CDSCO License for Otoacoustic emission system, battery- powered
Medical Device Information
Intended Use
An assembly of battery-powered devices designed to record and analyse the faint sounds hair cells in the inner ear emit [otoacoustic emission (OAE)] in response to a stimulus (e.g., click, tone burst, pure-tone signals) to test for a deficiency of function in the ear during diagnostic evaluation and/or neonatal screening. It typically consists of a portable programmable unit, an OAE probe, and eartips. The stimulus signal is emitted via the probe inserted into the ear canal and the response is recorded via a microphone in the probe; OAEs are absent/reduced in patients with hearing loss. The system may be combined with other audiological devices (e.g., tympanometer, ABR device).

Comprehensive Guide to CDSCO Licensing for Battery-Powered Otoacoustic Emission Systems (Class B)
Introduction: Understanding the Otoacoustic Emission System and Its Regulatory Importance
The Otoacoustic Emission (OAE) system, specifically the battery-powered variant, plays a vital role in pediatric and neonatal audiological diagnostics. This device records and analyses faint sounds produced by hair cells in the inner ear in response to auditory stimuli, helping detect hearing deficiencies early—crucial during neonatal screenings and diagnostic evaluations. Given its medical significance and patient safety implications, regulatory approval from the Central Drugs Standard Control Organization (CDSCO) in India is mandatory before marketing or manufacturing.
With over 25 years of experience assisting more than 500 companies navigate CDSCO licensing, we understand the nuances involved in securing timely approvals for Class B devices like the battery-powered OAE system. This guide provides a detailed, actionable roadmap tailored specifically for this device type.
CDSCO Regulatory Framework for Battery-Powered Otoacoustic Emission Systems
In India, medical devices are regulated under the Medical Device Rules (MDR) 2017, overseen by CDSCO. The battery-powered OAE system is classified as a Class B medical device, indicating low to moderate risk. For Class B devices, manufacturing licenses are issued by the respective State Licensing Authority under the MD5 license category.
The regulatory framework involves:
- Obtaining Test License (MD13) for initial product testing
- Product testing at CDSCO-approved laboratories
- Preparing comprehensive technical documentation
- Applying for Manufacturing License (MD5) via the CDSCO MD Online Portal
- Undergoing audits by notified bodies
- Addressing queries raised by regulators
This framework ensures that devices meet safety, quality, and performance standards before entering the Indian market.
Risk Classification and License Requirements for Class B Devices
The OAE system falls under Class B due to its diagnostic function and moderate risk profile. According to the Medical Device Classification, Class B devices require:
- Test license application on Form MD13
- Product testing from CDSCO-approved laboratories
- Manufacturing license application on Form MD3 (MD5 license)
- State-level licensing authority approval
This classification mandates a thorough but streamlined licensing process compared to higher-risk devices.
Manufacturing License Process for Battery-Powered OAE System (MD5 License)
The MD5 license process for Class B devices typically spans 3 to 4 months and involves the following steps:
Test License Application (Form MD13): Submit application for test license via the CDSCO MD Online Portal. This license permits product testing and is valid for 1 year.
Product Testing: Conduct necessary tests at government-approved labs listed on the CDSCO Testing Laboratories page to validate safety and performance.
Documentation Preparation: Compile required documents, including technical files, quality system documents, and risk assessments.
Manufacturing License Application (Form MD3): Submit the manufacturing license application online.
Audit by Notified Body: Arrange for an audit by a notified body from the Notified Bodies List for MD5 Audit.
Querie Resolution: Respond promptly to any queries raised by the CDSCO or notified body.
License Grant (Form MD5): Upon successful review and audit, the license is granted.
Manufacturing License Documents Required for OAE Systems
To ensure a smooth application, the following documentation must be meticulously prepared:
- Company Constitution or Incorporation Certificate
- Proof of Ownership or Lease Agreement of Manufacturing Premises
- Details and Qualifications of Technical Staff
- Fire NOC and Pollution Control NOC
- Device Master File (DMF) detailing design, materials, and manufacturing process
- Plant Master File (PMF) describing manufacturing facilities and quality control
- Essential Principles Compliance Checklist
- Risk Management File aligned with ISO 14971 standards
- Test Reports from CDSCO-recognized laboratories
- Product Labels and Instructions for Use (IFU)
- Quality Management System (QMS) Documents, preferably ISO 13485 certified
Having these documents organized and compliant with CDSCO expectations significantly reduces back-and-forth and accelerates approval.
