CDSCO License for Central Venous Catheters
Medical Device Information
Intended Use
It is indicated for use in patients requiring administration of solutions, blood sampling, central venous pressure monitoring and injection of contrast media.

Introduction to Central Venous Catheters and Regulatory Importance
Central Venous Catheters (CVCs) are critical medical devices used for administering solutions, blood sampling, central venous pressure monitoring, and injection of contrast media. Given their invasive nature and critical applications, they fall under Class C risk classification per CDSCO regulations. Ensuring compliance with India’s regulatory framework is vital for manufacturers and importers aiming to market CVCs in India. With over 25 years of expertise assisting 500+ companies in securing CDSCO licenses, we provide a comprehensive roadmap to navigate the regulatory process smoothly.
CDSCO Regulatory Framework for Central Venous Catheters
The Central Drugs Standard Control Organization (CDSCO) regulates medical devices under the Medical Device Rules, 2017. Central Venous Catheters are notified under notification number 29/Misc/3/2017-DC (292) dated 06.06.2018 and classified as Class C devices due to their medium-to-high risk profile. This classification mandates a license granted by the Central Licensing Authority, involving stringent evaluation, testing, and audits.
Risk Classification and License Requirements
Class C devices like CVCs require an MD9 manufacturing license, which is overseen by the CDSCO Central Licensing Authority. The MD9 license process is more rigorous compared to Class A or B devices, reflecting the potential risks associated with these devices. Importers of CVCs require an MD15 import license issued by the same authority.
Understanding these classifications and license types is crucial before initiating your application. You can review detailed classifications in the Medical Device Classification guide.
Manufacturing License Process (MD9) for Central Venous Catheters
The manufacturing license (MD9) application process for Class C devices typically spans 4 to 5 months, comprising several key steps:
- Test License (Form MD13): Obtain a test license to manufacture sample devices for testing. This phase takes approximately 1.5 to 2 months.
- Product Testing: Conduct product testing at CDSCO-approved government laboratories. Testing ensures compliance with applicable standards and safety requirements. Refer to the list of testing laboratories for authorized facilities.
- Document Preparation: Prepare extensive documentation including Device Master File, Plant Master File, Risk Management File, and Quality Management System (QMS) documents.
- License Application (Form MD7): Submit the manufacturing license application through the CDSCO MD Online Portal.
- Audit and Inspection: CDSCO inspectors will audit your manufacturing site and review documentation for compliance.
- Resolution of Queries: Address any queries or deficiencies raised during inspection or document review promptly.
- Grant of License (Form MD9): Upon successful review and audit, the manufacturing license is granted.
Manufacturing License Documents Required
For a Class C Central Venous Catheter manufacturing license, you will need the following:
- Company Constitution (Incorporation Certificate, MOA, AOA)
- Proof of Ownership or Lease of Manufacturing Premises
- Qualification and Experience Documents of Technical Staff
- Fire and Pollution NOCs
- Device Master File (technical specifications, design details, manufacturing process) Device Master File Guide
- Plant Master File (facility layout, equipment, quality system) Plant Master File Guide
- Essential Principles Checklist (compliance with safety and performance requirements)
- Risk Management File (per ISO 14971 standards) Risk Management Guidance
- Product Test Reports from government-approved labs
- Labels and Instructions for Use (IFU)
- Quality Management System documentation (ISO 13485:2016 compliance)
Import License Process (MD15) for Central Venous Catheters
Importers of Central Venous Catheters must obtain the MD15 import license from the CDSCO Central Licensing Authority. The process typically requires 5 to 6 months and involves:
- Document Preparation: Assemble necessary documents including manufacturing license from the country of origin, Free Sale Certificate, ISO 13485 certification, CE Certificate, Device Master File, and Plant Master File.
- Application Submission: File the application using Form MD14 on the CDSCO MD Online Portal.
- Queries Resolution: Respond to any department queries promptly.
- License Grant: Once the application and documents are satisfactory, the MD15 license is issued.
Import License Documents Required
- Valid Manufacturing License of the foreign manufacturer
- Free Sale Certificate from country of origin
- ISO 13485:2016 Certificate
- CE Certificate or equivalent
- Device Master File
- Plant Master File
- Wholesale License in India (if applicable)
- Company Constitution documents
Timeline and Processing Duration
Process Step | Duration |
---|---|
Test License (MD13) | 1.5 – 2 months |
Product Testing | 1 – 1.5 months |
Document Preparation | 2 – 3 weeks |
Application Processing | 1 – 1.5 months |
Audit and Inspection | Concurrent with above |
Total for MD9 License | Approximately 4 – 5 months |
Import License (MD15) | Approximately 5 – 6 months |
Planning for these timelines and initiating early testing and documentation preparation can greatly reduce delays.
Government Fees and Costs
For Class C devices such as Central Venous Catheters, the fee structure is as follows:
- MD9 Manufacturing License:
- Application fee: Rs 50,000
- Per product fee: Rs 1,000
- Import License MD15 (USD fees):
- Site fee: $3,000
- Per product fee: $1,500
These fees are payable online via the CDSCO portal during the application process. Remember to budget for additional costs including testing fees, notified body audit charges, and consultancy fees if applicable.
Common Challenges and Solutions
Challenge 1: Incomplete Documentation
- Missing or improperly prepared Device Master Files and Risk Management Files can delay approvals.
- Solution: Use detailed checklists and expert templates to ensure all documents meet CDSCO standards.
Challenge 2: Delays in Product Testing
- Testing in government-approved labs can have backlogs.
- Solution: Book lab slots early and consider parallel preparation of documentation.
Challenge 3: Audit Non-Compliance
- Site audits may reveal gaps in QMS or facility readiness.
- Solution: Conduct internal mock audits and pre-assessment with notified bodies listed on the Notified Bodies List.
Challenge 4: Query Resolution Delays
- Slow responses to CDSCO queries can stall licensing.
- Solution: Assign dedicated regulatory personnel to handle communications promptly.
Expert Consultation and Support
Navigating the MD9 and MD15 license process for Central Venous Catheters can be complex. With our 25+ years of experience and successful track record with 500+ companies, we provide end-to-end support including:
- Gap analysis and readiness assessment
- Document preparation and review
- Coordination with government laboratories and notified bodies
- Audit preparation and accompaniment
- Query handling and liaison with CDSCO officials
Our expert guidance minimizes your risk of rejection and accelerates your time to market.
Getting Started with Your CDSCO License Application
- Assess Your Device Classification: Confirm your CVC as Class C per CDSCO guidelines.
- Register on the CDSCO MD Online Portal: Create an account to access application forms and submission facilities.
- Initiate Test License (MD13) Application: Begin manufacturing sample units for testing.
- Identify Testing Labs: Contact government-approved labs early to schedule product testing.
- Prepare Documentation: Use our detailed checklists and templates for Device Master File, Plant Master File, and Risk Management.
- Engage a Regulatory Consultant: If new to CDSCO processes, expert support can save months of effort.
- Submit MD9 License Application: Once testing and documents are ready, apply via the CDSCO MD Online Portal.
By following this structured approach, you can confidently progress through the regulatory requirements for Central Venous Catheters and achieve market authorization within expected timelines.
For comprehensive guidance tailored to your specific needs, reach out to our regulatory consulting team today and leverage our proven expertise in CDSCO licensing.