Logo
Chat on WhatsApp

CDSCO License for Implant Trials

Medical Device Information

Device Class
Class B

Intended Use

Trials are temporary sizing guides which are used by surgeons to check the size and fit of orthopaedic implants before actual implantation of device. The product does not include orthopaedic implants.

Manufacturing License
MD5
Import License
MD15
CDSCO License for Implant Trials

Comprehensive Guide to CDSCO Licensing for Implant Trials (Class B Medical Device)

As seasoned regulatory consultants with over 25 years of experience and having supported more than 500 companies in securing CDSCO licenses, we understand the complexities and nuances involved in navigating the Indian medical device regulatory landscape. Implant Trials, classified as Class B devices under the Indian medical device framework, require meticulous adherence to CDSCO regulations to ensure market access and compliance.

Understanding Implant Trials and Their Regulatory Importance

Implant Trials are temporary sizing guides used by surgeons to verify the fit and size of orthopedic implants prior to the actual implantation. Importantly, these devices do not include the orthopedic implants themselves but are critical for surgical precision and patient safety. Given their direct involvement in surgical procedures, these devices are classified as Class B, representing a moderate risk category.

Regulatory oversight ensures these devices meet safety, quality, and performance standards to prevent surgical complications. Hence, obtaining the correct CDSCO license is mandatory before manufacturing or importing Implant Trials in India.

CDSCO Regulatory Framework for Implant Trials (Class B Devices)

The Central Drugs Standard Control Organization (CDSCO) governs medical device regulation in India, with classifications based on risk. Implant Trials fall under Class B, which are medium risk devices requiring a manufacturing license known as the MD5 license, issued by the State Licensing Authority.

The regulatory framework encompasses:

  • Test license acquisition (Form MD13) for product testing
  • Product testing at government-approved laboratories
  • Submission of comprehensive technical and quality documentation
  • Audit by notified bodies
  • Final licensing approval

This staged approach ensures conformity with the Medical Device Rules (2017) and relevant notifications such as Notification 29/Misc./03/2020-DC (193)- Part-3 dated 16.03.2022.

Risk Classification and License Requirements for Implant Trials

Implant Trials are classified as Class B devices per the notified list by CDSCO. This classification mandates:

  • Manufacturing License: MD5 license (issued by State Licensing Authority)
  • Application Form: MD3
  • Test License: MD13 (mandatory prior to MD5 application)
  • Testing: Performed at CDSCO-approved laboratories

For detailed device classification, you can refer to our Medical Device Classification resource.

Manufacturing License Process for Implant Trials (MD5 License)

The MD5 license process for Class B medical devices like Implant Trials involves several critical stages:

  1. Apply for Test License (MD13): Submit application via the CDSCO MD Online Portal. This license permits product testing and is valid for 6 months.
  2. Product Testing: Conduct testing at one of the government-approved testing laboratories. Testing typically takes 4-6 weeks.
  3. Documentation Preparation: Compile required documents including Device Master File, Plant Master File, Risk Management File, and more.
  4. Apply for Manufacturing License (MD5) Using Form MD3: Submit after successful product testing.
  5. Audit by Notified Body: Engage a notified body from the Notified Bodies List for a manufacturing facility audit.
  6. Respond to Queries: Address any observations raised by the licensing authority or notified body promptly.
  7. License Grant: Receive MD5 license on Form MD5 enabling legal manufacturing.

The entire process usually spans 3-4 months, depending on promptness of document submission and audit scheduling.

