Logo
Chat on WhatsApp

CDSCO License for Body waste receptacle.

Medical Device Information

Important Notice for Class A Devices

Class A Non-sterile Non Measuring devices are exempt from MD5 and MD15 licenses. Only CDSCO registration is required as per GSR 777(E).

Device Class
Class A

Intended Use

A body waste receptacle is a device intended for medical purposes that is not attached to the body and that is used to collect the body wastes of a bed patient.

Manufacturing License
MD5
Import License
MD15
CDSCO License for Body waste receptacle.

Introduction to Body Waste Receptacle and Its Regulatory Importance

A body waste receptacle is a crucial medical device used in healthcare settings to collect bodily waste from bed patients. Classified under General Hospital or Orthopaedic Instruments, this device plays an essential role in patient hygiene and infection control. Given its medical application, regulatory approval from the Central Drugs Standard Control Organization (CDSCO) is mandatory before manufacturing or importing the device in India.

With over 25 years of experience and having supported 500+ companies in obtaining CDSCO licenses, we understand the nuances involved in navigating the regulatory landscape for Class A medical devices like the body waste receptacle. Ensuring compliance not only facilitates market entry but also builds trust with healthcare providers.

CDSCO Regulatory Framework for Body Waste Receptacle

The CDSCO regulates medical devices through a classification-based licensing system. The body waste receptacle falls under Class A, which represents low-risk devices. This classification is based on the notification 29/Misc./03/2020-DC (193)- Part-3 dated 16.03.2022.

For Class A devices, the manufacturing license is issued by the State Licensing Authority under the MD5 license scheme. Compliance with essential principles, quality management systems, and product testing is mandatory.

Risk Classification and License Requirements for Class A Devices

The body waste receptacle's classification as a Class A device implies:

  • Low Risk: The device has minimal risk to patients and users.
  • License Type: MD5 Manufacturing License.
  • Authority: State Licensing Authority.

Manufacturers need to obtain a test license (Form MD13) first, conduct product testing in CDSCO-approved labs, and undergo an audit by a notified body before the manufacturing license (Form MD3) can be granted.

Manufacturing License Process for Body Waste Receptacle (MD5 License)

The MD5 license process for Class A devices involves several key steps:

  1. Apply for Test License (Form MD13): This initial step allows you to manufacture the device prototype for testing purposes.
  2. Product Testing: Conduct testing at a CDSCO-recognized laboratory to verify compliance with applicable standards. A list of such labs is available on the CDSCO MD Online Portal.
  3. Documentation Preparation: Compile all required documents including Device Master File, Plant Master File, Essential Principles Checklist, and Risk Management File.
  4. Submit Manufacturing License Application (Form MD3): File the application for the MD5 license through the CDSCO MD Online Portal.
  5. Audit by Notified Body: The manufacturing facility undergoes an audit by a notified body certified by CDSCO. Refer to the current list of notified bodies for selection.
  6. Query Resolution: Address any queries raised by the licensing authority or notified body.
  7. License Grant (Form MD5): Upon satisfactory review and audit, the MD5 license is issued.

This process typically takes about 3-4 months from test license application to final grant.

Manufacturing License Documents Required for Body Waste Receptacle

To ensure a smooth application process, prepare the following documents meticulously:

  • Company Constitution: Memorandum and Articles of Association or Partnership Deed.
  • Proof of Ownership or Lease of Manufacturing Premises: Valid property documents.
  • Technical Staff Details: Qualifications and experience of key personnel.
  • Fire and Pollution NOCs: Obtained from local authorities.
  • Device Master File (DMF): Detailed documentation of product design, specifications, and manufacturing process. Our comprehensive Device Master File guide can assist you.
  • Plant Master File (PMF): Details of the manufacturing facility and quality control systems. Explore our Plant Master File guide for best practices.
  • Essential Principles Checklist: Confirming compliance with CDSCO’s essential principles.
  • Risk Management File: Demonstrating risk assessment and mitigation strategies. Learn more about implementing risk management.
  • Test Reports: From CDSCO-approved labs validating product safety and efficacy.
  • Labels and Instructions for Use (IFU): Compliant with regulatory standards.
  • Quality Management System (QMS) Documents: Such as ISO 13485 certificates and internal SOPs.

