CDSCO License for Abdominal decompression chamber
Medical Device Information
Intended Use
Non- invasive medical device placed at abdomen to alleviate abdominal pain during pregnancy or delivery.

Comprehensive CDSCO Licensing Guide for Abdominal Decompression Chamber (Class C Medical Device)
With over 25 years of regulatory consulting experience and more than 500 successful CDSCO licensing projects, we understand the complexities involved in bringing medical devices like the Abdominal Decompression Chamber to the Indian market. This non-invasive obstetrical device, designed to alleviate abdominal pain during pregnancy or delivery, is classified as a Class C device under CDSCO regulations, demanding stringent compliance and a thorough approval process.
CDSCO Regulatory Framework for Abdominal Decompression Chamber
The Central Drugs Standard Control Organization (CDSCO) governs the import and manufacture of medical devices in India. Since the Abdominal Decompression Chamber falls under Class C, it is regulated as a moderate-to-high risk device. This classification entails that the Central Licensing Authority (CLA) must approve both manufacturing and import licenses.
The device is notified under File No. 29/Misc./03/2020-DC (181), dated 03.06.2022, confirming its regulatory status and the applicable guidelines for market entry.
Risk Classification and License Requirements for Class C Devices
Class C devices like the Abdominal Decompression Chamber require an MD9 manufacturing license and an MD15 import license if imported. The MD9 license is mandatory for manufacturing and is issued by the CDSCO Central Licensing Authority after a detailed review, testing, and audit process.
- MD9 Manufacturing License: For domestic manufacturers producing Class C devices.
- MD15 Import License: For importers intending to bring the device into India.
Understanding these licenses' nuances is critical to avoid costly delays and ensure compliance.
MD9 Manufacturing License Process for Class C Devices
The MD9 licensing journey typically spans 4 to 5 months and involves several key steps:
Test License Application (Form MD13): Initially, manufacturers must secure a Test License, which permits product testing in government-approved laboratories. This usually takes 1.5 to 2 months.
Product Testing: The device must undergo mandatory safety and efficacy testing by CDSCO-recognized labs. You can refer to the list of testing laboratories for authorized facilities.
Document Preparation: Assemble technical and quality documents, including Device Master File, Plant Master File, Risk Management File, and Essential Principles Checklist.
Application Submission (Form MD7): Submit your manufacturing license application via the CDSCO MD Online Portal.
CDSCO Inspection and Audit: CDSCO inspectors conduct a thorough audit of your manufacturing site, quality management systems, and documentation.
Query Resolution: Address any deficiencies or queries raised by CDSCO promptly.
License Grant: Upon successful compliance, the MD9 license is granted.
For a detailed stepwise approach, our MD9 License Guide is an excellent resource.
Manufacturing License Documents Required for Abdominal Decompression Chamber
Manufacturers must prepare and submit the following documentation:
- Company Constitution/Incorporation Certificate
- Proof of ownership or lease agreement of manufacturing premises
- Details and qualifications of technical staff
- Fire No Objection Certificate (NOC)
- Pollution Control Board NOC
- Device Master File (DMF) – covering design, specifications, and manufacturing process (Device Master File Guide)
- Plant Master File – detailing manufacturing facilities and quality systems (Plant Master File Guide)
- Essential Principles Checklist as per CDSCO requirements
- Risk Management File documenting identified hazards and mitigation strategies (Risk Management Guide)
- Test Reports from government-approved laboratories
- Product Labels and Instructions for Use (IFU)
- Quality Management System (QMS) documents, preferably ISO 13485:2016 certification
Ensuring completeness and accuracy of these documents significantly expedites the approval process.
MD15 Import License Process for Class C Devices
For importers of the Abdominal Decompression Chamber, obtaining the MD15 license is mandatory. The process is managed by the Central Licensing Authority and generally takes 5 to 6 months:
Document Preparation: Collate all necessary documents, including manufacturing license from the country of origin, Free Sale Certificate, ISO 13485:2016 certificate, CE Certificate, Device and Plant Master Files, and Wholesale License.
Application Submission (Form MD14): Submit via the CDSCO MD Online Portal.
Departmental Review: CDSCO evaluates documents and may raise queries.
Query Resolution: Prompt and thorough responses are essential to keep timelines on track.
License Issuance: Upon approval, the MD15 import license is granted.
Our Import License Guide provides an in-depth walkthrough of this process.
Import License Documents Required
Importers should prepare the following:
- Valid Manufacturing License from the country of origin
- Free Sale Certificate or Certificate of Marketing Authorization
- ISO 13485:2016 Certification
- CE Certificate or equivalent international quality mark
- Device Master File and Plant Master File
- Wholesale License for distribution
- Company Constitution/Incorporation Certificate
- Detailed product information including labels and IFU
Proper document management here reduces the risk of prolonged scrutiny.
Timeline and Processing Duration
License Type | Average Duration |
---|---|
Test License (MD13) | 1.5 to 2 months |
MD9 Manufacturing | 4 to 5 months total |
MD15 Import | 5 to 6 months |
Note: These timelines are cumulative and can extend due to incomplete documents or inspection delays.
Government Fees and Costs
MD9 Manufacturing License:
- Application Fee: ₹50,000
- Fee per product: ₹1,000
MD15 Import License:
- For Class C & D devices:
- Site fee: $3,000
- Fee per product: $1,500
- For Class C & D devices:
Additional costs include product testing fees at government-approved labs and audit charges by notified bodies.
Common Challenges and Solutions
Challenge: Delays due to incomplete documentation or non-compliance.
Solution: Use comprehensive checklists and expert review before submission. We recommend consulting our Device Master File Guide and Plant Master File Guide to ensure readiness.
Challenge: Difficulty in navigating CDSCO portal and regulatory updates.
Solution: Regularly monitor the CDSCO MD Online Portal and consult with experienced regulatory professionals.
Challenge: Audit non-conformities during CDSCO inspection.
Solution: Perform internal mock audits and implement a robust Quality Management System (QMS) aligned with ISO 13485.
Expert Consultation and Support
Our team has successfully guided over 500 manufacturers and importers through the CDSCO licensing landscape. We provide:
- End-to-end application preparation and submission
- Detailed gap analysis and documentation support
- Liaison with CDSCO and notified bodies
- Training on regulatory compliance and QMS implementation
Leveraging our expertise can save months of processing time and prevent costly rejections.
Getting Started with Your CDSCO License Application
Assess Device Classification: Confirm your Abdominal Decompression Chamber is Class C.
Initiate Test License (if manufacturing): Begin with Form MD13 application on the CDSCO MD Online Portal.
Plan for Product Testing: Schedule testing at CDSCO-recognized laboratories.
Prepare Documentation: Compile Device Master File, Plant Master File, Risk Management File, and other mandatory documents.
Engage Expert Support: Consider partnering with experienced consultants for audit readiness and application accuracy.
**Submit Manufacturing License Application (Form MD7) or Import License Application (Form MD14) as applicable.
Track Application Status: Monitor progress via the CDSCO portal and respond promptly to queries.
By following this structured approach, manufacturers and importers of the Abdominal Decompression Chamber can navigate the CDSCO licensing process efficiently, ensuring timely market access and regulatory compliance.
For detailed assistance, reach out to our expert team to discuss a tailored strategy for your device.