CDSCO License for Rectal Tube
Medical Device Information
Intended Use
A rectal tube, also called a rectal catheter, is a long slender tube which is inserted into the rectum in order to relieve flatulence .

Comprehensive Guide to CDSCO Licensing for Rectal Tube (Class B Medical Device)
Introduction: Understanding Rectal Tubes and Their Regulatory Importance
A rectal tube, also known as a rectal catheter, is a long, slender tube designed for insertion into the rectum to relieve flatulence. Categorized under catheters, this device plays an essential role in patient comfort and clinical care. Given its invasive nature and direct contact with the body, regulatory compliance is critical to ensure safety and efficacy.
In India, the Central Drugs Standard Control Organization (CDSCO) regulates medical devices, including rectal tubes, under the Medical Devices Rules, 2017. Compliance with CDSCO licensing ensures that manufacturers meet stringent quality and safety standards, facilitating smooth market entry and legal distribution across India.
CDSCO Regulatory Framework for Rectal Tubes
The rectal tube falls under the category of catheters, officially notified under Notification 29/Misc/3/2017-DC (292) dated 06.06.2018. As a Class B medical device, it is considered a low to moderate risk device. Its regulation is governed by the Medical Device Rules, which classify devices and specify the corresponding licensing requirements.
As seasoned regulatory consultants with over 25 years of experience and having supported 500+ companies, we understand the nuances involved in navigating the CDSCO licensing landscape for such devices.
Risk Classification and License Requirements for Rectal Tubes
The Medical Device Rules classify devices into four classes – A, B, C, and D – based on risk. Rectal tubes are classified as Class B (low-moderate risk). This classification mandates the manufacturer to obtain an MD5 manufacturing license via Form MD3, issued by the State Licensing Authority.
Key points:
- Device Risk Class: B
- Applicable License: MD5 (Manufacturing License for Class A and B devices)
- Regulatory Authority: State Licensing Authority
For importers, an MD15 import license from the Central Licensing Authority is required, but this guide primarily focuses on manufacturing licensing.
Manufacturing License Process for Rectal Tubes (MD5 License)
Obtaining an MD5 license is a multi-step process that typically spans 3-4 months, involving initial test licensing, product testing, documentation, audit, and final license grant. Here’s a detailed step-by-step overview:
Apply for Test License (Form MD13): Before full license application, manufacturers must secure a test license allowing sample manufacturing for testing purposes. This phase takes about 1.5-2 months.
Product Testing: Undergo mandatory product testing at CDSCO-approved government laboratories to verify compliance with essential principles.
Documentation Preparation: Compile and prepare all required documents, including Device Master File, Plant Master File, risk management file, and quality management system (QMS) documentation.
Submit Application for MD5 License (Form MD3): File the application through the CDSCO MD Online Portal.
Audit by Notified Body: A mandatory audit by a CDSCO-notified body will assess manufacturing facilities and QMS. Refer to the notified bodies list for approved auditors.
Query Resolution: Respond to any queries raised by the licensing authority or notified body promptly.
Grant of License: Upon successful audit and document verification, the State Licensing Authority issues the MD5 manufacturing license.
For a rectal tube, expect the entire process to take approximately 3 to 4 months from test license application to final license issuance.
Manufacturing License Documents Required for Rectal Tube (Class B)
Accurate and complete documentation is paramount. The following are essential:
- Company Constitution Documents: Incorporation certificate, Memorandum and Articles of Association
- Proof of Ownership/Lease of Manufacturing Premises
- Technical Staff Qualification and Experience Certificates: Demonstrating competence
- Fire NOC and Pollution Control NOC: Ensuring environmental compliance
- Device Master File (DMF): Detailed technical specifications, manufacturing process, and drawings. Our detailed Device Master File guide can assist you.
- Plant Master File (PMF): Description of the manufacturing facility, equipment, and personnel. Learn more via our Plant Master File guide.