Import License Process for Battery-Powered OAE Systems (MD15 License)
If you plan to import the device into India, the MD15 import license is mandatory. Managed by the Central Licensing Authority, the process typically takes 5 to 6 months and includes:
- Comprehensive documentation preparation
- Application submission on Form MD14 via the CDSCO MD Online Portal
- Review and queries resolution
- License issuance on Form MD15
Unlike manufacturing licenses, no test license is required for import. However, robust technical documentation, including manufacturing licenses from the country of origin, ISO 13485 certification, and Free Sale Certificates, are prerequisites.
Import License Documents Required for Battery-Powered OAE Systems
Essential documents for MD15 import license applications include:
- Valid Manufacturing License from the country of origin
- Free Sale Certificate
- ISO 13485:2016 Certification
- CE Certificate or equivalent international approvals
- Device Master File
- Plant Master File
- Wholesale License for distribution in India
- Company Constitution
Ensure these documents are well-organized and authentic to avoid delays.
Timeline and Processing Duration
For Manufacturing License (MD5): Approximately 3 to 4 months
- Test License (MD13) Approval: 1.5 to 2 months
- Product Testing: 3 to 6 weeks (variable)
- Document Preparation and Submission: 2 to 3 weeks
- Notified Body Audit and Query Resolution: 4 to 6 weeks
For Import License (MD15): Approximately 5 to 6 months
- Document Preparation: 3 to 4 weeks
- Application Review and Query Resolution: 4 to 5 months
Planning your project timeline with these estimates helps set realistic market entry expectations.
Government Fees and Costs for CDSCO Licensing
- MD5 Manufacturing License: Application fee Rs 5000 + Rs 500 per product
- MD13 Test License: No separate fee beyond application processing
- MD15 Import License: Fee depends on device class; for Class B, expect approximately Rs 150,000 (converted from USD fees)
Additional costs include:
- Testing laboratory fees (varies by test complexity)
- Notified Body audit charges
- Documentation preparation and consultancy fees
Budgeting comprehensively ensures smooth financial planning.
Common Challenges and Practical Solutions
Challenge: Delays due to incomplete documentation
Solution: Use checklists and templates; consult expert guides such as our MD5 License Guide.
Challenge: Coordinating product testing and audit schedules
Solution: Engage early with CDSCO-approved testing labs and notified bodies to secure timely appointments.
Challenge: Responding to regulatory queries
Solution: Prepare detailed, evidence-backed responses with support from experienced regulatory consultants.
Challenge: Understanding state versus central authority jurisdiction
Solution: For Class B devices like the battery-powered OAE system, apply through the State Licensing Authority to avoid misfiling.
Expert Consultation and Support
Navigating CDSCO licensing can be complex, especially with evolving regulations. Our 25+ years of experience and over 500 successful client engagements position us as your trusted partner. We offer:
- End-to-end license application management
- Documentation review and gap analysis
- Coordination with notified bodies and testing labs
- Training on compliance and regulatory updates
Our goal is to minimize time-to-market and ensure regulatory compliance with minimal hassle.
Getting Started with Your CDSCO License Application for Battery-Powered OAE Systems
Assess Your Device Classification: Confirm your device as Class B via the Medical Device Classification tool.
Register on the CDSCO MD Online Portal: Create your account and familiarize yourself with the interface at the CDSCO MD Online Portal.
Initiate Test License Application (Form MD13): Prepare and submit your test license application promptly.
Identify Testing Laboratories: Select a CDSCO-approved lab from the Testing Laboratories list.
Gather Documentation: Start compiling your Device Master File, Plant Master File, and related documents using expert guides.
Plan for Audit: Contact notified bodies early to schedule your audit; review the Notified Bodies List for options.
Consult Experts: Engage with seasoned regulatory consultants to streamline the process and avoid common pitfalls.
Embarking on your CDSCO licensing journey with a clear, stepwise plan enhances your chances of timely approval and successful market entry.
For tailored assistance and detailed project planning, connect with our regulatory experts today.