Manufacturing License Documents Required for Implant Trials

To ensure a smooth application, prepare the following documentation meticulously:

  • Company Constitution Documents: Certificate of Incorporation, Partnership Deed, etc.
  • Proof of Ownership or Rental Agreement of Manufacturing Premises
  • Technical Staff Details: Qualification certificates and experience proof
  • Fire NOC and Pollution Control NOC
  • Device Master File (DMF): Detailed design and specification documents (DMF Guide)
  • Plant Master File (PMF): Manufacturing processes and quality control systems (PMF Guide)
  • Essential Principles Checklist: Compliance with Indian Medical Device Rules
  • Risk Management File: Hazard analysis and mitigation strategies (Risk Management Resource)
  • Test Reports: From CDSCO-approved labs
  • Labels and Instructions for Use (IFU)
  • Quality Management System Documents: ISO 13485 certification and SOPs

Import License Process for Implant Trials (MD15 License)

If you plan to import Implant Trials, an MD15 import license issued by the Central Licensing Authority is mandatory. The process includes:

  • Preparation of comprehensive dossier including manufacturing license from country of origin, Free Sale Certificate, ISO 13485:2016, CE Certificate, Device and Plant Master Files
  • Submission of application on the CDSCO MD Online Portal
  • Resolution of queries
  • License grant on Form MD15

Note that no test license is required for imports. The processing time is approximately 5-6 months.

For detailed guidance, see our Import License Guide.

Import License Documents Required

  • Valid Manufacturing License from the country of origin
  • Free Sale Certificate
  • ISO 13485:2016 Certification
  • CE Certificate (if applicable)
  • Device Master File
  • Plant Master File
  • Wholesale License
  • Company Constitution Documents

Timeline and Processing Duration

Process StageDuration
Test License (MD13)1.5 - 2 months
Product Testing1 - 1.5 months
Documentation PreparationVariable (2-4 weeks recommended)
MD5 License Application & Audit1 - 1.5 months
Total Estimated Time3 - 4 months

Government Fees and Costs

  • Test License (MD13): Approximately Rs. 5,000 (variable by state)
  • MD5 Manufacturing License: Rs. 5,000 per application + Rs. 500 per product
  • Testing Costs: Vary depending on the number and complexity of tests
  • Audit Fees: Payable to notified body; varies by agency

Common Challenges and Practical Solutions

Challenge: Delays in audit scheduling

Solution: Early engagement with notified bodies to pre-book audit slots saves time.

Challenge: Incomplete or inconsistent documentation

Solution: Use comprehensive checklists and experienced consultants to review submissions.

Challenge: Test failures or repeated queries

Solution: Conduct pre-testing pilot runs and thorough internal audits before submission.

Challenge: Confusion regarding classification and license type

Solution: Refer to official notifications and consult experts to confirm device class early.

Expert Consultation and Support

Having guided over 500 companies through successful CDSCO licensing for Class B devices, we offer tailored consultation services including:

  • Classification confirmation
  • Device and plant master file preparation
  • Test license and product testing coordination
  • Audit facilitation
  • Query resolution support

Partnering with seasoned consultants minimizes delays, reduces compliance risks, and accelerates market entry.

Getting Started with Your CDSCO License Application for Implant Trials

  1. Confirm Device Classification: Verify Class B status based on the latest CDSCO notifications.
  2. Prepare Test License Application (Form MD13): Gather basic company and product information.
  3. Register on CDSCO MD Online Portal: Access the portal here to begin your application.
  4. Select a Government-Approved Testing Laboratory: Choose from the official Testing Laboratories list.
  5. Develop Comprehensive Documentation: Prepare Device Master File, Plant Master File, Risk Management File, and other technical dossiers.
  6. Plan for Facility Audit: Contact a notified body early via the Notified Bodies List.
  7. Submit Test License Application: Monitor and expedite the testing process.
  8. Compile and Submit MD5 License Application (Form MD3): Post successful testing and internal reviews.

By taking these actionable steps, manufacturers and importers of Implant Trials can confidently navigate the CDSCO regulatory process, ensuring timely licensing and compliant market access in India.

For further expert assistance, feel free to reach out to our consultancy team specialized in medical device regulatory affairs.

Get Expert Help

Free consultation for your medical device license

24/7 Support Available

Why Choose Us

500+ Licenses Obtained
100% Success Rate
15+ Years Experience
24/7 Support Available

About the Author

avatar
Tails Azimuth
@Twitter