Logo
Chat on WhatsApp

CDSCO License for Software for auditory evoked response stimulator

Medical Device Information

Device Class
Class B

Intended Use

A software for medical device, which is designed to process data obtained from an auditory evoked response stimulator. The resultant data are provided for diagnosis, etc.

Manufacturing License
MD5
Import License
MD15
CDSCO License for Software for auditory evoked response stimulator

Introduction to Software for Auditory Evoked Response Stimulator and Regulatory Importance

Software for auditory evoked response stimulator plays a vital role in modern diagnostic healthcare by processing electrophysiological data to assist clinicians in interpreting auditory pathway functions. As this software directly influences diagnostic decisions, regulatory oversight by the Central Drugs Standard Control Organization (CDSCO) ensures safety, performance, and compliance with Indian medical device laws. Navigating CDSCO licensing is critical for manufacturers aiming to legally market this Class B software in India.

With over 25 years of experience supporting 500+ companies through CDSCO licensing, we provide you with detailed, actionable guidance to streamline your application process, mitigate delays, and comply with regulatory requirements.

CDSCO Regulatory Framework for Software Medical Devices

In India, software intended for medical purposes is regulated as a medical device under the Medical Device Rules (MDR) 2017. The software for auditory evoked response stimulator falls under Class B (low to moderate risk) as per Notification 29/Misc./03/2020-DC (198) dated 13.9.2021. This classification mandates obtaining a manufacturing license (MD5) from the respective State Licensing Authority.

The regulatory framework requires adherence to quality management systems, risk management, product testing, and documentation to ensure device safety and effectiveness.

Risk Classification and License Requirements for Class B Software

Class B devices like this software have moderate risk and require rigorous compliance steps, including:

  • Obtaining a Test License (Form MD13) to perform sample testing
  • Testing products in government-approved laboratories
  • Documenting compliance with Essential Principles and risk management
  • Undergoing audit by notified bodies
  • Applying for Manufacturing License (MD5) via Form MD3

This process ensures robust oversight without the extensive scrutiny reserved for higher-risk devices.

Manufacturing License Process (MD5) for Class B Software

The MD5 license process for Class B software involves several phases:

  1. Test License Application (Form MD13): Submit through the CDSCO MD Online Portal. Processing takes approximately 1.5 to 2 months.

  2. Product Testing: Conduct testing at CDSCO-approved laboratories to validate software performance and safety.

  3. Documentation Preparation: Compile Device Master File, Plant Master File, Risk Management File, Essential Principles Checklist, Quality Management System (QMS) documents, and technical details.

  4. License Application (Form MD3): Apply for the MD5 manufacturing license after test completion.

  5. Audit: Undergo an audit by a notified body from the official list. Audits assess compliance with MDR, QMS, and technical files.

  6. Query Resolution: Respond to any observations or queries from the licensing authority or auditors promptly.

  7. License Grant: Upon satisfactory review, the CDSCO issues the MD5 license.

Manufacturing License Documents Required for Software Auditory Evoked Response Stimulator

For efficient processing, prepare the following comprehensive documents:

  • Company Constitution and Incorporation Certificates
  • Proof of ownership or lease of manufacturing premises
  • Qualification and experience certificates of technical staff
  • Fire Safety and Pollution Control NOCs
  • Device Master File (DMF): Detailed description of software architecture, algorithms, validation protocols, and version control (learn more)
  • Plant Master File (PMF): Overview of manufacturing facility, equipment, and quality assurance (guide here)
  • Essential Principles Checklist confirming compliance with MDR
  • Risk Management File following ISO 14971 principles (risk management insights)
  • Test Reports from approved labs verifying software performance, reliability, and safety
  • Product Labels, Instructions for Use (IFU), and promotional materials
  • Quality Management System documents, preferably ISO 13485:2016 certified

Thorough preparation minimizes audit findings and accelerates license approval.

Import License Process (MD15) for Software Devices

If you intend to import the software instead of manufacturing locally, you must apply for the MD15 import license. This process is managed by the Central Licensing Authority and generally takes 5-6 months.

Steps include:

  • Compile required documents such as manufacturing license from the country of origin, Free Sale Certificate, ISO 13485 certification, CE certificate, DMF, PMF, wholesale license, and company constitution.

  • Submit application via the CDSCO MD Online Portal.

  • Address any departmental queries.

Unlike manufacturing, no test license is required, but comprehensive documentation is critical.

Import License Documents Required

  • Valid manufacturing license from the original country
  • Free Sale Certificate (FSC) confirming legal marketing abroad
  • ISO 13485:2016 Quality Management System certificate
  • CE Certificate (if applicable)
  • Detailed Device Master File and Plant Master File
  • Wholesale drug license
  • Company constitution and ownership proof

Government fees vary by device class; for Class B, expect approximately 2000persiteand2000 per site and 1000 per product.

Timeline and Processing Duration

Process StageApproximate Duration
Test License (MD13)1.5 – 2 months
Product Testing1 – 1.5 months
Documentation PreparationConcurrent with above
License Application (MD3) & Audit1 – 1.5 months
Query Resolution & Final Grant0.5 months

Total Time: Approximately 3 to 4 months for the MD5 manufacturing license process.

Government Fees and Costs

For Class B software devices, the fee structure for MD5 licensing is:

  • Rs. 5000 per application
  • Rs. 500 per product

Additional costs may include:

  • Testing laboratory fees (variable depending on tests)
  • Notified body audit fees
  • Consultancy or expert support fees if engaged

Budgeting realistically for these expenses is crucial to avoid unexpected delays.

Common Challenges and Solutions

Challenge: Delays in test license approval or product testing

Solution: Submit a complete and accurate test license application and choose notified government laboratories with shorter turnaround times.

Challenge: Incomplete documentation leading to audit non-compliance

Solution: Use detailed checklists and templates for DMF, PMF, Risk Management File, and QMS documents. Engage experienced consultants if needed.

Challenge: Responding to queries during audit

Solution: Maintain clear internal records and assign a dedicated regulatory officer to coordinate quick and comprehensive responses.

Challenge: Understanding regulatory updates and classification changes

Solution: Regularly monitor CDSCO notifications and leverage resources such as the Medical Device Classification guide.

Expert Consultation and Support

As seasoned regulatory consultants, we have empowered hundreds of manufacturers and importers to successfully obtain their CDSCO licenses. Our expertise includes:

  • Preparing and reviewing technical documentation
  • Coordinating with testing labs and notified bodies
  • Managing audit readiness and responses
  • Providing tailored regulatory strategy consulting

Engaging expert support can dramatically reduce approval timelines and minimize compliance risks.

Getting Started with Your CDSCO License Application

  1. Evaluate your device classification carefully using official CDSCO guidelines.

  2. Register and create a user profile on the CDSCO MD Online Portal.

  3. Prepare your test license application (Form MD13) and gather all required technical and company documents.

  4. Engage a CDSCO-approved testing laboratory early to schedule your product testing.

  5. Develop your Device Master File and Plant Master File with precise software architecture and manufacturing process details.

  6. Schedule an audit with a notified body from the official list once testing is completed.

  7. Submit the manufacturing license application (Form MD3) online and be prepared to respond promptly to any queries.

By following these practical steps and leveraging expert guidance, you can secure your CDSCO MD5 license for your auditory evoked response stimulator software efficiently and compliantly, unlocking the Indian market for your innovative diagnostic solution.

Get Expert Help

Free consultation for your medical device license

24/7 Support Available

Why Choose Us

500+ Licenses Obtained
100% Success Rate
15+ Years Experience
24/7 Support Available

About the Author

avatar
Tails Azimuth
@Twitter