CDSCO License for Electronic monitor for gravity flow infusion systems
Medical Device Information
Intended Use
Inteded to electronically monitor the amount of fluid being infused into a patient.

Comprehensive Guide to CDSCO Licensing for Electronic Monitors for Gravity Flow Infusion Systems (Class C)
As a trusted regulatory consultancy with over 25 years of experience and having facilitated successful CDSCO license approvals for 500+ companies, we understand the nuances involved in navigating India's medical device regulatory landscape. In this guide, we offer detailed, actionable insights specifically tailored for manufacturers and importers of Electronic Monitors for Gravity Flow Infusion Systems—a Class C medical device under the category of General Hospital or Orthopaedic Instruments.
Introduction: Understanding Your Device and Its Regulatory Significance
Electronic monitors for gravity flow infusion systems are critical medical devices designed to electronically track the volume of fluid being infused into patients. Given their direct impact on patient safety and treatment efficacy, regulatory oversight is stringent. The notification 29/Misc./03/2020-DC (193)- Part-3 dated 16.03.2022 classifies this device as Class C under CDSCO’s risk-based framework, necessitating a Central Licensing Authority approval.
Ensuring compliance with CDSCO regulations not only facilitates legal market access in India but also builds trust with healthcare providers and end-users.
CDSCO Regulatory Framework for Electronic Monitors (Class C Devices)
The Central Drugs Standard Control Organization (CDSCO) governs licensing and registration of medical devices in India. Class C devices, including your electronic monitor, require an MD9 manufacturing license issued by the Central Licensing Authority. This process involves rigorous scrutiny of product safety, efficacy, and quality management systems.
Risk Classification and Licensing Requirements
Class C devices represent moderate-to-high risk devices. Their licensing process is more comprehensive than Class A/B but less complex than Class D. The MD9 license is mandatory for manufacturing within India, and for imports, an MD15 import license is required.
For detailed classification, manufacturers can refer to the Medical Device Classification guide.
Manufacturing License Process (MD9) for Class C Electronic Monitors
Obtaining an MD9 license is a multi-step process:
- Test License Application (Form MD13): Before the manufacturing license, you must secure a test license, which typically takes 1.5 to 2 months.
- Product Testing: Testing must be conducted at CDSCO-approved laboratories. Refer to the Testing Laboratories list to select an accredited lab.
- Document Preparation: Compile all requisite documents including Device Master File, Plant Master File, risk management files, and QMS documentation.
- License Application (Form MD7): Submit the manufacturing license application via the CDSCO MD Online Portal.
- Inspection and Audit: CDSCO inspectors will conduct an on-site audit of your manufacturing facility.
- Query Resolution: Address any queries or deficiencies raised by the inspectors or CDSCO officials.
- License Grant (Form MD9): Upon satisfactory review and audit, the manufacturing license is granted.
For a detailed walkthrough, consult our MD9 License Guide.
Manufacturing License Documents Required
Successful MD9 applications require comprehensive documentation, including but not limited to:
- Company Constitution and Incorporation Certificate
- Proof of Ownership or Lease of Manufacturing Premises
- Qualification and Experience Proof of Technical Staff
- Fire and Pollution No Objection Certificates (NOCs)
- Device Master File (DMF) outlining design, specifications, and manufacturing processes. Our Device Master File guide is an invaluable resource.
- Plant Master File detailing facility layout and quality control systems. Learn more in our Plant Master File guide.
- Essential Principles Checklist compliance
- Risk Management File aligned with ISO 14971 standards. Implement best practices from our Risk Management guide.
- Product Test Reports from CDSCO-approved labs
- Labels and Instructions for Use (IFU)
- Quality Management System (QMS) documents, preferably ISO 13485 certified
Import License Process (MD15) for Electronic Monitors
For importers, the MD15 license is essential. The process typically spans 5-6 months and involves:
- Preparation of comprehensive documentation including manufacturing license, Free Sale Certificate, ISO 13485:2016 certification, CE Certificate, Device and Plant Master Files, and wholesale license.
- Submission of Form MD14 application via the CDSCO MD Online Portal.
- Departmental review and query resolution.
- Grant of MD15 import license.
Our Import License Guide offers detailed insights.
Import License Documents Required
Key documents include:
- Manufacturing License from the country of origin
- Free Sale Certificate
- ISO 13485:2016 Certificate
- CE Certificate (if applicable)
- Device Master File and Plant Master File
- Valid Wholesale License in India
- Company Constitution and Importer details
Timeline and Processing Duration
License Type | Processing Time |
---|---|
Test License (MD13) | 1.5 to 2 months |
Manufacturing (MD9) | 4 to 5 months (inclusive of test license and audit) |
Import License (MD15) | 5 to 6 months |
Manufacturers should anticipate a total of approximately 4-5 months from test license application to MD9 license grant.
Government Fees and Costs
MD9 Manufacturing License Fees:
- Application Fee: Rs. 50,000
- Per Product Fee: Rs. 1,000
Test License Fee (MD13): Separate fee applicable per application (varies by state, typically Rs. 5,000–10,000)
Import License Fees (MD15): Based on device class and site, for Class C devices typically Rs. 3,000 per site and Rs. 1,500 per product
Budgeting for testing, documentation, and consultancy fees is also advised.
Common Challenges and Practical Solutions
Delays in Testing: Government-approved labs often have backlogs. Plan submissions early and consider multiple labs from the Testing Laboratories list.
Documentation Gaps: Incomplete or inconsistent Device Master Files and risk management documentation cause frequent queries. Utilize comprehensive templates and expert reviews.
Audit Readiness: Non-compliance found during CDSCO inspections can delay license approval. Conduct internal audits and gap analyses prior to official audits.
Query Management: Proactively address departmental queries by maintaining clear communication channels and submitting complete responses.
Expert Consultation and Support
Navigating CDSCO's regulatory framework requires specialized expertise. We recommend engaging with experienced consultants who can:
- Assist in document preparation tailored to your device
- Coordinate testing and audit scheduling
- Facilitate timely query resolution
- Provide training on compliance requirements
Our team’s track record with over 500 successful licenses positions us uniquely to streamline your regulatory journey.
Getting Started with Your CDSCO License Application
- Assess Your Device Classification: Confirm your device as Class C using official CDSCO resources.
- Gather Documentation: Begin compiling required documents, focusing on Device and Plant Master Files.
- Apply for Test License: Submit Form MD13 via the CDSCO MD Online Portal to initiate product testing.
- Select Approved Testing Laboratory: Choose from the CDSCO-accredited list and schedule product testing.
- Prepare Manufacturing License Application: Once test results are favorable, assemble the MD9 application using Form MD7.
- Schedule Pre-Audit Internal Review: Conduct mock audits internally to ensure readiness.
- Submit Application and Coordinate Audit: Engage with CDSCO inspectors during the audit phase.
- Respond to Queries Promptly: Maintain open communication with CDSCO.
- Obtain MD9 Manufacturing License: Begin or expand manufacturing operations post-approval.
Entering the Indian market with your Electronic Monitor for Gravity Flow Infusion Systems is a strategic step requiring meticulous regulatory adherence. With our extensive experience and practical guidance, your path to successful CDSCO licensing can be both efficient and compliant.
For personalized assistance and updated regulatory insights, connect with our expert team today.