CDSCO License for Patient lift, Electrcially powered
Medical Device Information
Intended Use
Inteded to lift and transport patients in hsoptial in the horizontal or other required position from one place to another, as from a bed to a bath.

Comprehensive Guide to CDSCO Licensing for Electrically Powered Patient Lifts (Class B)
Patient lifts, electrically powered, are critical medical devices designed to safely lift and transport patients within healthcare facilities, such as moving a patient from bed to bath. Classified under Class B medical devices by CDSCO, these patient lifts fall within the category of General Hospital or Orthopaedic Instruments, as per Notification 29/Misc./03/2020-DC (193)- Part-3 dated 16.03.2022. Navigating the regulatory landscape in India is essential for manufacturers and importers to ensure compliance and market access.
With over 25 years of experience and having assisted 500+ companies in obtaining CDSCO licenses, we provide a detailed, step-by-step guide tailored specifically for electrically powered patient lifts.
CDSCO Regulatory Framework for Electrically Powered Patient Lifts
The Central Drugs Standard Control Organization (CDSCO) regulates medical device manufacturing and import in India to ensure safety and efficacy. Patient lifts being Class B devices, require a manufacturing license under the MD5 category, granted at the State Licensing Authority level. Importers must obtain an MD15 import license from the Central Licensing Authority.
All applications are processed electronically via the CDSCO MD Online Portal, which streamlines submissions, document uploads, and communication.
Risk Classification and License Requirements
Patient lifts, electrically powered, are categorized as Class B devices due to moderate risk associated with their use. This classification mandates compliance with:
- Manufacturing License (MD5) via Application Form MD3
- Test License (MD13) prior to manufacturing license application for product testing
- Adherence to essential principles and quality management system (ISO 13485:2016)
For Class B devices, the entire license acquisition process typically spans 3 to 4 months.
Manufacturing License Process (MD5) for Class B Patient Lifts
The MD5 license application process involves several critical steps:
- Obtain Test License (Form MD13): Apply for a test license to legally manufacture samples for testing. This step takes 1.5 to 2 months.
- Product Testing: Conduct mandatory product testing at CDSCO-approved laboratories to ensure compliance with Indian standards. A list of government-approved Testing Laboratories is available.
- Prepare Documentation: Compile all necessary documents including Device Master File, Plant Master File, Risk Management File, and others.
- Submit MD5 Application (Form MD3): File the manufacturing license application through the CDSCO MD Online Portal.
- Audit by Notified Body: A notified body conducts a factory audit to verify compliance with Good Manufacturing Practices and QMS. Manufacturers may check the list of notified bodies authorized for audits.
- Resolve Queries: Respond promptly to any queries or observations raised by CDSCO officials or notified bodies.
- Grant of License: Upon satisfactory compliance, the State Licensing Authority issues the MD5 manufacturing license.
Manufacturing License Documents Required
For your electrically powered patient lift, the following documents must be meticulously prepared:
- Company Constitution and Registration Proof
- Proof of Ownership or Lease of Manufacturing Premises
- Qualification and Experience Details of Technical Staff
- Fire and Pollution NOCs
- Device Master File (DMF): Detailed device specifications, design, and manufacturing process (Device Master File Guide)
- Plant Master File (PMF): Facility layout, equipment details, and production environment (Plant Master File Guide)
- Essential Principles Compliance Checklist
- Risk Management File demonstrating hazard identification and mitigation strategies (Risk Management Guide)
- Test Reports from approved laboratories
- Product Labels and Instructions for Use (IFU)
- Quality Management System Documents (ISO 13485:2016)
Ensuring these documents are accurate and complete significantly reduces delays.
Import License Process (MD15) for Patient Lifts
If you are an importer, obtaining the MD15 import license is mandatory. The process is as follows:
- Document Preparation: Prepare import-specific documentation including manufacturing license from the country of origin, Free Sale Certificate, ISO 13485 certification, CE Certificate, Device Master File, Plant Master File, and wholesale license.
- Submit Application (Form MD14): Apply through the CDSCO MD Online Portal.
- Query Resolution: Address any queries from the Central Licensing Authority.
- License Issuance: Upon approval, the MD15 import license is granted.
The import license process typically takes 5 to 6 months and does not require a test license.
Import License Documents Required
- Valid Manufacturing License from the country of origin
- Free Sale Certificate
- ISO 13485:2016 Certification
- CE Certificate or equivalent
- Device Master File and Plant Master File
- Wholesale License for distribution
- Company Constitution and Registration Proof
Timeline and Processing Duration
License Type | Processing Time Estimate | Key Steps Included |
---|---|---|
Test License (MD13) | 1.5 - 2 months | Application, testing, certificate issuance |
Manufacturing License (MD5) | 3 - 4 months | Audit, document review, query resolution |
Import License (MD15) | 5 - 6 months | Document scrutiny, query resolution, license grant |
Note: Timelines may vary based on document completeness and responsiveness to queries.
Government Fees and Costs
For your Class B electrically powered patient lift:
- MD5 Manufacturing License:
- Application Fee: Rs. 5,000
- Per Product Fee: Rs. 500
- Test License (MD13): Included in the license process
Additional costs to consider:
- Testing charges at government-approved labs (varies by test scope)
- Audit fees payable to notified bodies (varies by agency)
- Professional consulting fees if engaging regulatory experts
Budgeting realistically for these expenses ensures smooth compliance.
Common Challenges and Practical Solutions
Challenge: Delays due to incomplete documentation or non-compliance with risk management requirements.
Solution: Engage experienced regulatory consultants early to assist with comprehensive documentation preparation, including detailed risk management plans aligned with ISO 14971.
Challenge: Audit non-conformities related to manufacturing processes or QMS.
Solution: Conduct internal audits and mock inspections before notified body visits. Maintain robust training records and process controls.
Challenge: Confusion over product classification impacting license type.
Solution: Verify device classification using authoritative resources such as the Medical Device Classification guide to avoid misfiling.
Expert Consultation and Support
Navigating CDSCO licensing can be complex, especially for devices like electrically powered patient lifts which require stringent compliance. Our team has successfully guided over 500 manufacturers and importers through this process, ensuring timely approvals and compliance.
We offer:
- Gap analysis of existing documentation
- End-to-end application filing support
- Coordination with testing laboratories and notified bodies
- Post-license compliance advisory
Partnering with an experienced consultant mitigates risks and expedites market entry.
Getting Started with Your CDSCO License Application
- Determine the License Type: As a manufacturer of Class B patient lifts, prepare to apply for an MD5 license.
- Register on the CDSCO MD Online Portal: Begin by creating your account and familiarizing yourself with the submission system.
- Prepare Your Test License Application (MD13): Gather initial documentation and apply for the test license to initiate product testing.
- Engage Accredited Testing Laboratories: Choose labs from the CDSCO-approved Testing Laboratories list to perform mandatory tests.
- Compile Comprehensive Documentation: Use our Device Master File Guide and Plant Master File Guide to structure your submissions.
- Plan for Audit: Schedule audits with a notified body from the notified bodies list.
- Maintain Clear Communication: Respond promptly to any CDSCO or notified body queries to avoid delays.
Starting early and following a structured approach will smooth your path to obtaining the CDSCO MD5 license for your electrically powered patient lifts.
For personalized assistance or to discuss your specific regulatory needs, contact our expert team today and leverage our 25+ years of proven experience.
Ensure your patient lift devices meet India's regulatory standards efficiently and confidently with our comprehensive support.