CDSCO License for knee joint patellofemorotibial metal/polymer
Medical Device Information
Intended Use
Intended to be implanted to replace a knee joint

Comprehensive Guide to CDSCO Licensing for Knee Joint Patellofemorotibial Metal/Polymer Implant
Navigating the regulatory landscape for medical devices in India can be complex, especially for high-risk implants like the knee joint patellofemorotibial metal/polymer device. As experienced regulatory consultants with over 25 years supporting 500+ companies, we provide you with a detailed roadmap to obtain your CDSCO license efficiently and compliantly.
Knee Joint Patellofemorotibial Implant: Device Overview and Regulatory Importance
This device is a Class C orthopaedic implant intended to replace the knee joint, combining metal and polymer materials. As an implantable device, it falls under stringent regulatory scrutiny to ensure patient safety and performance reliability. The CDSCO notification 29/Misc/3/2017-DC (292), dated 06.06.2018, classifies this device under Class C, mandating a central licensing process.
CDSCO Regulatory Framework for Orthopaedic Implants (Class C Devices)
Orthopaedic implants like the knee joint patellofemorotibial device require licensing under the Medical Device Rules 2017, enforced by CDSCO. The regulatory framework demands thorough compliance with quality, safety, and performance standards. Manufacturers and importers must obtain a Manufacturing License (MD9) or Import License (MD15) from the Central Licensing Authority.
Risk Classification and License Requirements for Knee Joint Implants
Given the device's implantable nature and critical use, it is classified as Class C. This classification triggers the requirement for an MD9 Manufacturing License if produced domestically or an MD15 Import License if brought into India. Both licenses involve rigorous assessments including product testing, document audits, and factory inspections.
Manufacturing License Process (MD9) for Knee Joint Patellofemorotibial Devices
The MD9 license process is centralized and typically takes 4 to 5 months to complete. Here’s a stepwise overview:
- Test License Application (Form MD13): Initially, apply for a test license to conduct product testing. This phase takes approximately 1.5 to 2 months.
- Product Testing: Conduct testing at CDSCO-approved laboratories to verify compliance with Indian and international standards. Refer to the Testing Laboratories list for recognized facilities.
- Document Preparation: Compile necessary technical documentation including Device Master File, Plant Master File, Risk Management File, and Essential Principles Checklist.
- License Application (Form MD7): Submit the manufacturing license application through the CDSCO MD Online Portal.
- Audit by CDSCO Inspectors: CDSCO conducts a thorough factory audit to assess compliance with Good Manufacturing Practices (GMP) and QMS.
- Query Resolution: Address any questions or observations raised by the department or inspectors promptly.
- License Grant (Form MD9): Upon satisfactory compliance, the MD9 license is granted.
Manufacturing License Documents Required for MD9
To ensure a smooth application, prepare the following key documents:
- Company Constitution and Incorporation Certificate
- Proof of Ownership or Lease Agreement of Manufacturing Premises
- Details of Technical Staff with Qualifications
- Fire NOC and Pollution Control NOC
- Device Master File (DMF) detailing design, materials, and performance
- Plant Master File (PMF) describing manufacturing processes and facilities
- Essential Principles Checklist ensuring compliance with safety standards
- Risk Management File addressing hazard analysis and mitigation measures
- Test Reports from CDSCO-approved labs
- Product Labels and Instructions for Use (IFU)
- Quality Management System (QMS) documentation, preferably ISO 13485:2016 certification
For detailed guidance, our comprehensive Device Master File guide and Plant Master File guide can be invaluable.
Import License Process (MD15) for Knee Joint Implants
If you intend to import the device, the MD15 license process is under the Central Licensing Authority and generally requires 5 to 6 months. The steps include:
- Preparing all required documentation including Manufacturing License from the country of origin, Free Sale Certificate, ISO 13485:2016, CE Certificate, Device and Plant Master Files, and Wholesale License.
- Applying via the CDSCO MD Online Portal using Form MD14.
- Responding to any queries from CDSCO officers.
- Upon compliance, license issuance on Form MD15.
Import License Documents Required
- Valid Manufacturing License of the device from the country of origin
- Free Sale Certificate
- ISO 13485:2016 Certificate
- CE Certificate or equivalent regulatory approval
- Device Master File and Plant Master File
- Wholesale Drug License (if applicable)
- Company Constitution Documents
Timeline and Processing Duration
License Type | Process Duration |
---|---|
MD9 Manufacturing | 4 - 5 months |
MD15 Import | 5 - 6 months |
Test License (MD13) | 1.5 - 2 months (pre-requisite for MD9) |
Government Fees and Costs
License Type | Application Fee | Per Product Fee | Notes |
---|---|---|---|
MD9 | Rs. 50,000 | Rs. 1,000 | Central Authority |
MD15 | Class C/D: Rs. 3,000 per site | Rs. 1,500 per product | Central Authority |
Note that additional costs apply for product testing, notified body audits, and consultation.
Common Challenges and Solutions
Challenge: Delays in product testing due to backlogs at government labs.
Solution: Engage with multiple approved labs early and schedule testing promptly.
Challenge: Incomplete documentation causing audit rejections.
Solution: Utilize our detailed document checklists and expert review services to ensure completeness.
Challenge: Difficulty in addressing audit observations.
Solution: Prepare corrective action plans and consult regulatory experts to respond effectively.
Expert Consultation and Support
With over 25 years of experience and a track record of assisting more than 500 companies, we offer end-to-end regulatory consultancy:
- Gap analysis and documentation support
- Coordination with notified bodies and testing labs
- Audit preparation and representation
- Query resolution and post-approval compliance
Our expertise can significantly reduce the time to market and mitigate regulatory risks.
Getting Started with Your CDSCO License Application
- Assess your device classification and applicable license type – Confirm Class C status and whether you are manufacturing locally or importing.
- Gather required documents early – Start preparing your Device Master File, Plant Master File, Risk Management File, and QMS documents.
- Plan for product testing – Identify CDSCO-approved testing laboratories and book your testing slots promptly.
- Register on the CDSCO MD Online Portal – Submit your initial test license application (Form MD13) if manufacturing.
- Engage with expert consultants – Leverage our experience to streamline your application and audits.
- Maintain proactive communication with CDSCO during the review process to avoid delays.
Embarking on the CDSCO licensing journey for your knee joint patellofemorotibial implant requires meticulous planning and expert guidance. By following the outlined steps and leveraging our extensive experience, you can confidently navigate the regulatory requirements and bring your life-enhancing orthopaedic implant to the Indian market.
For more information, visit the CDSCO MD Online Portal to begin your application process today.