Logo
Chat on WhatsApp

CDSCO License for Non-  electroencephalo gram (EEG) physiological signal based seizure monitoring  system.

Medical Device Information

Device Class
Class C

Intended Use

A non-electroencephalogram (non-EEG) physiological signal based seizure monitoring system is a noninvasive prescription device that collects physiological signals other than EEG to identify physiological signals that may be associated with a seizure

Manufacturing License
MD9
Import License
MD15
CDSCO License for Non-  electroencephalo gram (EEG) physiological signal based seizure monitoring  system.

Comprehensive Guide to CDSCO Licensing for Non-EEG Physiological Signal Based Seizure Monitoring Systems (Class C Medical Device)

Navigating the regulatory landscape for medical devices in India can be complex, especially for specialized neurological devices such as the Non-electroencephalogram (non-EEG) physiological signal based seizure monitoring system. This noninvasive prescription device is designed to detect physiological signals associated with seizures without relying on EEG. As an experienced regulatory consultancy with over 25 years of service and 500+ successful CDSCO licensing projects, we provide you with an authoritative roadmap tailored to your device’s Class C risk classification.

Understanding the CDSCO Regulatory Framework for Neurological Devices

The Central Drugs Standard Control Organization (CDSCO) governs the import, manufacture, and sale of medical devices in India under the Medical Device Rules, 2017. Neurological devices like seizure monitoring systems fall under specialized scrutiny due to their critical role in patient safety.

Your device, notified under 29/Misc/03/2020-DC (201) dated 27.09.2021, is classified as Class C. This classification implies a moderate to high risk, necessitating a stringent approval process through the Central Licensing Authority.

Risk Classification and License Requirements for Your Device

Class C devices require the MD9 Manufacturing License, issued by the CDSCO Central Licensing Authority. This license ensures compliance with safety, efficacy, and quality norms, including the Essential Principles checklist and risk management protocols.

For importers, the MD15 Import License is applicable, but since your focus is on manufacturing, MD9 is your primary concern.

MD9 Manufacturing License Process for Class C Devices

The end-to-end process for obtaining an MD9 license typically spans 4 to 5 months and involves several critical steps:

  1. Test License (Form MD13): Mandatory prerequisite before full license application. Duration ~1.5 to 2 months.
  2. Product Testing: Conducted at CDSCO-approved government laboratories to validate device safety and performance.
  3. Document Preparation: Comprehensive compilation of documents including Device Master File (DMF), Plant Master File (PMF), risk management file, and quality management system documents.
  4. License Application (Form MD7): Submission through the CDSCO MD Online Portal for MD9 license.
  5. Audit and Inspection: CDSCO inspectors perform audits of manufacturing facility and documentation.
  6. Queries and Resolution: Addressing any queries or deficiencies raised by CDSCO.
  7. Grant of License (Form MD9): Upon successful review and audit.

Essential Documents Required for MD9 License

For your Non-EEG seizure monitoring device, ensure you prepare the following:

  • Company Constitution and Incorporation Documents
  • Proof of Ownership or Lease of Manufacturing Premises
  • Technical Staff Qualifications and Experience Certificates
  • Fire and Pollution No Objection Certificates (NOCs)
  • Device Master File (DMF): Detailed design, manufacturing process, and performance data (Device Master File Guide)
  • Plant Master File (PMF): Facility layout, equipment details, and quality control processes (Plant Master File Guide)
  • Essential Principles Checklist: Compliance with Indian Medical Device Rules
  • Risk Management File: Comprehensive risk analysis and mitigation strategies (Risk Management)
  • Test Reports: From CDSCO-approved laboratories (Testing Laboratories)
  • Labels and Instructions For Use (IFU)
  • Quality Management System (QMS) Documents: ISO 13485:2016 certification and related SOPs

Practical Tips for Document Preparation

  • Begin with a gap analysis against the Essential Principles checklist to ensure complete compliance.
  • Engage a notified body early to understand audit expectations (Notified Bodies List).
  • Maintain traceability matrices linking device specifications to test reports and risk controls.
  • Prepare bilingual IFUs, both in English and local languages, to facilitate regulatory acceptance and user understanding.

