Logo
Chat on WhatsApp

CDSCO License for Ultrasonic pulsed echo imaging system

Medical Device Information

Device Class
Class B

Intended Use

An ultrasonic pulsed echo imaging system is a device intended to project a pulsed sound beam into body tissue to determine the depth or location of the tissue interfaces and to measure the duration of an acoustic pulse from the transmitter to the tissue interface and back to  the receiver.

Manufacturing License
MD5
Import License
MD15
CDSCO License for Ultrasonic pulsed echo imaging system

Understanding Ultrasonic Pulsed Echo Imaging Systems and Their Regulatory Importance

Ultrasonic pulsed echo imaging systems are specialized medical devices used extensively in interventional radiology. Designed to project pulsed sound beams into body tissues, these systems help determine tissue depth or location by measuring acoustic pulse durations. Given their diagnostic significance and patient safety impact, regulatory compliance with the Central Drugs Standard Control Organization (CDSCO) is mandatory for manufacturers and importers targeting the Indian market.

With over 25 years of experience supporting 500+ companies, we understand the complexities involved in securing CDSCO licenses for Class B devices like ultrasonic pulsed echo imaging systems. This guide demystifies the regulatory framework, documentation, costs, timelines, and common challenges, empowering you to proceed confidently.

CDSCO Regulatory Framework for Ultrasonic Pulsed Echo Imaging Systems

In India, medical devices are regulated under the Medical Device Rules (MDR) 2017, enforced by CDSCO. Classified as Class B devices (low-moderate risk), ultrasonic pulsed echo imaging systems require a Manufacturing License (MD5) granted by the State Licensing Authority.

The relevant notification—29/Misc./03/2020-DC (146)—dated 26.07.2021, specifically governs this device category under interventional radiology. Compliance ensures your device meets essential safety, quality, and performance standards before market entry.

Risk Classification and License Requirements for Class B Devices

Class B devices like ultrasonic pulsed echo imaging systems pose moderate risk. The licensing pathway involves:

  • Test License (MD13): Preliminary authorization to manufacture and test the device.
  • Manufacturing License (MD5): Full license to manufacture and market within the state.

This two-step process ensures rigorous evaluation, including product testing and facility audits.

For more on device classification, visit our detailed Medical Device Classification resource.

Manufacturing License Process (MD5) for Ultrasonic Pulsed Echo Imaging Systems

Step 1: Obtain Test License (Form MD13)

  • Submit application via the CDSCO MD Online Portal.
  • Typical processing time: 1.5 to 2 months.
  • Purpose: To allow product testing and preliminary manufacturing under supervision.

Step 2: Product Testing

  • Get your device tested at CDSCO-approved labs listed here.
  • Testing typically covers electrical safety, biocompatibility, and performance validation.

Step 3: Prepare Documentation

  • Compile a comprehensive dossier including quality systems, risk management, and device-specific files.

Step 4: Apply for Manufacturing License (Form MD3)

  • Submit the full application along with test reports and audit readiness.

Step 5: Facility Audit by Notified Body

  • Engage a notified body from the official Notified Bodies List for an on-site audit.
  • Audit focuses on GMP compliance, QMS, and technical capabilities.

Step 6: Query Resolution and License Grant

  • Address any queries from CDSCO or the notified body promptly.
  • Upon successful evaluation, receive your MD5 license allowing commercial manufacturing.

For an in-depth understanding, refer to our MD5 License Guide.

Manufacturing License Documents Required

To streamline your application, prepare the following documents carefully:

  • Company Constitution and Incorporation Certificates
  • Proof of Ownership or Lease of Manufacturing Premises
  • Technical Staff Qualifications and Experience
  • Fire Safety NOC and Pollution Control NOC
  • Device Master File (DMF): Detailed device specifications and design
  • Plant Master File (PMF): Facility layout and manufacturing processes
  • Essential Principles Compliance Checklist
  • Risk Management File tailored to ultrasonic pulsed echo imaging systems
  • Test Reports from CDSCO-approved laboratories
  • Product Labels, Instructions for Use (IFU)
  • Quality Management System (QMS) Documents, e.g., ISO 13485 certification

Refer to our guides on Device Master File and Plant Master File preparation for expert insights.

