Logo
Chat on WhatsApp

CDSCO License for Artificial airway tube cuff pressure monitor

Medical Device Information

Device Class
Class B

Intended Use

A device intended to intermittently or continuously measure the internal pressure in the cuff of an endotracheal (ET)/endobronchial/tracheostomy tube when this has been situated into the tracheal passage.

Manufacturing License
MD5
Import License
MD15
CDSCO License for Artificial airway tube cuff pressure monitor

Comprehensive Guide to CDSCO Licensing for Artificial Airway Tube Cuff Pressure Monitor (Class B Device)

As seasoned regulatory consultants with over 25 years of experience and having successfully supported 500+ companies, we understand the critical importance of securing your CDSCO license to legally manufacture or import medical devices in India. This guide focuses on the Artificial Airway Tube Cuff Pressure Monitor, a Class B respiratory device, detailing the regulatory pathway, timelines, costs, and practical tips for a smooth licensing process.

Understanding the Device and Regulatory Importance

The Artificial Airway Tube Cuff Pressure Monitor is an essential device designed to intermittently or continuously measure the internal pressure within the cuff of endotracheal, endobronchial, or tracheostomy tubes. Proper cuff pressure monitoring is vital to patient safety, preventing tracheal injury or aspiration during mechanical ventilation. Given its critical role, this device falls under Class B (low-moderate risk) according to the CDSCO classification system.

The device is notified under File No. 29/Misc/03/2020-DC(197), dated 6.8.2021, signifying its recognition and regulation under the Indian medical device framework.

CDSCO Regulatory Framework for Artificial Airway Tube Cuff Pressure Monitor

Class B devices like this monitor require a Manufacturing License (MD5) issued by the State Licensing Authority. The CDSCO framework mandates adherence to the Medical Devices Rules, 2017, with oversight on quality, safety, and efficacy to protect public health.

For manufacturers, this means compliance with both central and state regulations, including pre-market testing, quality management systems, and thorough documentation.

Risk Classification and License Requirements

  • Device Class: B (Low-Moderate Risk)
  • License Type: MD5 Manufacturing License
  • Application Form: MD3
  • Issuing Authority: State Licensing Authority

The MD5 license process is compulsory before manufacturing the device in India. For importers, an MD15 import license from the CDSCO Central Licensing Authority is required, but since this content is focused on manufacturers, MD5 guidance is primary.

Manufacturing License Process (MD5 License)

The MD5 license process involves several key steps:

  1. Test License Application (Form MD13): Before full manufacturing, a test license is mandatory for initial production and testing of the device. This takes approximately 1.5 to 2 months.

  2. Product Testing: The device must be tested in CDSCO-approved government laboratories to verify compliance with Indian standards. You can find the list of testing laboratories authorized by CDSCO.

  3. Documentation Preparation: Including Device Master File, Plant Master File, Risk Management File, and Essential Principles Checklist.

  4. Application Submission (Form MD3): Submit your manufacturing license application through the CDSCO MD Online Portal.

  5. Audit by Notified Body: Post application, an audit of your manufacturing site and quality systems is conducted by a notified body. Refer to the list of notified bodies authorized for MD5 audits.

  6. Resolution of Queries: Address any observations or queries raised by the department or the notified body.

  7. Grant of MD5 License (Form MD5): Upon successful review and audit, the license is granted.

Manufacturing License Documents Required

For your Artificial Airway Tube Cuff Pressure Monitor, prepare the following critical documents:

  • Company Constitution/Registration Certificate
  • Proof of Ownership or Lease of Manufacturing Premises
  • Technical Staff Qualification and Experience Documents
  • Fire and Pollution No Objection Certificates (NOCs)
  • Device Master File (DMF): Detailed product specifications, design, materials, manufacturing process. Our comprehensive Device Master File guide can help streamline this.
  • Plant Master File (PMF): Details about your manufacturing facility, equipment, and quality control processes. See our guide on Plant Master Files.
  • Essential Principles Checklist: Compliance with safety and performance requirements.
  • Risk Management File: Analysis and mitigation of device risks. Learn more about Risk Management.
  • Test Reports: From CDSCO-approved labs.
  • Product Labels and Instructions for Use (IFU): Compliant with CDSCO labeling guidelines.
  • Quality Management System (QMS) Documents: ISO 13485 certification and internal quality manuals.

Import License Process (MD15 License) Overview

While this article primarily targets manufacturers, importers of the device must apply for the MD15 license via Form MD14 through the central authority. The process takes approximately 5-6 months and requires documentation such as Free Sale Certificate, ISO 13485, CE certificates, and manufacturing licenses from the country of origin.

For detailed import licensing procedures, consult our Import License Guide.

Timeline and Processing Duration

MD5 License (Class B Device) Timeline:

  • Test License (MD13): 1.5 to 2 months
  • Product Testing: 3 to 4 weeks
  • Documentation Preparation: 2 to 3 weeks
  • Application Submission & Notified Body Audit: 1 to 1.5 months
  • Query Resolution and Final Approval: 2 to 3 weeks

Total Duration: Approximately 3 to 4 months from start to license grant.

Government Fees and Costs

  • MD5 Application Fee: ₹5,000 per application
  • Product Fee: ₹500 per product

Additional costs include:

  • Laboratory testing fees
  • Notified body audit charges
  • Consultant fees (if applicable)

These costs can vary depending on the notified body and testing laboratory selected.

Common Challenges and Solutions

Challenge 1: Delays in Testing and Audit Scheduling

  • Solution: Engage CDSCO-approved labs early and pre-schedule audits with notified bodies. Maintain open communication to avoid bottlenecks.

Challenge 2: Incomplete Documentation or Non-Compliance

  • Solution: Use detailed checklists for DMF, PMF, and risk management files. Leverage expert consultation to review documents before submission.

Challenge 3: Resolving Department Queries

  • Solution: Respond promptly with clear, substantiated information. Document all communications meticulously.

Expert Consultation and Support

Our extensive experience with over 500 successful CDSCO licensing projects ensures you receive tailored guidance to navigate the regulatory complexities efficiently. From helping prepare your Device and Plant Master Files to coordinating the notified body audit, our team streamlines the process and mitigates risks.

Getting Started with Your CDSCO License Application

  1. Initiate Device Testing: Apply for the test license (MD13) via the CDSCO MD Online Portal.

  2. Select Testing Laboratory: Choose a CDSCO-approved testing laboratory early to avoid delays.

  3. Prepare Comprehensive Documentation: Start compiling your Device Master File, Plant Master File, Risk Management File, and Essential Principles Checklist.

  4. Plan for Audit: Identify and engage a notified body from the official list of notified bodies.

  5. Budget for Fees and Timelines: Allocate resources for government fees, testing, audits, and possible consultancy.

  6. Submit Application: Once testing and documentation are complete, submit the application for MD5 license via the portal.

  7. Respond to Queries Promptly: Maintain active communication with CDSCO and the notified body during the review phase.

By following this structured approach, manufacturers of the Artificial Airway Tube Cuff Pressure Monitor can confidently enter the Indian market with full regulatory compliance and minimal delays.

For further personalized assistance, reach out to our expert team to ensure your CDSCO licensing journey is smooth and successful.

Get Expert Help

Free consultation for your medical device license

24/7 Support Available

Why Choose Us

500+ Licenses Obtained
100% Success Rate
15+ Years Experience
24/7 Support Available

About the Author

avatar
Tails Azimuth
@Twitter