Import License Process (MD15) – For Importers

Although your device is Class C and primarily requires manufacturing license, importers should note the MD15 process:

  • Submit application on Form MD14 via the CDSCO MD Online portal.
  • Provide Manufacturing License, Free Sale Certificate, ISO 13485:2016, CE Certificate, Device and Plant Master Files.
  • Government fees vary: Class C devices attract a 3000sitefeeplus3000 site fee plus 1500 per product.
  • Timeline for MD15 license averages 5 to 6 months.

Timeline and Processing Duration Breakdown

StageDuration
Test License (MD13)1.5 – 2 months
Product Testing4 – 6 weeks
Document Preparation3 – 4 weeks
License ApplicationImmediate upon readiness
CDSCO Audit & Queries1.5 – 2 months
Total Time4 – 5 months

Timelines may vary based on completeness of submissions and audit scheduling.

Government Fees and Cost Considerations

  • MD9 License Application Fee: ₹50,000 per application
  • Product Fee: ₹1,000 per product
  • Test License Fee (MD13): Included in overall process
  • Additional Costs: Testing fees at government labs, notified body audit fees, consultancy fees if external support is engaged

Budgeting for these costs upfront helps prevent delays and ensures smooth processing.

Common Challenges and Solutions

  • Incomplete Documentation: Many applicants face delays due to missing or inconsistent documents. We recommend thorough pre-submission audits.
  • Audit Non-compliance: Facilities not meeting GMP or QMS requirements can fail audits. Early engagement with notified bodies and mock audits can mitigate this.
  • Testing Delays: Limited slots at government labs can prolong timelines. Pre-book testing and consider parallel documentation preparation.
  • Regulatory Updates: Stay updated with CDSCO notifications and amendments to avoid non-compliance.

Expert Consultation and Support

With over 25 years of dedicated experience and having assisted more than 500 companies, we specialize in guiding manufacturers through every regulatory nuance. Our services include:

  • End-to-end license application preparation
  • Gap analysis and compliance audits
  • Coordination with notified bodies and CDSCO
  • Training on QMS and risk management
  • Post-approval support and renewal management

Getting Started with Your CDSCO License Application

  1. Assess Your Device Classification: Confirm that the Non-EEG seizure monitoring system is Class C as per the official notification.
  2. Apply for Test License (MD13): Submit initial application on the CDSCO MD Online Portal to begin product testing.
  3. Engage Testing Laboratories Early: Coordinate testing schedules with CDSCO-approved labs to avoid bottlenecks.
  4. Compile Device and Plant Master Files: Develop or update your DMF and PMF ensuring they align with regulatory expectations.
  5. Prepare Risk Management and QMS Documentation: Implement documented processes compliant with ISO 13485 and Indian Medical Device Rules.
  6. Submit MD9 License Application (Form MD7): After test license approval and testing, upload all documentation via the CDSCO portal.
  7. Prepare for Audit: Conduct internal audits and mock inspections to be audit-ready.
  8. Address CDSCO Queries Promptly: Maintain open communication with CDSCO to resolve queries and expedite license approval.

Embarking on this regulatory journey with comprehensive preparation and expert support significantly enhances your chances of successful and timely license approval. Partner with us to leverage our deep insights and proven methodologies tailored specifically for neurological Class C devices like your Non-EEG physiological signal based seizure monitoring system.

For detailed assistance, reach out to our expert team to schedule a consultation and access customized regulatory pathways.


Explore further:

Your device’s safe and compliant entry into the Indian market starts here.

Get Expert Help

Free consultation for your medical device license

24/7 Support Available

Why Choose Us

500+ Licenses Obtained
100% Success Rate
15+ Years Experience
24/7 Support Available

About the Author

avatar
Tails Azimuth
@Twitter