CDSCO License for Container for orthopaedic cement dispensor
Medical Device Information
Important Notice for Class A Devices
Class A Non-sterile Non Measuring devices are exempt from MD5 and MD15 licenses. Only CDSCO registration is required as per GSR 777(E).
Intended Use
A sterile device in which an orthopaedic cement dispenser is placed to maintain the sterility of the dispenser and its contents when it is taken out of the sterile field to be mixed. The product does not include orthopaedic implants.

Introduction to Container for Orthopaedic Cement Dispenser and Regulatory Importance
Manufacturers and importers of medical devices such as the Container for Orthopaedic Cement Dispenser play a critical role in ensuring patient safety and product efficacy. This device, classified as a Class A sterile medical device under the category of General Hospital or Orthopaedic Instruments, serves a vital function by maintaining the sterility of the orthopaedic cement dispenser during handling outside the sterile field. While it does not include orthopaedic implants, regulatory compliance is essential to enter the Indian market legally and efficiently.
The Central Drugs Standard Control Organization (CDSCO) oversees the regulation of medical devices in India. Obtaining the correct CDSCO license not only ensures legal manufacturing or import but also builds trust with healthcare providers and end-users. With over 25 years of expertise and having supported 500+ companies, we understand the nuances of the CDSCO licensing process for Class A devices like this container.
CDSCO Regulatory Framework for Container for Orthopaedic Cement Dispenser
The CDSCO regulates medical devices as per the Medical Device Rules, 2017. Your device falls under the notification number 29/Misc./03/2020-DC (193)- Part-3 dated 16.03.2022, which clarifies its classification and regulatory pathway. As a Class A device, it is considered low risk and is regulated primarily by the State Licensing Authority through the MD5 license route.
Understanding the regulatory framework helps you prepare precise documentation and avoid unnecessary delays. The CDSCO online portal (https://cdscomdonline.gov.in/) is the official channel for submitting applications and tracking progress.
Risk Classification and License Requirements for Class A Devices
Class A devices are deemed low risk and require a MD5 manufacturing license for domestic manufacturing. For importers, an MD15 import license is applicable, but since your focus is manufacturing, we will detail the MD5 process.
Your device's classification as Class A means:
- Licensing authority: State Licensing Authority
- Application form: MD3 for manufacturing license
- Test license (Form MD13) mandatory before full license
- Total timeline: Approximately 3-4 months
- Fees: Rs 5,000 application + Rs 500 per product
For detailed classification, visit Medical Device Classification.
Manufacturing License Process (MD5) for Class A Devices
The MD5 license process is methodical and involves several key steps:
Obtain Test License (Form MD13): Application submitted to the State Licensing Authority to manufacture the device for testing purposes. This typically takes 1.5 to 2 months.
Product Testing: After test license approval, the product samples must be tested in CDSCO-approved labs to confirm compliance with essential principles and safety standards. Refer to the official list of Testing Laboratories.
Documentation Preparation: Prepare comprehensive documentation including Device Master File (DMF), Plant Master File (PMF), Risk Management File, Quality Management System (QMS) documents, and others.
Apply for Manufacturing License (Form MD3): Submit the application with all supporting documents via the CDSCO MD Online Portal.
Audit by Notified Body: A notified body listed at Notified Bodies List will conduct an audit of your manufacturing facility and quality systems.
Query Resolution: Address any queries raised by the State Licensing Authority or the notified body promptly.
Grant of License (Form MD5): Upon satisfactory review, the manufacturing license is granted.
Manufacturing License Documents Required for Container for Orthopaedic Cement Dispenser
Accurate and complete documentation is crucial for smooth processing. For your device, the following documents are mandatory:
- Company Constitution (Certificate of Incorporation, Partnership Deed, etc.)
- Proof of Ownership/Rent Agreement of Manufacturing Premises
- Technical Staff Qualification and Experience Certificates
- Fire NOC and Pollution Control NOC
- Device Master File (DMF): Detailed device description, design, manufacturing process, and specifications. Our Device Master File guide helps prepare this critical document.