Import License Process (MD15) for Ultrasonic Pulsed Echo Imaging Systems

For importers, an MD15 Import License issued by CDSCO’s Central Licensing Authority is required before product distribution in India.

Process Overview:

  • Application submission on the CDSCO MD Online Portal.
  • No test license required for import.
  • Documentation evaluation including manufacturing license from the country of origin, Free Sale Certificate, ISO 13485:2016, CE Certificate, and QMS evidence.
  • License issuance typically within 5-6 months.

For detailed guidance, please see our Import License Guide.

Import License Documents Required

  • Valid Manufacturing License from Country of Origin
  • Free Sale Certificate (FSC) or Equivalent
  • ISO 13485:2016 Quality Management Certificate
  • CE Certificate or Equivalent International Certification
  • Device Master File and Plant Master File
  • Wholesale License (if applicable)
  • Company Constitution and Incorporation Documents

Timeline and Processing Duration

Process StepDuration
Test License (MD13)1.5 – 2 months
Product Testing2 – 3 weeks
Manufacturing License1.5 – 2 months
Facility AuditScheduled during License Phase
Query Resolution2 – 4 weeks

Total Time for MD5 License: Approximately 3-4 months

Import licenses (MD15) generally take 5-6 months due to centralized processing.

Government Fees and Costs

For your ultrasonic pulsed echo imaging system classified as Class B:

  • MD5 Manufacturing License:

    • Application Fee: Rs. 5,000
    • Per Product Fee: Rs. 500
  • Test License (MD13): Included as part of the overall license process

  • Import License (MD15):

    • Site Fee: $2,000
    • Per Product Fee: $1,000

Note: Additional costs include notified body audit fees, testing laboratory charges, and consultancy fees if applicable.

Common Challenges and Solutions

Challenge: Delays due to incomplete documentation or non-compliance with essential principles.

Solution: Conduct pre-submission internal audits and gap analysis using our detailed checklists.

Challenge: Difficulty in scheduling audits with notified bodies.

Solution: Engage notified bodies early and maintain flexible schedules; utilize the official Notified Bodies List for options.

Challenge: Extended product testing timelines due to laboratory backlog.

Solution: Plan testing well in advance and select multiple CDSCO-approved labs as per Testing Laboratories.

Challenge: Risk management file inadequacies.

Solution: Implement robust risk management aligned with ISO 14971 standards; see our Risk Management guide.

Expert Consultation and Support

Navigating CDSCO licensing requires precision and experience. Our team has successfully guided over 500 manufacturers and importers through the regulatory maze for devices like ultrasonic pulsed echo imaging systems. We offer:

  • Customized document preparation and review
  • End-to-end application management on the CDSCO portal
  • Liaison with notified bodies and testing labs
  • Post-approval compliance support

Partnering with experts mitigates risks of application rejection and accelerates market entry.

Getting Started with Your CDSCO License Application

To initiate your CDSCO license application for the ultrasonic pulsed echo imaging system:

  1. Register on the CDSCO MD Online Portal for application submission.
  2. Conduct a comprehensive gap analysis of your product and manufacturing setup against CDSCO requirements.
  3. Prepare and submit the test license application (Form MD13) along with preliminary documentation.
  4. Schedule product testing with a CDSCO-approved lab.
  5. Initiate Device Master File and Plant Master File compilation.
  6. Engage a notified body early for the upcoming audit.
  7. After successful testing and audit, apply for the manufacturing license (Form MD3).
  8. Respond promptly to any CDSCO queries to avoid delays.

Our proven roadmap ensures your ultrasonic pulsed echo imaging system achieves timely regulatory approval, paving the way for successful commercialization in India.

For personalized assistance, contact us to leverage our 25+ years of regulatory expertise.

Get Expert Help

Free consultation for your medical device license

24/7 Support Available

Why Choose Us

500+ Licenses Obtained
100% Success Rate
15+ Years Experience
24/7 Support Available

About the Author

avatar
Tails Azimuth
@Twitter