CDSCO License for Electromechanical orthopaedic extracorporeal shock wave therapy system
Medical Device Information
Intended Use
Intended to provide electromechanical orthopaedic extracorporeal shock wave therapy (OEST) to treat musculoskeletal disorders.

Introduction: Electromechanical Orthopaedic Extracorporeal Shock Wave Therapy System and Regulatory Importance
Electromechanical orthopaedic extracorporeal shock wave therapy systems (OEST) are advanced rehabilitation devices designed to treat musculoskeletal disorders through targeted shock wave application. Given their critical role in orthopaedic therapy and patient safety implications, these devices are classified as Class C under the Indian medical device regulatory framework. Ensuring compliance with the Central Drugs Standard Control Organization (CDSCO) licensing requirements is essential for manufacturers and importers aiming to market these devices in India.
With over 25 years of experience supporting 500+ companies in navigating the CDSCO licensing process, we provide comprehensive insights specific to electromechanical OEST systems to help you achieve regulatory success efficiently.
CDSCO Regulatory Framework for Electromechanical Orthopaedic Shock Wave Therapy Systems
Under the Medical Device Rules (MDR) 2017, the CDSCO governs the approval, manufacturing, and import of medical devices based on risk classification. Electromechanical OEST systems fall under Class C due to their moderate to high risk profile. This classification dictates stringent regulatory controls, including mandatory testing, audits, and licensing by the Central Licensing Authority.
The key licenses applicable are:
- MD9 Manufacturing License (Form MD7) for domestic manufacturers
- MD15 Import License (Form MD14) for importers
Understanding the regulatory nuances for Class C devices ensures compliance while minimizing delays and unexpected costs.
Risk Classification and License Requirements for Class C Devices
The classification of electromechanical OEST systems as Class C means the device has a moderate to high risk potential, requiring:
- Compliance with Essential Principles of Safety and Performance
- Submission of a Device Master File (DMF) and Plant Master File (PMF)
- Quality Management System (QMS) adherence, typically ISO 13485:2016
- Product testing by CDSCO-approved laboratories
- Audit by CDSCO Inspectors or notified bodies
Manufacturers must apply for an MD9 license, while importers require the MD15 license. Both processes involve detailed documentation, product testing, and regulatory scrutiny.
For an in-depth understanding of classification, review our Medical Device Classification guide.
Manufacturing License Process for MD9 (Class C Devices)
Step 1: Obtain Test License (Form MD13)
Before applying for the MD9 license, manufacturers must secure a test license valid for 6 months to conduct product testing. This typically takes 1.5 to 2 months from application submission.
Step 2: Product Testing
Testing must be performed at CDSCO-approved laboratories to verify compliance with Indian standards. Testing duration varies but generally takes 4 to 6 weeks. Refer to the list of approved testing laboratories.
Step 3: Document Preparation
Prepare comprehensive documentation, including the Device Master File, Plant Master File, Risk Management File, and Essential Principles Checklist.
Step 4: Application Submission
Apply for the MD9 license via the CDSCO MD Online Portal using Form MD7.
Step 5: CDSCO Inspection and Audit
Post-application, CDSCO inspectors conduct an on-site audit to verify manufacturing practices and QMS implementation. This may take 4 to 6 weeks.
Step 6: Query Resolution
Respond promptly to any queries raised by CDSCO or auditors to avoid delays.
Step 7: License Grant
Upon successful audit and documentation review, the MD9 manufacturing license (Form MD9) is granted.
The full MD9 license process spans approximately 4 to 5 months.
For detailed guidance, visit our MD9 License Guide.
Manufacturing License Documents Required for Electromechanical OEST Systems
- Company Constitution (Incorporation Certificate, MOA, AOA)
- Proof of Ownership or Lease of Manufacturing Premises
- Technical Staff Qualification and Experience Documents
- Fire and Pollution NOCs
- Device Master File (DMF) detailing design, specifications, and manufacturing process Device Master File guide
- Plant Master File (PMF) outlining manufacturing facilities and infrastructure Plant Master File guide
- Essential Principles Checklist ensuring compliance with safety and performance requirements
- Risk Management File documenting hazard identification and mitigation strategies Risk Management resource
- Test Reports from CDSCO-approved laboratories
- Labels and Instructions for Use (IFU)
- Quality Management System (QMS) documentation (ISO 13485:2016 certification preferred)
Import License Process for MD15 (Class C Devices)
Step 1: Document Compilation
Importers must compile detailed technical and regulatory documentation, including a valid manufacturing license from the country of origin.
Step 2: Application Submission
Submit the MD15 application via the CDSCO MD Online Portal using Form MD14.
Step 3: Review and Query Resolution
Respond to any queries raised by CDSCO promptly to facilitate smooth processing.
Step 4: License Issuance
The MD15 import license is issued upon satisfactory review. This process typically takes 5 to 6 months.
For detailed advice, refer to our Import License Guide.
Import License Documents Required for Electromechanical OEST Systems
- Valid Manufacturing License from the country of origin
- Free Sale Certificate
- ISO 13485:2016 certification
- CE Certificate or equivalent international approvals
- Device Master File and Plant Master File
- Wholesale License (if applicable)
- Company Constitution and Incorporation Documents
Timeline and Processing Duration
License Type | Process Steps | Approximate Duration |
---|---|---|
MD9 Manufacturing | Test License + Testing + Audit + Query Resolution + License Grant | 4 to 5 months |
MD15 Import | Document Preparation + Application + Query Resolution + License Grant | 5 to 6 months |
Note: Timelines may vary based on query response times and completeness of application.
Government Fees and Costs
License Type | Application Fee | Per Product Fee |
---|---|---|
MD9 Manufacturing | Rs. 50,000 | Rs. 1,000 |
MD15 Import | USD 3,000 per site | USD 1,500 per product |
Additional costs include product testing fees, notified body audit charges, and consultancy fees if applicable.
Common Challenges and Solutions
- Delayed Product Testing: Plan testing schedules early and select labs from the CDSCO-approved list to avoid bottlenecks.
- Incomplete Documentation: Use checklists and templates from our Device and Plant Master File guides to ensure completeness.
- Audit Non-Compliance: Conduct internal audits and mock inspections to prepare for CDSCO audits.
- Query Response Delays: Assign dedicated regulatory personnel to monitor and respond promptly.
Our extensive experience helps clients anticipate and overcome these hurdles efficiently.
Expert Consultation and Support
Navigating the regulatory landscape for Class C electromechanical OEST systems can be complex. Our consultancy offers:
- End-to-end application preparation and submission
- Compliance gap analysis and corrective action planning
- Training for technical and regulatory teams
- Liaison with CDSCO and notified bodies
Partnering with experts ensures your licensing process is smooth, timely, and compliant.
Getting Started with Your CDSCO License Application
- Assess Device Classification: Confirm your device's Class C status and applicable licenses.
- Prepare Documentation: Begin compiling Device Master File and Plant Master File documents early.
- Apply for Test License (MD13): Initiate the test license application via the CDSCO MD Online Portal.
- Schedule Product Testing: Coordinate with CDSCO-approved labs to perform required tests.
- Plan for Audit: Prepare your manufacturing site and QMS for inspection.
- Submit MD9 Application: Post-testing, submit the manufacturing license application.
- Engage Expert Support: Consider professional regulatory consultancy to navigate complexities.
Taking these practical steps will position your electromechanical OEST system for successful entry into the Indian market, meeting all CDSCO regulatory mandates efficiently.