Import License Process for Body Waste Receptacle (MD15 License)

If you are an importer of the body waste receptacle, obtaining the MD15 import license is mandatory. The process involves:

  • Document Preparation: Assemble all necessary documents including the manufacturing license from the exporting country, Free Sale Certificate, ISO 13485:2016, CE Certificate (if applicable), Device Master File, Plant Master File, wholesale license, and company constitution.
  • Application Submission: File the application on Form MD14 via the CDSCO MD Online Portal.
  • Review and Queries Resolution: Address any clarifications requested by CDSCO.
  • License Grant: MD15 license is issued by the Central Licensing Authority.

The entire import license process generally takes 5-6 months.

Import License Documents Required

Key documents needed for the MD15 import license include:

  • Valid Manufacturing License issued by the country of origin
  • Free Sale Certificate confirming product marketability
  • ISO 13485:2016 certification
  • CE Certificate or other international certifications
  • Device Master File and Plant Master File
  • Wholesale Drug License
  • Company Constitution documents

Ensuring that these documents are complete and authentic dramatically reduces processing delays.

Timeline and Processing Duration

License TypeSteps InvolvedApproximate Duration
Test License (MD13)Application, Testing1.5 - 2 months
Manufacturing License (MD5)Audit, Query Resolution, GrantAdditional 1.5 - 2 months
Import License (MD15)Documentation, Review, Grant5 - 6 months

Overall, expect about 3-4 months for manufacturing license of a Class A device and 5-6 months for import license.

Government Fees and Costs

For Class A body waste receptacles, the fee structure is as follows:

  • MD5 Manufacturing License:

    • Application Fee: Rs 5,000
    • Per Product Fee: Rs 500
  • MD13 Test License:

    • Fees included in manufacturing license application process
  • MD15 Import License:

    • Class A Devices: 1000persite+1000 per site + 50 per product

Budgeting for these fees upfront helps avoid unexpected expenses.

Common Challenges and Solutions

Challenge 1: Delays in Product Testing

Solution: Engage early with CDSCO-approved laboratories to schedule testing. Maintain clear communication and ensure samples meet testing criteria to avoid rejections.

Challenge 2: Incomplete Documentation

Solution: Use checklists and expert reviews to ensure all documents, especially Device Master File and Risk Management File, are comprehensive and comply with CDSCO requirements.

Challenge 3: Audit Non-Compliance

Solution: Prepare your manufacturing facility according to ISO 13485 standards and conduct internal audits before the notified body inspection. Address any gaps promptly.

Challenge 4: Query Resolution Delays

Solution: Assign dedicated regulatory personnel to respond promptly and accurately to CDSCO queries to keep the application moving forward.

Expert Consultation and Support

Navigating CDSCO licensing can be complex, especially with evolving regulatory standards. Our team has successfully guided over 500 companies through the MD5 licensing process for Class A devices like the body waste receptacle. We provide:

  • Comprehensive gap assessments
  • Document preparation and review
  • Coordination with testing laboratories and notified bodies
  • Training on compliance and audit readiness

Partnering with experienced consultants reduces risks and accelerates approvals.

Getting Started with Your CDSCO License Application

To initiate your journey toward manufacturing or importing body waste receptacles in India:

  1. Register on the CDSCO MD Online Portal: Create your account and familiarize yourself with the online application system.
  2. Prepare Required Documents: Use our detailed guides on Device Master File and Plant Master File to compile your documentation.
  3. Apply for Test License (MD13): Submit your application to start the testing phase.
  4. Identify a CDSCO-Approved Testing Laboratory: Schedule your product testing early to avoid delays.
  5. Plan for Notified Body Audit: Select a notified body from the official list provided by CDSCO and prepare your facility accordingly.
  6. Maintain Open Communication: Assign a dedicated regulatory lead to handle queries and follow-ups.

Starting with these concrete steps sets a solid foundation for successful licensing. Our experts are ready to assist you throughout this process to ensure timely and compliant market entry.

For more detailed assistance, explore our specialized guides on MD5 Licensing.


By following this comprehensive roadmap, manufacturers and importers of body waste receptacles can confidently navigate CDSCO regulations, ensuring their devices reach Indian healthcare providers efficiently and compliantly.

Get Expert Help

Free consultation for your medical device license

24/7 Support Available

Why Choose Us

500+ Licenses Obtained
100% Success Rate
15+ Years Experience
24/7 Support Available

About the Author

avatar
Tails Azimuth
@Twitter