- Essential Principles Checklist: Demonstrating compliance with the Medical Device Rules
- Risk Management File: Analysis and mitigation of potential device risks. We recommend following best practices in medical device risk management.
- Test Reports: From CDSCO-approved testing laboratories, such as those listed on the Testing Laboratories page.
- Labels and Instructions for Use (IFU): Compliant with regulatory requirements
- Quality Management System (QMS) Documentation: Typically ISO 13485:2016 certification and related procedures
Import License Process for Rectal Tubes (MD15 License)
While this guide focuses on manufacturing, importers of rectal tubes must secure an MD15 import license from CDSCO’s Central Licensing Authority. This process usually takes 5-6 months and involves:
- Preparation of relevant documents including the manufacturing license from the country of origin
- Application submission through the CDSCO MD Online Portal
- Resolution of departmental queries
- Grant of the import license (Form MD15)
For detailed guidance on import licensing, our Import License guide offers practical insights.
Timeline and Processing Duration for MD5 License
Step | Duration |
---|---|
Test License (MD13) | 1.5 to 2 months |
Product Testing | 2 to 3 weeks |
Documentation Preparation | 3 to 4 weeks |
Application Submission | Immediate after docs |
Audit by Notified Body | 3 to 4 weeks |
Query Resolution & Final | 2 to 3 weeks |
Total Estimated Time | 3 to 4 months |
Government Fees and Costs for Rectal Tube MD5 License
- Application Fee: INR 5,000 per application
- Product Fee: INR 500 per product (per unique device variant)
Additional costs include fees for testing at government-approved labs, notified body audit charges, and preparation of technical documentation. Budgeting for these is crucial to avoid delays.
Common Challenges and Solutions in CDSCO Licensing for Rectal Tubes
- Incomplete Documentation: Missing or inconsistent documents cause delays. Ensure all required files, especially DMF and PMF, are comprehensive and up-to-date.
- Delayed Product Testing: Plan testing well in advance; coordinate with CDSCO-approved labs early.
- Audit Non-Compliance: Conduct internal pre-audit assessments to identify gaps in QMS and facility readiness.
- Query Handling: Respond promptly and clearly to queries from authorities to avoid unnecessary delays.
Our team’s experience with over 500 companies enables us to anticipate these issues and provide effective solutions.
Expert Consultation and Support
Navigating CDSCO licensing can be complex. Our expert consultancy services include:
- Pre-application assessment of documents and readiness
- Assistance in preparing Device Master Files and Plant Master Files
- Coordination with notified bodies and testing labs
- End-to-end application management via the CDSCO MD Online Portal
- Training on regulatory compliance and post-market obligations
Partnering with experienced consultants reduces risk and accelerates market entry.
Getting Started with Your CDSCO License Application for Rectal Tubes
- Evaluate your product classification and regulatory requirements: Confirm your device is Class B under current CDSCO notifications.
- Prepare Technical Documentation: Start compiling Device Master File, Plant Master File, and Risk Management File immediately.
- Apply for Test License (Form MD13): Initiate manufacturing and testing permissions.
- Schedule product testing: Engage with CDSCO-approved testing laboratories early.
- Identify a Notified Body: Choose a notified body for audit from the official list.
- Submit your application via the CDSCO MD Online Portal: Ensure all fees are paid and documents uploaded correctly.
- Prepare for and undergo the audit: Conduct internal audits prior to official inspection.
- Respond swiftly to queries: Keep communication lines open and provide clarifications promptly.
By following this roadmap and leveraging expert support, manufacturers of rectal tubes can efficiently obtain their CDSCO MD5 manufacturing license and confidently enter the Indian market.
For detailed assistance and personalized consultancy, contact us to leverage our 25+ years of regulatory expertise and proven success in CDSCO licensing.
Note: All timelines and fees are subject to change based on CDSCO notifications and updates. Always refer to the official CDSCO MD Online Portal for the latest information.