CDSCO License for Radiologic patient cradle
Medical Device Information
Important Notice for Class A Devices
Class A Non-sterile Non Measuring devices are exempt from MD5 and MD15 licenses. Only CDSCO registration is required as per GSR 777(E).
Intended Use
A radiologic patient cradle is a support device intended to be used for rotational positioning about the longitudinal axis of a patient during radiologic procedures.

Comprehensive Guide to CDSCO Licensing for Radiologic Patient Cradle (Class A Medical Device)
At our consultancy, with over 25 years of experience and having supported 500+ companies, we understand the nuances of securing CDSCO licenses for medical devices like the Radiologic Patient Cradle. This device, classified as Class A under CDSCO regulations, plays a vital role in interventional radiology by supporting patients for rotational positioning during radiologic procedures. Navigating India’s regulatory landscape efficiently can be a challenge, but with the right guidance, manufacturers and importers can bring this critical device to market smoothly.
Understanding the CDSCO Regulatory Framework for Radiologic Patient Cradle
The Central Drugs Standard Control Organization (CDSCO) regulates all medical devices in India under the Medical Device Rules, 2017. The Radiologic Patient Cradle falls under Class A—low risk—under the interventional radiology category, as notified in the gazette notification [29/Misc./03/2020-DC (146)] dated 26.07.2021.
The classification determines the licensing pathway and the authority involved. For Class A devices, the State Licensing Authority grants the manufacturing license (MD5), while import licenses are governed centrally.
Risk Classification and License Requirements for Radiologic Patient Cradle
- Risk Class: A (Low Risk)
- License Type: MD5 Manufacturing License (Form MD3)
- Authority: State Licensing Authority
- Additional Licenses: Test License (Form MD13) prior to manufacturing license application
This classification simplifies the process compared to higher-risk devices but still requires rigorous documentation and adherence to quality management.
Step-by-Step Manufacturing License Process (MD5) for Radiologic Patient Cradle
- Obtain Test License (Form MD13):
- Duration: Approximately 1.5 to 2 months
- Purpose: Allows limited manufacturing to facilitate product testing in government-approved labs
- Product Testing:
- Conduct mandatory tests at CDSCO-approved laboratories (Testing Laboratories List)
- Typical tests involve safety, efficacy, and biocompatibility relevant to radiologic patient support devices
- Document Preparation:
- Prepare comprehensive documentation including Device Master File, Plant Master File, Essential Principles Checklist, Risk Management File, test reports, labeling, Instructions For Use (IFU), and Quality Management System (QMS) documents
- Application Submission:
- Submit the MD5 license application using Form MD3 via the CDSCO MD Online Portal
- Audit by Notified Body:
- Engage a notified body from the Notified Bodies List for the mandatory factory audit
- Address Queries:
- Respond promptly to any queries raised by CDSCO or the notified body to avoid delays
- Grant of MD5 License:
- Upon successful audit and document verification, the license is granted in Form MD5
Essential Documents Required for MD5 License Application
- Company Constitution (e.g., Memorandum of Association)
- Proof of ownership or lease agreement for manufacturing premises
- Qualification and experience details of technical staff
- Fire NOC and Pollution Control Board NOC
- Device Master File (DMF) detailing design, specifications, and manufacturing processes (Device Master File Guide)
- Plant Master File (PMF) describing facility layout, equipment, and quality systems (Plant Master File Guide)
- Essential Principles Compliance Checklist
- Risk Management File following ISO 14971 principles (Risk Management Guidance)
- Test Reports from CDSCO-approved labs
- Product labels and Instructions For Use (IFU)
- Quality Management System documents (e.g., ISO 13485:2016 certification)
Import License Process (MD15) Overview
While the Radiologic Patient Cradle is a Class A device primarily requiring a manufacturing license (MD5) for domestic production, importers must secure an MD15 license:
- Authority: Central Licensing Authority
- Application Form: MD14
- Timeline: Approximately 5-6 months
- Documents: Manufacturing license of the foreign manufacturer, Free Sale Certificate, ISO 13485:2016, CE Certificate (if applicable), Device and Plant Master Files, Wholesale License, and Company Constitution
- Fees: Class A import fees are USD 1000 per site and USD 50 per product
Application is submitted online via the CDSCO MD Online Portal.
Timeline and Processing Duration for Radiologic Patient Cradle Licensing
Process Step | Duration |
---|---|
Test License (MD13) | 1.5 to 2 months |
Product Testing | 2 to 3 weeks |
Document Preparation | 3 to 4 weeks |
MD5 Application & Audit | 1 to 1.5 months |
Query Resolution | 2 to 4 weeks |
Total Time | 3 to 4 months approx |
Adhering to timelines requires meticulous preparation, especially in document compilation and audit readiness.
Government Fees and Cost Breakdown
- Test License (MD13): Included within MD5 application process
- MD5 Manufacturing License Fees:
- Application Fee: INR 5,000
- Per Product Fee: INR 500 (for the Radiologic Patient Cradle, this applies once)
- Audit and Testing Costs:
- Notified body audit fees vary (typically INR 50,000 to INR 1,00,000), depending on scope
- Testing fees depend on tests required; budgeting approximately INR 50,000 is prudent
Transparent budgeting upfront avoids surprises during the approval cycle.
Common Challenges and Practical Solutions
- Incomplete Documentation: Many applicants face delays due to missing or inconsistent documents. Solution: Use detailed checklists and consult experts to ensure completeness.
- Delayed Product Testing: Testing at government labs can be backlogged. Solution: Schedule tests early and consider multiple approved labs.
- Audit Non-Compliance: Facility or QMS gaps lead to audit failures. Solution: Conduct internal mock audits and remediate issues beforehand.
- Query Management: Slow responses to CDSCO queries extend timelines. Solution: Assign a dedicated regulatory liaison to handle communications swiftly.
Our hands-on experience allows us to anticipate these pain points and guide clients through each hurdle effectively.
Expert Consultation and Support for Radiologic Patient Cradle Licensing
With over two decades helping medical device manufacturers and importers, we offer tailored consulting services including:
- Pre-application gap analysis
- Document preparation and review
- Coordination with notified bodies and testing labs
- Audit preparation and QMS implementation
- Regulatory strategy customized to your device and business model
Partnering with an expert consultant can reduce approval time by 30-40% and increase first-time approval rates significantly.
Getting Started with Your CDSCO License Application for Radiologic Patient Cradle
- Assess Current Compliance: Begin with a thorough review of your manufacturing site, technical staff qualifications, and QMS.
- Gather Documentation: Compile your Device Master File, Plant Master File, and all essential regulatory documents.
- Apply for Test License (MD13): Submit your initial application via the CDSCO MD Online Portal.
- Plan Product Testing: Book slots at CDSCO-approved testing laboratories early to avoid delays.
- Prepare for Audit: Engage a notified body from the official Notified Bodies List and conduct internal audits.
- Submit Manufacturing License Application (MD5): Once test results and audit reports are ready, file your MD5 application.
- Respond Promptly to Queries: Maintain clear communication with CDSCO authorities to expedite the approval.
We recommend initiating this process at least 4-5 months before your intended market launch date to accommodate potential delays.
For personalized assistance or to start your application process, contact our regulatory experts today. Our proven track record ensures your Radiologic Patient Cradle reaches Indian healthcare providers without unnecessary regulatory roadblocks.