- Plant Master File (PMF): Information about manufacturing facility, equipment, cleanliness, and quality assurance processes. See our Plant Master File Guide for best practices.
- Essential Principles Checklist: Compliance with safety and performance standards.
- Risk Management File: Risk analysis and mitigation strategies aligned with ISO 14971. Learn more at Risk Management.
- Test Reports: From CDSCO-approved laboratories.
- Labels and Instructions for Use (IFU): As per regulatory requirements.
- Quality Management System (QMS) Documents: ISO 13485 certification and internal SOPs.
Import License Process (MD15) – Brief Overview
Although your device falls under Class A and primarily requires MD5 manufacturing licensing, importers must obtain an MD15 license from the Central Licensing Authority. This involves:
- Document preparation including Free Sale Certificate, ISO 13485, CE Certificate
- Application on Form MD14 via CDSCO portal
- Processing time: 5-6 months
- Fees: Class A import license fees are 50 per product
For detailed guidance, see our Import License Guide.
Timeline and Processing Duration
For the MD5 license of your Container for Orthopaedic Cement Dispenser, the expected timeline is:
- Test License (MD13) Approval: 1.5 to 2 months
- Product Testing: 1 month (varies based on lab backlog)
- Document Preparation: Concurrent with testing
- Application Submission (MD3) and Audit: 1 to 1.5 months
- Query Resolution and Final Approval: 2 to 4 weeks
Total Estimated Time: Approximately 3 to 4 months from start to finish.
Government Fees and Costs
The fee structure for Class A devices under MD5 license is as follows:
- Application Fee: Rs 5,000 per application
- Product Fee: Rs 500 per product
Additional costs may include:
- Notified Body Audit Fees (varies by body)
- Testing charges at government-approved labs
- Consultant or legal fees if external help is engaged
Planning your budget with these specifics avoids surprises later.
Common Challenges and Solutions
Manufacturers often face challenges such as:
Incomplete Documentation: Missing or inconsistent files delay approvals. Using checklists and templates can mitigate this.
Delayed Testing: Labs may have backlogs. Early sample submission and choosing less busy labs help.
Audit Non-compliance: Not meeting GMP or QMS norms causes rejections. Pre-audit internal checks and training are vital.
Query Resolution Delays: Slow responses can prolong the process. Assign dedicated personnel to handle communications promptly.
Our experience shows proactive planning and thorough preparation significantly smooth the licensing journey.
Expert Consultation and Support
Navigating CDSCO licensing can be complex. We offer tailored consultancy leveraging our 25+ years’ expertise and a proven track record with over 500 successful client licenses. Our services include:
- Gap analysis and documentation review
- Assistance with test license and manufacturing license applications
- Coordination with notified bodies and labs
- Training on regulatory compliance and quality systems
Partnering with experts reduces errors, accelerates approvals, and ensures compliance.
Getting Started with Your CDSCO License Application
To initiate your MD5 license process for the Container for Orthopaedic Cement Dispenser, follow these practical steps:
Assess Your Device Classification: Confirm Class A status as per the notification.
Prepare Initial Documents: Company constitution, premises proof, technical staff details.
Apply for Test License (Form MD13): Submit via the CDSCO MD Online Portal.
Arrange Product Testing: Coordinate with CDSCO-approved labs early to avoid delays.
Develop Device Master File and Plant Master File: Utilize expert guides linked above for compliance.
Plan for Notified Body Audit: Choose an accredited notified body from the official list.
Submit Manufacturing License Application (Form MD3): After test license and testing completion.
Monitor Application Progress: Respond to queries promptly through the online portal.
By following this roadmap and leveraging our deep regulatory insight, your pathway to CDSCO compliance will be efficient and successful.
For hands-on assistance, feel free to reach out to our regulatory experts who have guided numerous manufacturers in the orthopaedic and sterile device sectors.