CDSCO License for Non-central circulatory temporary placement manual brachytherapy therapeutic radionuclide source
Medical Device Information
Intended Use
A non-central cardiovascular device containing an isotope naturally occurring or produced by an accelerator or a nuclear reactor, intended to be temporarily implanted in the body and to be removed after a prescribed duration of treatment. Used in brachytherapy, the device is placed and removed manually or under endoscopic observation.

Comprehensive Guide to CDSCO Licensing for Non-Central Circulatory Temporary Placement Manual Brachytherapy Therapeutic Radionuclide Source
Navigating the Indian regulatory landscape for medical devices can be complex, especially for specialized devices such as the Non-central Circulatory Temporary Placement Manual Brachytherapy Therapeutic Radionuclide Source. As a Class C radiotherapy device, it requires a rigorous licensing process under CDSCO (Central Drugs Standard Control Organization). With over 25 years of experience and having supported 500+ companies in acquiring CDSCO licenses, we provide you with detailed, actionable guidance to successfully obtain your MD9 manufacturing license and import license for this unique device.
Understanding the Device and Regulatory Importance
This device is designed for temporary implantation during brachytherapy treatments, leveraging radionuclide sources produced via accelerators or nuclear reactors. Given its invasive nature and radioactive content, Indian regulations classify it as a Class C medical device under the radiotherapy category. Compliance with CDSCO regulations is not only mandatory but critical to ensure patient safety, product efficacy, and market access.
CDSCO Regulatory Framework for Radiotherapy Devices
India regulates medical devices through the Medical Device Rules (MDR) 2017, enforced by CDSCO. Devices are categorized into Classes A, B, C, and D, based on risk. Your device falls under Class C, necessitating approval from the Central Licensing Authority. This means a more stringent evaluation process including product testing, documentation review, and facility audits.
Risk Classification and License Requirements for Your Device
- Device Name: Non-central circulatory temporary placement manual brachytherapy therapeutic radionuclide source
- Risk Class: C
- Regulatory Pathway: MD9 Manufacturing License (Form MD7)
- Authority: Central Licensing Authority (CDSCO HQ)
Obtaining an MD9 license involves several critical steps — from obtaining a test license, product testing in government-approved labs, document preparation, to final audits by CDSCO inspectors.
Step-by-Step Manufacturing License Process (MD9 License)
Test License Application (Form MD13): Before full manufacturing license, you need to apply for a test license which allows you to manufacture the device for testing and validation purposes. This process usually takes 1.5 to 2 months.
Product Testing: Post test license approval, your device must be tested at CDSCO-approved testing laboratories to verify compliance with Indian standards and essential principles. Refer to the CDSCO Testing Laboratories list to select an accredited lab.
Document Preparation: Prepare comprehensive documentation including Device Master File (DMF), Plant Master File (PMF), risk management files, and quality management system documents. Our detailed Device Master File guide and Plant Master File guide can assist you in assembling compliant files.
Application Submission (Form MD7): Submit your complete application for the MD9 license via the CDSCO MD Online Portal. Ensure all supporting documents are uploaded correctly to avoid delays.
CDSCO Inspection and Audit: CDSCO inspectors will conduct an on-site audit to verify manufacturing facilities and QMS compliance.
Query Resolution: Address any queries from CDSCO or inspectors promptly.
Grant of MD9 License: Upon successful audit and documentation approval, CDSCO grants the MD9 manufacturing license.
Manufacturing License Documents Required for Class C Device
- Company Constitution (Incorporation Certificate, Memorandum & Articles of Association)
- Proof of ownership or lease agreement for manufacturing premises
- Details and qualifications of technical and managerial staff
- Fire NOC and Pollution Control Board NOC
- Device Master File (DMF) including design, manufacturing process, and specifications
- Plant Master File (PMF) covering facility layout, equipment, and utilities
- Essential Principles Checklist confirming compliance with Indian MDR
- Risk Management File detailing hazard analysis and mitigation strategies (Risk Management Guide)
- Test Reports from CDSCO-approved laboratories
- Product labels and Instructions for Use (IFU)
- Quality Management System Certificates (e.g., ISO 13485:2016)
Import License Process (MD15 License) for Class C Devices
If you intend to import this device into India, an Import License (Form MD14 for application leading to MD15 license) from CDSCO is mandatory. Key points:
- No test license required before application.
- Submit comprehensive documentation including manufacturing license from country of origin, Free Sale Certificate, ISO 13485:2016, CE certificate (if applicable), Device and Plant Master Files, wholesale license, and company constitution.
- Application processed by Central Licensing Authority with a typical timeline of 5 to 6 months.
- Apply through the CDSCO MD Online Portal.
Timeline and Processing Duration
Stage | Duration |
---|---|
Test License (MD13) | 1.5 to 2 months |
Product Testing | 1 to 1.5 months |
Document Preparation | 1 month |
Application Review & Audit | 1 to 1.5 months |
Query Resolution & License Grant | 0.5 month |
Total Estimated Time: Approximately 4 to 5 months for the MD9 manufacturing license process.
Government Fees and Costs
- MD9 License Application Fee: ₹50,000 per application
- Per Product Fee: ₹1,000 per product
- Testing and Audit Costs: Variable depending on notified body and testing labs
Investing in professional assistance can save time and prevent costly errors. Our expertise ensures that your documentation, testing, and audits proceed smoothly.
Common Challenges and Practical Solutions
Challenge: Delays in obtaining test licenses and product testing results.
Solution: Start test license application early and select accredited, well-equipped testing laboratories from the official CDSCO Testing Laboratories list. Maintain proactive communication.
Challenge: Incomplete or non-compliant documentation causing repeated queries.
Solution: Use standardized templates for Device and Plant Master Files, risk management, and essential principles checklists. Our in-depth guides help ensure compliance.
Challenge: Audit failures due to facility or QMS inadequacies.
Solution: Conduct internal audits before CDSCO inspection, and engage notified bodies or consultants to pre-assess readiness. Check the list of notified bodies authorized for MD9 audit support.
Expert Consultation and Support
With over 25 years in regulatory consulting, we've assisted over 500 companies in navigating the CDSCO licensing maze. Our team offers:
- End-to-end application preparation
- Risk management and compliance advisory
- Coordination with notified bodies and testing labs
- Audit readiness training
- Post-license regulatory maintenance
Your success is our priority. Partnering with experts accelerates approval and market entry.
Getting Started with Your CDSCO License Application
Ready to initiate your MD9 manufacturing license application for your non-central circulatory brachytherapy device? Follow these practical steps:
- Register on the CDSCO MD Online Portal.
- Prepare and submit your test license application (Form MD13) promptly.
- Engage an accredited testing laboratory for sample analysis.
- Compile all required documentation using our comprehensive checklists and guides.
- Schedule internal audits and prepare for CDSCO inspection.
- Submit your MD9 license application (Form MD7) once testing and documentation are complete.
- Respond promptly to any CDSCO queries or audit findings.
Each of these steps demands meticulous attention to detail. Leveraging our tailored consultancy services ensures a streamlined licensing journey.
For further assistance and customized solutions tailored to your device, contact our regulatory experts today and take the first step towards successful market entry in India.