through rigorous documentation, testing, and audits.

Risk Classification and Licensing Requirements

  • Device: Patient Physiologic Monitoring System
  • Risk Class: C (Medium-High Risk)
  • Category: Anesthesiology
  • CDSCO Notification: 29/Misc/03/2020-DC(177) dated 12.07.2021

Class C devices require:

  • Manufacturing License (MD9): Issued by CDSCO Central Licensing Authority
  • Import License (MD15): Required for importers to legally bring devices into India

Refer to the Medical Device Classification guide for detailed understanding.

Manufacturing License Process (MD9) for Class C Devices

Obtaining an MD9 manufacturing license for Patient Physiologic Monitoring Systems involves multiple phases:

1. Test License (Form MD13)

  • Purpose: Allows initial manufacturing for testing and validation
  • Duration: Approximately 1.5 to 2 months
  • Actions: Manufacture sample devices to be sent for testing at CDSCO-approved laboratories

2. Product Testing

  • Conduct testing at CDSCO-recognized labs for compliance with applicable Indian standards
  • Testing parameters include electrical safety, electromagnetic compatibility, biocompatibility, and performance validation
  • Access the list of Testing Laboratories for selection

3. Document Preparation

Prepare comprehensive documentation including:

  • Company Constitution and incorporation certificates
  • Proof of premises ownership or lease
  • Details of qualified technical staff
  • Fire and Pollution NOCs
  • Device Master File (DMF) covering design, manufacturing process, and quality controls (see our Device Master File Guide)
  • Plant Master File (PMF) outlining facility details (Plant Master File Guide)
  • Essential Principles Checklist demonstrating compliance with Indian MDR
  • Risk Management File per ISO 14971 (Risk Management Guide)
  • Test Reports from accredited labs
  • Product labels and Instructions for Use (IFU)
  • Quality Management System (QMS) documents, preferably ISO 13485 certified

4. Application Submission (Form MD7)

  • Submit your manufacturing license application via the CDSCO MD Online Portal
  • Attach all required documents and test reports

5. On-site Audit

  • CDSCO inspectors conduct a thorough audit of manufacturing facilities and QMS
  • Ensure readiness by maintaining compliance with GMP and ISO standards
  • The audit is critical; non-conformities may lead to delays

6. Query Resolution

  • Respond promptly and comprehensively to any queries raised by the CDSCO or auditors

7. License Grant (Form MD9)

  • Upon satisfactory review and audit, the MD9 manufacturing license is granted

Manufacturing License Documents Required

Document TypeDetails
Company ConstitutionIncorporation certificate, Memorandum & Articles of Association
Premises ProofOwnership/lease deed, site plan
Technical Staff DocumentsQualification certificates, experience records
Fire & Pollution NOCsNo Objection Certificates from relevant authorities
Device Master File (DMF)Design specs, manufacturing process, validation data
Plant Master File (PMF)Facility layout, equipment details, utilities
Essential Principles ChecklistCompliance matrix with Indian MDR
Risk Management FileRisk analysis, mitigation strategies per ISO 14971
Test ReportsFrom CDSCO-recognized labs for safety and performance
Labels & IFUProduct labeling, user manuals compliant with MDR
QMS DocumentsISO 13485 certificates, SOPs, CAPA records

Import License Process (MD15) for Class C Devices

For importers of Patient Physiologic Monitoring Systems:

Key Steps:

  1. Document Preparation:
  • Valid Manufacturing License (MD9) from the country of origin
  • Free Sale Certificate from the exporting country
  • ISO 13485:2016 certification
  • CE Certificate or equivalent regulatory approval
  • Device Master File and Plant Master File
  • Wholesale license in India
  • Company Constitution
  1. Application Submission:
  1. Review & Query Resolution:
  • Address any departmental queries promptly
  1. License Grant:
  • CDSCO issues MD15 Import License

Import License Documents Required

Document TypeNotes
Manufacturing LicenseValid foreign manufacturing license
Free Sale CertificateIssued by regulatory authority of exporting country
ISO 13485:2016Quality management certification
CE CertificateEuropean conformity certificate or equivalent
Device & Plant Master FilesAs per Indian MDR requirements
Wholesale LicenseIndian wholesale drug license
Company ConstitutionIncorporation documents

Timeline and Processing Duration

License TypeExpected DurationKey Milestones
MD9 Manufacturing4–5 months totalTest license (1.5–2 months), testing, audit, license approval
MD15 Import5–6 monthsDocument review, queries, license grant

Proactive preparation and early submission of accurate documents can significantly reduce processing times.

Government Fees and Costs

License TypeFee StructureApproximate Cost (INR)
MD9 ManufacturingRs 50,000 per application + Rs 1,000 per productRs 50,000 + Rs 1,000/product
MD15 ImportClass C/D: 3,000persite+3,000 per site + 1,500 per productApprox. Rs 2.5 lakh + Rs 1.25 lakh/product (conversion rates apply)

Fees are payable online during application submission via the CDSCO portal.

Common Challenges and Solutions

Challenge 1: Delays in Test Reports

Solution: Engage with CDSCO-approved testing laboratories early; confirm testing scope and timelines upfront. Use labs listed on the CDSCO Testing Laboratories List.

Challenge 2: Incomplete Documentation

Solution: Use comprehensive checklists and templates for DMF and PMF. Our Device Master File Guide and Plant Master File Guide can streamline preparation.

Challenge 3: Audit Non-Conformities

Solution: Conduct internal audits and mock inspections before CDSCO visits; ensure staff training and QMS readiness.

Challenge 4: Regulatory Updates

Solution: Subscribe to CDSCO notifications and consult experts periodically to stay compliant with evolving rules.

Expert Consultation and Support

With over 25 years in the regulatory domain and having assisted 500+ clients, we provide:

  • End-to-end licensing support from document preparation to audit facilitation
  • Customized regulatory strategy for Class C devices
  • Training on MDR compliance and QMS implementation
  • Post-license vigilance and renewal assistance

Partnering with experienced consultants reduces risks of delays and non-compliance, accelerating your market entry.

Getting Started with Your CDSCO License Application

  1. Assess your product classification: Confirm your device is Class C under current CDSCO notifications.
  2. Prepare initial documents: Gather company incorporation, premises proof, and technical staff details.
  3. Apply for Test License (MD13): Initiate manufacturing of samples and arrange testing at CDSCO-recognized labs.
  4. Develop Device and Plant Master Files: Utilize expert guides to ensure completeness.
  5. Submit manufacturing license application (Form MD7) via the CDSCO MD Online Portal.
  6. Prepare for audit: Conduct internal audits and ensure GMP compliance.
  7. For importers, collate foreign manufacturing licenses, Free Sale Certificates, and ISO/CE certifications before applying for import license (Form MD14).

Starting early and maintaining close coordination with CDSCO and notified bodies expedites approval. Our team is ready to assist you at every stage to ensure your Patient Physiologic Monitoring System successfully enters the Indian market.

For detailed personalized assistance, please contact us to leverage our proven regulatory expertise.

Get Expert Help

Free consultation for your medical device license

24/7 Support Available

Why Choose Us

500+ Licenses Obtained
100% Success Rate
15+ Years Experience
24/7 Support Available

About the Author

avatar
Tails Azimuth
@Twitter